It has a gorgeous kitchen brick fireplace that extends nearly the entire wall and a gorgeous
library wall in the living room.
Not exact matches
Guests can relax
in the inviting
living room, peruse the
library, use the guest computer, enjoy coffee and a cookie day or night
in the snack nook, or soak up some sun
in the
walled -
in rear patio.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire
life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator
rooms,
library, offices, kitchens, multipurpose
rooms, break
rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington
Library • Oversee demolition of existing
library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain
wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior
walls on 3 sides of the building and install complex new curtain
wall system
in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
Completing the main level is the den /
library which features built -
in shelving on two
walls and could also make a great media
room. Upstairs you will find a large second
living or recreational space, a loft area, large covered balcony with incredible views of Mt. Ashland and a workout
room (could easily be a 4thbedroom).
Remember back when I built the custom
library wall unit
in my
living room?
I have a couple
rooms I would LOVE some help with and actually have a small budget to do the work I have a
library that is freshly painted but needs the shelves and a window seat built
in and some chairs placed... I have an upstairs
living room that needs new furniture and
wall paint because it is the friend entertainment center for 2 teenage girls and one wants an updated look (she just got a new dresser, desk and chair for her bedroom from maru at urbanfarmgirl, to give you an idea of her clean style) and then I have the longest running project ever, the laundry
room, that needs beadboard, a painted wood floor and a work area for momma.
I realized that the antique china cupboard my mother had given us would fit on one of the
walls in the «
living room» and that if I gave our adult son one of the love - seats, the other would fit perfectly
in what I would begin calling the
library (the
room was too small to be considered a
living room).
Her decorator instincts prompted changes that included removing an entrance
wall to make way for a small
library and adding a
living room fireplace framed
in cherry to match the kitchen cabinets.
Open shelving makes use of an otherwise redundant area between the
wall and the pillar
in the
living room, and mirrors the built -
in bookcase, creating the mood of a mini
library in the open - plan space.