Sentences with phrase «life cycle costs»

Significantly lower life cycle costs, recycled content, simple maintenance and no VOCs yield a family - and environmentally - friendly combination.
Common duties seen on a Rotating Equipment Engineer resume examples include analyzing life cycle costs, developing quality assurance standards, purchasing spare parts for repairing equipment, and making sure rotating equipment projects are completed in time.
4 Issue 4) that «offshore vertical - axis wind turbines offer the potential for a break through in offshore wind energy availability and reduced life cycle costs due to their design characteristics of few moving parts and the sitting of the generator at the base level potentially allowing large - scale direct drive.
Why I Prefer Wind to Nuclear... The claim covered total energy and carbon dioxide emissions and the conclusion was that hybrids... Life cycle Costs.
Does not even consider life cycle costs: wind turbines wear out and have to be replaced.
Thoughts on life cycle costs of efficient vs not efficient cars... Our Prius goes over 100K miles — $ 10K in savings!
This takes into account more than just the acquisition cost, but also addresses maturation costs, maintenance costs, and life cycle costs of owning a living roof system.
Topics at this year's conference pushed the building industry to think beyond energy efficiency and consider full life cycle costs of materials, transportation issues, and living buildings.
We can kick that down the road cause politicians can only count to 4 or 5 (depending on your particular voting system) and they don't even know what Present Value, Future Value, and Life Cycle Costs are.
«When considering the life cycle costs, Certified Passive House Components are almost always the best choice, both for new builds and for retrofits,» says Dr. Wolfgang Feist, Director of the Passive House Institute in Darmstadt, Germany.
Using ultracapacitor energy storage to further reduce life cycle costs, this next - generation hybrid bus has achieved Ultra Low Emission Bus certification with 37 % lower greenhouse gas... Read more →
BEFMG members have been at the forefront of the development of new products to match this standard — delivering products which support improved lifelong back care for our children, better academic outcomes through comfort which leads to improved concentration and outstanding value for money through product durability and life cycle costs
This would also provide estimated savings of EUR 33 million in medical life cycle costs based on a single year (2009).
He also asked that the Department of National Defence start to apply a full life cycle cost estimate, and it also has done that.»
The Erie County Division of Sewerage Management (DSM) evaluated various alternatives and based on life cycle cost analyses determined that a new gravity sewer eliminating the pumping station is the most cost effective and beneficial solution for the ratepayers of the sewer district.
«In the past decades, there have been so many ad hoc solutions provided, but there has been no work on evaluating its life cycle cost and sustainability.»
In order to study the different configurations of RWH, the following methodologies were used: exergy analysis and exergetic efficiency analysis to determine resource consumption and efficiency; life cycle assessment (LCA) to identify environmental impacts; life cycle costing (LCC) to find economic feasibility, and data envelopment analysis (DEA) to identify the frontiers of best - practice towards sustainability.
-- Effective on January 1, 2033, and once every 3 years thereafter, the Secretary shall determine, after notice and opportunity for comment, whether further energy efficiency building code improvements for residential or commercial buildings, respectively, are life cycle cost - justified and technically feasible, and shall establish updated national building code energy efficiency targets that meet such criteria.
The management approach, however, needs to change to focus on overall life cycle cost and a well - defined launch date.»
In conjunction with life cycle cost estimation, they allow the quantification of the cost - effectiveness of proposed materials improvements.
The life cycle cost certainly will grow because the launch will be delayed and therefore the operational period will extend through additional years, he said.
Life Cycle Cost Overview for Different Transit Technologies Center for Transportation and the Environment An overview of the life cycle costs for different transit technologies.
This study uses a life cycle costing (LCC) methodology to identify when hydrogen can become economically feasible compared to the conventional fuels and which energy policy is the most effective at fostering the penetration of hydrogen in the competitive fuel market.
