Not exact matches
Michael explains how he tackled the
massive cuts in spending, saying, «First, I carried out an audit of all computer
equipment across each school, so that I could develop a
replacement strategy that was in line with the 40 % reduction target.
In choosing the most rugged
equipment available they selected a
massive steel unit called an ARB Deluxe Bull Bar as a
replacement for the front bumper.
• Reduced HVAC repair and maintenance cost by 30 % per annum through implementation of vigilant and proactive preventive maintenance SOPs • Hand soldered a damaged electrical
equipment component, saving the company a cost of up till $ 12K in terms of machine
replacement • Implemented energy saving and cost effective power usage strategies which led to a reduction in the company's annual operational costs by 15 % • Timely identified and rectified a fault in blue print implementation, saving the client from a
massive loss of cabling and installation expenses caused by shot circuiting