Not exact matches
Large price spikes immediately before and after mid-day periods when both utility - scale and distributed solar generation reaches its
peak level suggest a need for dispatchable generation sources to help cover ramping periods, when the need for power from the grid to meet
load is rapidly changing.
We would run three turbines now, anytime we need
peak load, we will bring in an additional turbine or two and when the
load goes down we will keep reducing again so that we can nurse the lake back to its original
level.
While the
load was low and therefore only led to small - to - moderate
levels of hamstrings EMG amplitude, the researchers did find that there was a time difference in the hamstrings EMG amplitude in that in the straight - leg lift the
peak EMG amplitude occurred early in the lift but in the bent - leg lift the
peak occurred later on.
The 2017 Honda Accord Hybrid starts at $ 29,605 for the base Hybrid model and
peaks at $ 35,955 for the
loaded Touring trim
level that I was able to test with its leather trim, Apple CarPlay and Android Auto, navigation and more.
It's
loaded with chicken meal and and chicken fat to give your dog the energy it needs to perform at it's
peak level.
It's
loaded with chicken meal and chicken fat to give your dog the energy it needs to perform at its
peak level.
Loaded with the richly - nourishing proteins and fats that all puppies require for
peak health and development, ORIJEN PUPPY's low - carbohydrate, low - glycemic formula supports stable blood sugar
levels while delivering all of the energy that active puppies need to take on their exciting world.
In June I heard a report about a new EU - wide study done in the UK that showed clearly that by combining all forms of renewables: wind all over Europe, solar in North Africa, hydo, hydro storage, solar thermal, and demand management, you could meet a slowly growing EU
load with almost no natural gas for
peaking plants to help
level the
load.
As long as solar is a relatively small part of the mix, it actually helps
level the
load curve, because demand is so much higher during the day than at night, and particularly if you have a lot of nuclear in the mix, solar will reduce the need for
peaking generation.
Modeling has also shown that it's relatively inexpensive to increase the reliability of the total wind output to a
level equivalent to a coal - fired power station by adding a few low - cost
peak -
load gas turbines that are opearated infrequently, to fill in the gaps when the wind farm production is low (Diesendorf 2010).
Developing forecasts of electricity consumption and
peak loads for major customer classes (residential, commercial, and industrial), drawing on publicly available, state -
level economic, climate, and energy data
I believe renewable energy decisions should be made at State and local
levels — looking for the «right fits» that make sense (i.e.,
peaking loads, as the Forbes article on Georgia discussed).
«An aggregated fleet of vehicles or chargers can act as a [demand response] resource, shifting
load in response to price signals or operational needs; for example, vehicle charging could be shifted to the middle of the day to absorb high
levels of solar generation and shifted away from evening hours when solar generation disappears and system net
load peaks.»