The awards, which are given out annually, consider eight major areas of expense — financing, fueling, maintenance, repairs, insurance, fees and taxes, depreciation, and opportunity cost — and analyze 28 different life cycle cost scenarios to yield an accurate picture of each vehicle's true total average cost.
The best way to look at it is from the perspective of life cycle cost, not acquisition cost.
«Electrical energy storage systems: A comparative life cycle cost analysis.»
Challenging the industry on the superior total life cycle cost efficiency and reliability of PMG - FPC drivetrain solutions
To estimate vehicle owner impacts, the paper calculates the life cycle cost (LCC) of private vehicle transportation for vehicle owners with PHEVs and compares it with the LCC for conventional light - duty vehicles.
GreenSave Life Cycle Cost Calculator -(Partnership between Green Roofs for Healthy Cities, TREMCO Roofing and Building Maintenance, and the Athena Institute)
Most National Ozone Units are confident that low - or zero - GWP refrigerants alternatives are already economically competitive due to their total environmental impact, energy efficiency and performance, safety and reliability, and life cycle cost.
Professional assistance providers should check out the list of professional tools as well as a sample Life Cycle Cost (LCC) analysis comparing the performance, economics, and other features of water heating options (including solar).
Andy Holt, general manager of global wind projects and services, said: «This is the first facility of its kind dedicated to developing repair technologies and capabilities that reduce the life cycle cost of wind turbines.
A study published by researchers at Harvard in 2011 found that the full life cycle cost of coal power is between about 9.5 and 27 cents per kilowatt - hour, most of which is paid by taxpayers in the form of increased health - related costs.
The customer must be well informed (not only about the price of the primary product, but also about the prices on the aftermarket and take both prices into account by making life cycle cost calculations) and timely change his behaviour on the primary market to discipline OEMs which deliver poor quality / high prices in the aftermarket.
In the event customers make life cycle cost calculations, which leads to the conclusion that the primary and aftermarket constitute one and the same «bundle» market, one does not need to apply the same test (again) to determine the dominance on the aftermarket, since there is no seperate aftermarket at all (safe for aftermarkets where white label products are offered).
It seems to me that the Commission uses the four criteria - test — which mainly comes down to customers making life cycle cost calculations — two times:
I do understand this dominance - test as a two fold test: (i) a test of customer's behaviour (i.e. making life cycle cost calculation, cf. infra); (ii) in combination with the level of competition on the primary market.
To secure a position as a LOGISTICS ANALYST / RMS ENGR / TECH WRITER or related position with your company utilizing my fifteen years of knowledge, skill, and experience in Reliability Engineering, Root Cause Analysis, AS9102 First Article Inspection, Logistics Support Analysis (LSA), Maintenance Task Analysis (MTA), Reliability Centered Maintenance (RCM), Level of Repair Analysis (LORA), Life Cycle Costing (LCC), 3D Data M...

Not exact matches

Myersdorf said a fast - charge phone would cost $ 100 - $ 150 more than current models and would ultimately be able to handle 1,500 recharge / discharge cycles, giving it about three years of life.
Coal remains cheaper, but when you factor in the reduced capital cost (gas plants cost between a quarter and a third what coal plants of equivalent output do), the life - cycle costs point to gas, even in the absence of a price on carbon emissions.
Venture capitalist Mark Suster explains that the cost of starting a company has fallen by 90 % in the past decade, one reason investors — who also have heard of Zuckerberg and Mason — are more willing to fund more companies, with younger founders, ever earlier in their life cycle.
