Workers then take out beams and concrete flooring, which are carried to ground
level by a crane system that generates electricity as the pieces are lowered.
Not exact matches
On each
level, the objective is to move colored crates from one place to another
by programming a claw
crane to move left or right, and drop or pick up.
A building tower
crane hosted each of the Telus letters into place, while crews waited in suspended compartments that looked like window - washing equipment, held up
by six
levels of temporary scaffolding and beams cantilevering out over the tops of the glass walls.
One can simply see
by driving through Maputo the high
level of construction activity, with
crane after
crane dominating the new emerging skyline, with many either nearing completion or newly completed.