Sentences with phrase «metal wall constructions»

When his show at the Kasmin Gallery opens on Thursday, he will be exhibiting a group of metal wall constructions, the «Bamboo Series,» as he calls them.

Not exact matches

Saeed Ghasseminejad, an economist, and the political scientist Emanuele Ottolenghi, writing in The Wall Street Journal, estimated that the Revolutionary Guards Corps controls about 20 percent of the market value of companies traded on Tehran's stock exchange, across the telecommunications, banking, construction, metals and mining, automotive and petrochemical sectors.
The Corner Plexiglass Wall Art from Metal Art Studio captures the skill, craftsmanship, and care involved in the construction of this long - forgotten cabin.
Basic metal is used in the construction of walls and machine gun towers, while other materials are needed for creating rocket towers and other things.
Throughout the complex, industrial residues peek out from new construction and design: old floor tile, red and yellow hazard paint, metal knobs and levers protruding from scabby walls.
In the 1950s he began producing large numbers of stabiles — large - scale constructions made from cut and painted metal sheets — and simultaneously explored new forms such as Towers (wall - based wire constructions with moving elements) and Gongs (sound - producing metal pieces).
Hagen emphasises this difference in level by making a self - supporting construction in metal space frames — structures formed by interlocking struts — that forms an L - shape, jutting out from the first - floor space and meeting the wall of the lower main space at an angle.
They bear a certain similarity to the wall - sculptures: constructions of wood or metal, wrapped in foam - filler and coated with plaster or a granular layer of chalk - grey sand - cement, sometimes with applications of greasepaint.
Soto created mixed - media constructions as wall pieces or as free - standing sculptures that emphasize the textures of cloth, metal, and wood.
On Rosenquist's property in Aripeka, Florida, construction is completed on his second naturally lit studio, which incorporates steel girders and corrugated - metal walls approaching industrial scale.
The open space is crisscrossed at each floor by white metal beams; on these existing structures sit drywall constructions that simulate the corner of a room, with floor and two adjoining walls.
The result is a series of small geometric metal - and - plywood, polychrome wall constructions of enormous visual appeal and seductive anecdote.
«Some Assembly Required,» an Exhibition of Ted Larsen's Latest Salvaged and Repurposed Metal Constructions at David Richard Gallery, Santa Fe David Richard Gallery will present an exhibition of the most recent constructions by Ted Larsen comprised of salvaged and repurposed metal that features sixteen new wall - hung, floor and pedestal piMetal Constructions at David Richard Gallery, Santa Fe David Richard Gallery will present an exhibition of the most recent constructions by Ted Larsen comprised of salvaged and repurposed metal that features sixteen new wall - hung, floor and pedestal pimetal that features sixteen new wall - hung, floor and pedestal pieces.
The metal structure means that there is a piece of thermally conductive metal going through the wall, which reduces the insulation benefit of straw bale wall construction.
1 Oscar Baldry getting down to work in the old newsagent's shop; 2 laying Kingspan and Ecotherm insulation in the ground floor of the old shop; 3 first floor metal web joist detailing, with membrane behind the joists for airtightness; 4 ground floor walls feature 50 mm Xtratherm internal insulation; 5 this is followed inside by an Intello vapour control barrier and a further 25 mm Xtratherm; 6 the new timber frame first - floor twin - stud walls and roof rafters are of a fully breathable construction and full - filled with Warmcel cellulose insulation; 7 holes in the timber - frame where the Warmcel insulation was pumped in; 8 a pro clima Intello membrane on the inside of the first - floor walls and roof; 9 and finally, 50 mm Thermafleece (sheep wool) lined service cavity to the interior.