Services Advisory Assurance Attest Services Audit, Reviews & Compilations Employee Benefit Plan Audits Internal Audit Services International Financial Reporting Standards (IFRS) IT Audit Services SEC Services SOC 1 and 2 Services Statutory Financial Audits Tax Accounting Methods Cost Segregation Estate Tax Credits Executive Compensation Federal Corporate Tax Generational Wealth Planning International Tax Mergers & Acquisitions Real Estate Research & Development Tax Credits Sales and Use Tax State & Local Tax Tax Accounting Tax Reform Transfer Pricing Business Support DHG Search DHG Staffing Forensics Commercial Damages Digital & Computer Forensics Domestic Matters Fraud & Corporate Investigations Personal Damages Healthcare Consulting Alternative Payment Models Center For Industry Transformation Points Beyond Blog CFO Advisory Bundled Payment Models Clinical Documentation Improvement Enterprise Intelligence iluminus Reimbursement Revenue Cycle Senior Living Strategy Physician Enterprise Optimization International Services Chinese Business Services Japanese Business Services Investment Management DHG Agency DHG Wealth Advisors IT Advisory Retirement Plan Administration Risk Advisory Finance & Process Transformation Internal Audit & Compliance Regulatory Services & Risk Management Technology Services Transaction Advisory Valuation Services Financial Reporting Healthcare Valuations
Many factors could cause BlackBerry's actual results, performance or achievements to differ materially from those expressed or implied by the forward - looking statements, including, without limitation: BlackBerry's ability to enhance its current products and services, or develop new products and services in a timely manner or at competitive prices, including risks related to new product introductions; risks related to BlackBerry's ability to mitigate the impact of the anticipated decline in BlackBerry's infrastructure access fees on its consolidated revenue by developing an integrated services and software offering; intense competition, rapid change and significant strategic alliances within BlackBerry's industry; BlackBerry's reliance on carrier partners and distributors; risks associated with BlackBerry's foreign operations, including risks related to recent political and economic developments in Venezuela and the impact of foreign currency restrictions; risks relating to network disruptions and other business interruptions, including costs, potential liabilities, lost revenues and reputational damage associated with service interruptions; risks related to BlackBerry's ability to implement and to realize the anticipated benefits of its CORE program; BlackBerry's ability to maintain or increase its cash balance; security risks; BlackBerry's ability to attract and retain key personnel; risks related to intellectual property rights; BlackBerry's ability to expand and manage BlackBerry ® World ™; risks related to the collection, storage, transmission, use and disclosure of confidential and personal information; BlackBerry's ability to manage inventory and asset risk; BlackBerry's reliance on suppliers of functional components for its products and risks relating to its supply chain; BlackBerry's ability to obtain rights to use software or components supplied by third parties; BlackBerry's ability to successfully maintain and enhance its brand; risks related to government regulations, including regulations relating to encryption technology; BlackBerry's ability to continue to adapt to recent board and management changes and headcount reductions; reliance on strategic alliances with third - party network infrastructure developers, software platform vendors and service platform vendors; BlackBerry's reliance on third - party manufacturers; potential defects and vulnerabilities in BlackBerry's products; risks related to litigation, including litigation claims arising from BlackBerry's practice of providing forward - looking guidance; potential charges relating to the impairment of intangible assets recorded on BlackBerry's balance sheet; risks as a result of actions of activist shareholders; government regulation of wireless spectrum and radio frequencies; risks related to economic and geopolitical conditions; risks associated with acquisitions; foreign exchange risks; and difficulties in forecasting BlackBerry's financial results given the rapid technological changes, evolving industry standards, intense competition and short product life cycles that characterize the wireless communications industry.
These are key design points to have in mind to lower the total life - cycle cost of the air cooled heat exchanger installation.
For example, the data collected by the fleet management software can help determine the most cost - effective life cycle of a vehicle.
By considering the full life - cycle of the packaging material, the environmental and economic costs of producing it, and how reusable or recyclable it is when it has served its purpose, businesses can make an informed choice.
The OEM's who focus on the Total Cost of Ownership (TCO), Life Cycle Assessment (LCA), or Overall Equipment Effectiveness (OEE) are usually considered more innovative and sustainable.
Also, as polymers sourced from renewable feedstocks become more cost competitive and their performance is improved, preliminary life cycle assessments have shown that these will improve the sustainability of the package.
