Sentences with phrase «manage during the construction»

It will be able to offer a larger, single contract to the head contractor, which will create greater economies of scale during construction and make both sites easier to project manage during the construction phase.

Not exact matches

Michael has managed over 1,000 staff and contractors with a budget in excess of US$ 150m, with responsibility as site registered manager during construction, commissioning, ramp up through to steady state operation.
Professional Profile: During more than 15 years he led one of the most important «custom homes» construction firms in Argentina, where he managed the whole development process from land acquisition to construction and sale.
At Mundo Verde he has managed construction for a $ 13.25 million project and has led school operations during student growth from 260 to 500.
Thanks to HuracanTalk we managed to find several behind the scenes photos that have been taking during the actual construction of the new Huracán Novara by Vorsteiner... and it looks like their original show car was rebuilt... they started with the matte grey wrapped car that was red underneath.
During that time, he also oversaw the mass construction of separately managed accounts (SMAs).
During the construction contract signing, the Serena Hotels» Managing Director, Mahmud Janmohamed said, «There is a very clear need for high quality accommodation options for both local and international travelers to this part of the country.
During the 50 levels of the scenario - based game, you will manage the construction crew that you employ and train yourself and the fleet of transportation trolleys and vehicles.
Managed on - site Construction Safety Personnel during Middletown, Ohio Coke Installation Project and Hazardous Waste Remediation Program
Reviewed and approved contract documents, oversaw contractor selection and bid process, awarded contracts, supervised construction, bid and awarded contracts for fixture installation, coordinated all trades, developed and implemented schedules, managed budgets, and coordinated with retail operations during all phases of projects.
• Drive cement mixers to and from construction sites • Operate the truck to ensure appropriate mixing and pouring of cement • Ensure maintenance of concrete truck to ensure that no breakdowns occur during shift time • Manage mileage logs and ensure that the truck is clean from the inside and outside post shift • Perform limited routine maintenance work on the concrete truck
Responsible for establishing a safe, well maintained working environment & managing traffic control during all phases of construction.
Effectively managed projects before, during, and after construction through Implementation of BIM technologies.
nt Phils Construction company - Riverside, CA Managed work crews on the construction of residential... Performed construction site pre - inspections and coordinated post - construction audits... issues during project cConstruction company - Riverside, CA Managed work crews on the construction of residential... Performed construction site pre - inspections and coordinated post - construction audits... issues during project cconstruction of residential... Performed construction site pre - inspections and coordinated post - construction audits... issues during project cconstruction site pre - inspections and coordinated post - construction audits... issues during project cconstruction audits... issues during project constructionconstruction.
Responsible for managing crews of 6 - 12 technicians during new construction and renovation of residential homes.
Responsible for managing crews of 6 - 12 electricians during new construction and renovation of residential homes.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constrmanage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constrManage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constructionconstruction
Professional Duties & Responsibilities Directed operations of Target Stores generating $ 20 million in annual revenue Created and implemented strategies to cut expenses while increasing sales Assisted corporate leadership with store marketing and branding efforts Hired, trained, managed, and reviewed more than 130 team members Enhanced employee value through professional development programs Increased employee dedication through recognition and team building initiatives Managed logistics team operations including product unloading and stocking Oversaw planogram, pricing, instocks, backroom, and replenishment teams Created an attractive and impactful salesfloor ensuring steady sales Coordinated all salesfloor transitions, salesplanner, signage, and pricing sets Ensured the highest levels of customer service resulting in repeat business Served as liaison between Target leadership and construction contractors Guaranteed store safety, security, and branding during remodel Built strong, long - term relationships with business partners, coworkers, and employers Completed all duties in a positive, professional, and timely manner Fostered an environment of respect and dedication to companmanaged, and reviewed more than 130 team members Enhanced employee value through professional development programs Increased employee dedication through recognition and team building initiatives Managed logistics team operations including product unloading and stocking Oversaw planogram, pricing, instocks, backroom, and replenishment teams Created an attractive and impactful salesfloor ensuring steady sales Coordinated all salesfloor transitions, salesplanner, signage, and pricing sets Ensured the highest levels of customer service resulting in repeat business Served as liaison between Target leadership and construction contractors Guaranteed store safety, security, and branding during remodel Built strong, long - term relationships with business partners, coworkers, and employers Completed all duties in a positive, professional, and timely manner Fostered an environment of respect and dedication to companManaged logistics team operations including product unloading and stocking Oversaw planogram, pricing, instocks, backroom, and replenishment teams Created an attractive and impactful salesfloor ensuring steady sales Coordinated all salesfloor transitions, salesplanner, signage, and pricing sets Ensured the highest levels of customer service resulting in repeat business Served as liaison between Target leadership and construction contractors Guaranteed store safety, security, and branding during remodel Built strong, long - term relationships with business partners, coworkers, and employers Completed all duties in a positive, professional, and timely manner Fostered an environment of respect and dedication to company goals
During the time I managed crews of construction workers coming in and out of the building and relaying any discrepancies to my superiors.
Led and managed resolution of all issues during project construction and commissioning phases.
City of Rawlins (Rawlins, WY) 1/2002 — 3/2006 Building Inspector • Conduct construction inspections to ensure legal compliance during and after the construction process • Supervise the building of various commercial and residential structures • Manage approximately 125 sub-contractors engaged in varied commercial and residential construction • Assist with hiring and training new employees ensuing they understand applicable laws and ordinances
«The quarter's inventory growth of more than 3,600 units represents the highest number of seniors housing units coming online during any quarter of the past six years — dating back to mid-2009, which was near the end of the sector's last construction cycle,» says Chuck Harry, NIC's managing director and director of research and analytics.
During his 22 year tenure with the Firm, he served as a Managing Partner and oversaw its growth from a small construction boutique to a full service law firm with concentration in construction and real estate.
a b c d e f g h i j k l m n o p q r s t u v w x y z