ENERGY EFFICIENCY FEATURES Super-insulated construction (R - 40 walls and R - 60 roof) Photovoltaic solar panels Solar hot water (evacuated panels) High - efficiency hydronic heating (Heat Pump) Energy - efficient triple glazed windows Airtight Construction WATER CONSERVATION FEATURES Low - flow showerheads and faucets Sustainably Produced and Durable Materials FSC certified wood products Recycled - content resilient flooring 50 - year siding 40 - year, recyclable metal roof Locally manufactured materials HEALTH INDOOR ENVIRONMENTAL FEATURES Low VOC paints, adhesives and sealants Nontoxic finishes on flooring and cabinetry Formaldehyde - free insulation Formaldehyde - free cabinets Efficient ventilation PASSIVE DESIGN ELEMENTS Overhanging eaves and awnings sized to reject high - angle summer sun and receive low - angleconstruction (R - 40 walls and R - 60 roof) Photovoltaic solar panels Solar hot water (evacuated panels) High - efficiency hydronic heating (Heat Pump) Energy - efficient triple glazed windows Airtight Construction WATER CONSERVATION FEATURES Low - flow showerheads and faucets Sustainably Produced and Durable Materials FSC certified wood products Recycled - content resilient flooring 50 - year siding 40 - year, recyclable metal roof Locally manufactured materials HEALTH INDOOR ENVIRONMENTAL FEATURES Low VOC paints, adhesives and sealants Nontoxic finishes on flooring and cabinetry Formaldehyde - free insulation Formaldehyde - free cabinets Efficient ventilation PASSIVE DESIGN ELEMENTS Overhanging eaves and awnings sized to reject high - angle summer sun and receive low - angleConstruction WATER CONSERVATION FEATURES Low - flow showerheads and faucets Sustainably Produced and Durable Materials FSC certified wood products Recycled - content resilient flooring 50 - year siding 40 - year, recyclable metal roof Locally manufactured materials HEALTH INDOOR ENVIRONMENTAL FEATURES Low VOC paints, adhesives and sealants Nontoxic finishes on flooring and cabinetry Formaldehyde - free insulation Formaldehyde - free cabinets Efficient ventilation PASSIVE DESIGN ELEMENTS Overhanging eaves and awnings sized to reject high - angle summer sun and receive low - angle winter sun.
Accurately calculating number of metal studs and tracks required for framing walls or ceilings prior to construction
• Particularly effective in roofing, repairing, re-roofing and insulating pre-installed roofs for commercial projects in a timely, organized and team oriented manner • Specialized expertise in EPDM, TPO, PVC and shingling • Skilled in carrying out maintenance and repair of mechanical, electrical and other physical structures • Well - versed in painting of structures, performing carpentry work, repairing plumbing fixtures and woodwork • Excellent physical stamina, ability to climb a ladder, bend, stoop and work in confined spaces • Special talent for metal roofing construction including flashing, wall panels, fascia and soffit • Apt at using various tools needed for cutting hammering and fastening roofing materials • Track record of completing projects in strict accordance with job specifications, project layout and applicable safety guidelines • Profound skills in installation of low sloped roof systems including TPO, BUR and bitumen • Proficient in carrying - out general roof repairs, exterior siding adjustments and HVAC installation repairs • Particularly effective in removal and installation of all types of commercial roof systems including slate, tile and asphalt • Well practiced in covering roofs with topping material including sheets, PVC and spray foam • Adept at utilizing manual and electric tools and maintaining the same in a functional order • Efficient in laying and adhering insulation with metal fasteners or binding adhesives • Expert in cutting stripes of flashing and fitting into angles formed by walls, vents and intersecting roof surfaces • Firsthand experience in carrying out regular preventive maintenance of pre-installed roofing systems • Substantial knowledge of various roofing systems and associated installation protocols • Familiar with OSHA workplace safety guidelines • Excellent listening skills with profound ability to follow verbal and written instructions to book • Great attention to detail with proven skills in interpreting and implementing given drawings and blueprints with accuracy • Strong numeracy skills, apt at generating accurate cost estimations for given projects
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constructionconstruction
Faced with a tight construction schedule mandated by the occupancy dates for the major leases, Philip Miller, vice president of Alfred Miller Contracting (a Butler Builder [R]-RRB- came up with the solution of applying Butler's joist and standing - seam metal roof system with the load - bearing walls comprised of WaffleCrete lightweight, precast concrete panel system.
«They are made of a metal wall covering that has been laminated onto the base construction material and then lacquered, making a washable and very durable finish.»
a b c d e f g h i j k l m n o p q r s t u v w x y z