A. Is beneficial, safe & healthy for individuals and communities throughout its life cycle; B. Meets market criteria for performance and cost; C. Is sourced, manufactured, transported, and recycled using renewable energy; D. Optimizes the use of renewable or recycled source materials; E. Is manufactured using clean production technologies and best practices; F. Is made from materials healthy in all probable end - of - life scenarios; G. Is physically designed to optimize materials and energy; H. Is effectively recovered and utilized in biological and / or industrial closed loop cycles.
Reaction: Hodgson lionises England record - chaser Rooney (Euro 2016 qualifying) Report: Rooney sees off Slovenia to close on record (Euro 2016 qualifying) Reaction: Coleman foresees glory for conquering Wales (Euro 2016 qualifying) Report: Bale sinks Belgium to fire Welsh dreams (Euro 2016 qualifying) Reaction: Hodgson tells under - fire Sterling to toughen up (friendly) Report: England and Ireland draw a blank in Dublin (friendly) Reaction: De Gea uncertainty clouds Man United's horizon (Premier League) Report: Arsenal thwart Man United as De Gea departs (Premier League) Reaction: Liverpool prepare for life without «irreplaceable» Gerrard (Premier League) Reaction: Gerrard «devastated» after final Anfield game (Premier League) Report: Gerrard says farewell as Crystal Palace poop party (Premier League) Reaction: Arsenal manager Wenger irked by Swansea «accident» (Premier League) Report: Arsenal sunk by Fabiański and Gomis (Premier League) Reaction: Rodgers accuses Fàbregas as Liverpool's top - four bid fades (Premier League) Report: Chelsea close Champions League door on Liverpool (Premier League) Reaction: Mourinho steels Chelsea for challenges ahead (Premier League) Report: Hazard storms Palace to give Chelsea title (Premier League) Reaction: Mourinho feels the love despite Chelsea jibes (Premier League) Reaction: Arsenal «boring», not Chelsea — Mourinho (Premier League) Report: Arsenal stalemate delays Chelsea coronation (Premier League) Reaction: Fight for final places, Sherwood tells Villa (FA Cup) Report: Aston Villa end Gerrard's FA Cup dream (FA Cup) Reaction: Mourinho calls for caution as title beckons (Premier League) Report: Hazard fires clinical Chelsea closer to title (Premier League) Reaction: Van Gaal says Man United top dogs after derby romp (Premier League) Report: Man City blown away by Man United fightback (Premier League) Reaction: Hodgson urges Kane to build on perfect debut (Euro 2016 qualifying) Report: Rooney, Kane on target in England stroll (Euro 2016 qualifying) Reaction: Van Gaal beams after Man United storm Anfield (Premier League) Reaction: Gerrard sorry for red card against Man United (Premier League) Report: Gerrard off as Mata brace ends Liverpool run (Premier League) Reaction: PSG revel in Champions League breakthrough (Champions League) Report: Thiago Silva and 10 - man PSG claim Chelsea revenge (Champions League) Reaction: Wenger thrilled as Welbeck proves point (FA Cup) Report: Old boy Welbeck fells Man United in FA Cup (FA Cup) Reaction: Rodgers rues cost of Liverpool resurgence (FA Cup) Report: Blackburn intrude on Gerrard's FA Cup dream (FA Cup) Reaction: Wembley win leaves Mourinho feeling «like a kid» (Capital One Cup) Report: Clinical Chelsea earn Mourinho third League Cup (Capital One Cup) Reaction: Man City stirrings give Pellegrini Barça hope (Champions League) Report: Suárez scores brace as Barcelona down Man City (Champions League) Reaction: Rodgers plots Liverpool assault on top four (Premier League) Report: Coutinho rocket sinks seething Southampton (Premier League) Reaction: Van Gaal defends Man United's «long - ball» tactics (Premier League) Report: Blind late show rescues spluttering Man United (Premier League) Reaction: Pellegrini