The main building on the site was once the Ulysses Grant Elementary School, which the mayor's school board had closed three years ago.
Hotel Complex with 7 - story
main building on the site of former country club, located 2 miles from Old City and convention center...
Construction started after the ground - breaking ceremony in April 2014; the opening of
the main building on site is scheduled for 2018, while an artistic programme is already presented every summer in the refurbished former railway warehouses.
Not exact matches
With approximately 1,500 employees in work
sites across Canada, the company is focused
on three
main areas:
buildings, mining, and civil engineering and earthwork.
JPMorgan
on Feb. 21 announced plans to
build a new headquarters
on the
site of its current
main office
on New York City's Park Avenue.
Barrios awarded the Presbyterians a
site on Guatemala City's
main plaza to
build Central Presbyterian Church.
Built on two 12 - acre
sites expanding
on both sides of Eureka Road (
main club
on NORTH side — Registration and additional courts
on SOUTH side), featuring 32 tennis courts between the neighboring
sites.
There are no lifts
on site, however all of the
main building is accessible
on one level.
The ad links through to the
main Portman
site, which is currently set up with an emphasis
on list -
building, as the front page demonstrates:
A
site plan that would allow Tiina the Store,
on Amagansett
Main Street, to demolish a back building and part of its main building, is once again facing possible derailm
Main Street, to demolish a back
building and part of its
main building, is once again facing possible derailm
main building, is once again facing possible derailment.
With little or no fanfare, Peconic Bay Medical Center's proposed three - story expansion of its Roanoke Avenue
main building received unanimous final
site plan approval from the Riverhead Town Board
on Tuesday afternoon.
That will
build on the state's $ 50 million investment in 2015 for the first phase, which allowed for the construction of a new 313 -
site RV park, the expansion of the midway, a new
main gate and changes to Chevy Court.
A&F Property Holdings, which is registered to Atanas and Froska Crngarov of West Seneca, wanted to
build a one - story brick or concrete masonry facility
on a 0.481 - acre
site at 2516
Main.
But ITER's six international partners have disagreed for nearly a year
on whether it should be
built at the E.U.
site at Cadarache in southern France or at Rokkasho in the north of Japan's
main island.
The groundbreaking for the Integrative Genomics
Building (IGB) today celebrates the future colocation of two partnering scientific user community resources and launches construction of the first building in the long - term vision for a consolidated biosciences presence on Berkeley Lab's ma
Building (IGB) today celebrates the future colocation of two partnering scientific user community resources and launches construction of the first
building in the long - term vision for a consolidated biosciences presence on Berkeley Lab's ma
building in the long - term vision for a consolidated biosciences presence
on Berkeley Lab's
main site.
Officially deemed a «temporary»
site also, it has been slated for part of the Orleans Parish School Board's $ 7 million stabilization fund, but that money will only apply to the
main building — not the 10 old portable
buildings on the
site.
Even before your book launches in print or audio versions, starting a blog is a great idea — especially considering that it can be
built out
on the same web domain as your
main site.
Finally decided she can focus
on building up theYAshelf.com, a young adult community
site (not my
main author website) and helping out with my Facebook group for YA authors.
All the suites and rooms in the
main building reflect the long and colourful history — Winston Churchill and Queen Elizabeth are just some of the visitors who have passed through the imposing entrance hall of the house which stands
on the
site of a 17th century manor.
The Parks Conservancy will detail PX programming and the revised
site and
building plan at the Presidio Trust Public Board of Directors Meeting
on Monday, January 27, 2014 at 6:30 PM at the Herbst Pavilion
on the Presidio
Main Post, 385 Moraga Avenue, San Francisco.
There are 8
main sites of the Mayan ruins that are still standing today, namely: Tikal — a c. 700 AD city in Guatemala Caracol — another city except from c. 500 AD and situated in Belize Chichén Itzá — a monument and center for pilgrimage located in Mexico Tulum — a coastal Mayan
site present until c. 1200 AD Kabah — a ruin with elaborate and intricate carvings
on the wall which was used from c. 800 AD to c. 900 AD Palenque — another
site located in Mexico thought to be magical, present from c. 600 AD to c. 700 AD Coba — a partially excavated network of roads and pyramids in Yucatan, Mexico Uxmal — the most extravagant and complex of all eight Mayan
sites,
built shortly before c. 1000 AD.
Its
main building is the only one of the 15 cottages of the Calistoga Hot Springs Hotel, opened by Sam Brannan in 1862, that remains
on its original
site.
The
main building houses the reception, the
main bar, comfortablesitting areas with a fire place and satellite TV, the dining room, a conferencehall, two pool bars and there is a super market
on site.
The High Museum of Art, Atlanta,
site plan with the
building by Meier
on the left, the Woodruff Arts Center
main building on the right, and the Renzo Piano expansion at the bottom (in yellow); image courtesy RPBW
Housed in the Silver Center (formerly
Main Building),
on the
site of NYU's original home, the legendary University
Building (1835 — 94), the Grey Art Gallery's location has a very rich history.
Just putting keywords
on your basic
main pages or throwing 500 word basic blog posts out there without a proper
site architecture that
builds topical authority is not going to work.
The
main problem seems to be that a lot of clients are not willing to pay fees for
building services engineers who can correctly design M&E systems, prepare specifications and provide
on -
site monitoring of installations to ensure they are undertaken correctly.