remains hopeful as Mourinho sulks (Premier League) Report: Silva keeps Man City on Chelsea's heels (Premier League) Reaction: Mourinho cries foul over Costa «stamp» claims (Capital One Cup) Report: Ivanović sinks Liverpool as Chelsea reach final (Capital One Cup) Reaction: Odds were against Man United — Van Gaal (FA Cup) Report: Minnows Cambridge hold Man United in FA Cup (FA Cup) Reaction: Rodgers buoyed by Sterling - inspired Liverpool (Capital One Cup) Report: Sterling slalom checks Chelsea in League Cup (Capital One Cup) Reaction: Arsenal masterclass sets standard, says Wenger (Premier League) Report: Cazorla stars as Arsenal stun Man City (Premier League) Reaction: Van Gaal defends methods after United defeat (Premier League) Report: Tadić strike punishes shot - shy Man United (Premier League) Report: Bloodied Skrtel earns Liverpool a point (Premier League) Reaction: In - form United «forcing luck», says Van Gaal (Premier League) Report: De Gea stars as United deepen Liverpool gloom (Premier League) Reaction: Liverpool will «fight» for return — Rodgers (Champions League) Report: Basel thwart Liverpool to reach last 16 (Champions League) Reaction: Van Persie rescued United, admits Van Gaal (Premier League) Report: Van Persie sends lacklustre Man United third (Premier League) Report: Agüero undoes Southampton as Man City go second (Premier League) Report: Stunning Agüero treble gives Man City hope (Champions League) Reaction: Hodgson dismayed by England fan chants (friendly) Report: Rooney at the double as England silence Scots (friendly) Report: Rooney, Welbeck inspire England fightback (Euro 2016 qualifying) Report: Tevez returns as Argentina overcome Croatia (friendly) Reaction: Man City have «crisis of confidence» — Pellegrini (Champions League) Report: Nine - man Man City left on brink by CSKA Moscow (Champions League) Reaction: Van Gaal says beaten Man United getting closer (Premier League) Report: Agüero gives City spoils against 10 - man United (Premier League) Reaction: Shocks are warning for England, says Hodgson (Euro 2016 qualifying) Report: Rooney on mark as England school San Marino (Euro 2016 qualifying) Reaction: Mourinho urges Chelsea to stay grounded (Premier League) Reaction: Wenger plays down Mourinho touchline spat (Premier League) Report: Hazard, Costa sink Arsenal in stormy derby (Premier League) Reaction: Pellegrini rues carelessness after Roma hold City (Champions League) Report: Totti makes history as Roma thwart Man City (Champions League) Reaction: Rodgers heartened by Liverpool resilience (Champions League) Reaction: Van Gaal wants more from match - winner Di María (Premier League) Report: Falcao debuts as Man United crush QPR (Premier League) Reaction: Hodgson hails Welbeck for biding his time (Euro 2016 qualifying) Report: Welbeck gives improved England winning start (Euro 2016 qualifying) Reaction: Angry Hodgson dismisses England statistics (friendly) Report: Rooney rescues England in turgid Norway win (friendly) Reaction: Wenger backs Sánchez to fill Giroud's shoes (Champions League) Reaction: Pellegrini gladdened by Jovetić display (Premier League) Report: Jovetić at the double as Man City sink Liverpool (Premier League) Reaction: Ancelotti predicts «new cycle» for Madrid (UEFA Super Cup) Report: Ronaldo still the boss as Madrid win Super Cup (UEFA Super Cup) Reaction: Wembley win sets tone for Arsenal — Wenger (Community Shield) Report: Vibrant Arsenal down Man City in Community Shield (Community Shield) Reaction: «Lethargic» Arsenal not ready yet — Wenger (Emirates Cup) Report: Falcao scores comeback goal to sink Arsenal (Emirates Cup) Reaction: Wenger enthused by Sanogo - Campbell double act (Emirates Cup) Report: Sanogo upstages Sánchez in Arsenal romp (Emirates Cup)
a b c d e f g h i j k l m n o p q r s t u v w x y z