Designed electronic file systems and maintained electronic and paper files.Handled all media and public relations inquiries.Maintained the front desk and reception area in a neat and organized fashion.Served as central point of contact for all outside vendors needing to gain access to the
building.Facilitated working relationships with co-tenants and
building management.Made copies, sent faxes and handled all incoming and outgoing correspondence.Created weekly and monthly reports and presentations.Organized files, developed spreadsheets, faxed reports and scanned documents.Properly routed agreements, contracts and invoices through the signature process.Managed the day - to - day calendar for the company's senior director.Received and screened a high volume of internal and external communications, including email and mail.Managed daily office operations and maintenance of equipment.Maintained detailed administrative and procedural processes to improve accuracy and efficiency.Coordinated meetings with other department managers and served as
main liaison between sales and field staff.Scheduled and confirmed appointments for entire management team.Provided support for CEO and sales team in managing operation work flow.Successfully established effective systems for record retention by creating database for daily correspondence tracking.Developed more efficient filing systems and customer database protocols.Qualified competitive subcontractor bids prior to execution of contracts.Submitted all project closeout documents in accordance with the contract.Assigned projects and tasks to employees based
on their competencies and specialties.Accurately provided status information
on project progress to the project management.Monitored the safety of all construction activities, making
on -
site personnel safety the top priority.Acted as the liaison with company safety representatives to promote awareness and understanding of safety protocols.Increased the employee base by 50 % to meet changing staffing needs.Advised managers
on organizational policy matters and recommend needed changes.Conducted new employee orientation to foster positive attitude toward organizational objectives.Directed personnel, training and labor relations activities.Served as a link between management and employees by handling questions, interpreting and administering contracts and helping resolve work - related problems.
The
main focus of the partnership was to implement the Kids Count Program, which allowed for a psychologist to work
on -
site with Alunga staff to strengthen educators» knowledge and understanding of the social and emotional needs of young children,
build their capacity and skills in effectively responding to a child's individual needs, and recognise when a child and family may need additional psychological support and a referral to the Kids Count Program psychologist.
Addtl Room 3 Level: Not Applicable, Addtl Room 4 Level: Not Applicable, Addtl Room 5 Level: Not Applicable, 2nd Bedroom Level: 2nd Level,
Built Before 1978 (Y: Yes, Electricity: Circuit Breakers, Sewer: Sewer - Public, Other Information: None, Listing Type: Exclusive Right To Sell, Master Bedroom Level: 2nd Level, Parking Type: Garage, Status: Active, Tax Exemptions: Homeowner, Appliances: Disposal, Water: Lake Michigan, Kitchen Type: Eating Area - Breakfast Bar, Kitchen Level:
Main Level, Living Room Level:
Main Level, Equipment: CO Detectors, Sale Terms: Conventional, 3rd Bedroom Level: 2nd Level, Electricity: 200 + Amp Service, Equipment: Humidifier, Addtl Room 2 Level: 2nd Level, Bath Amenities: Separate Shower, Bath Amenities: Double Sink, Family Room Level:
Main Level, Addtl Room 1 Level: 3rd Level, Appliances: Oven - Double, Roof Type: Rubber, Assessment Includes: None, Heat: Indv Controls, Addtl Room 1 Name: 5th Bdrm, Heat: 2 + Sep Heating Systems, Age: 100 + Years, Addtl Room 10 Level: Not Applicable, Addtl Room 6 Level: Not Applicable, Addtl Room 7 Level: Not Applicable, Addtl Room 8 Level: Not Applicable, Addtl Room 9 Level: Not Applicable, Frequency: Not Applicable, Appliances: Grill - Indoor, 4th Bedroom Level: 3rd Level, Style Of House: Greystone, Square Feet Source: Assessor, Master Bedroom Bath (Y: Full, Addtl Room 2 Window Treatments (Y: None, Addtl Room 1 Window Treatments (Y: Blinds, Living Room Window Treatments (Y: Blinds, 2nd Bedroom Window Treatments (Y: Shades, Master Bedroom Window Treatments (Y: Blinds, Appliances: All Stainless Steel Kitchen Appliances, 3rd Bedroom Window Treatments (Y: Blinds, Kitchen Window Treatments (Y: Shades, Family Room Window Treatments (Y: Blinds, Area Amenities: Gutters, Area Amenities: Street Lights, Area Amenities: Street Paved, Area Amenities: Sidewalks, 4th Bedroom Window Treatments (Y: Drapes, Garage
On -
Site: Yes, Recent Rehab (Y: Yes, Additional Sales Information: List Agent Must Accompany, Laundry Window Treatments: None, Additional Rooms: Utility Room - 2nd Floor, 2nd Floor Laundry, Laundry Flooring: Other, Additional Rooms: 5th Bedroom, Is Parking Included in Price: Yes, Addtl Room 2 Name: Utility Room - 2nd Floor, Type of House: 3 Stories, Garage Type: Detached2, Garage Ownership: Owned, Basement (Y: Full, Bath Amenities: Whirlpool, Garage Type: Detached, Laundry Level: Basement, Equipment: Security System, Basement (Y: Walkout, Driveway: Off Alley, Additional Sales Information: Home Warranty, Appliances: Range Hood, Appliances:
Built - in, Appliances: Cooktop, Lot Dimensions: 3645
Krehmeyer bought four corner
sites on the
main commercial corridor, but «we found out that a grocery store wouldn't pay enough rent to cover what it would cost us to acquire, demo, and
build the property.
Located
on the border of Passaic Park and 15 minutes from New York City, the fully occupied apartment
building has an
on -
site superintendent and is easily accessible from
main highways including Routes 3, 21, 46 and the Garden State Parkway.
Building «Google Trusted» high quality «back links» pointing to the
main traffic pages
on your
site.
«The
site of this house was not a standard one so we were able to create an entirely bespoke
building and interior, with two bedrooms
on the ground floor, and the
main bedroom in the loft.