Those who would construct, at significant environmental cost,
more hydro plant, must factor in the cost to the commons of environmental degradation of our rivers.
Not exact matches
Here's what that could entail: calling off talks to buy
more B.C.
hydro supply to offset the shuttering of Alberta's coal
plants.
Learn
more about GE's wind &
hydro technology that is used on this power
plant and similar projects.
Our
plant capabilities draw from
more than a century's experience in all aspects of
hydro power production - from initial studies to design, management, construction, installation, maintenance, operation, and training.
The supply is unreliable, although
more consistent than wind generation which is notoriously unreliable and thermal, nuclear, or
hydro power (if available) is required to carry sufficient reserve in the grid system to compensate for any changes in solar
plant output due to any changes in sunlight during the day.
«A new study called Solar Vision 2025, issued by the Canadian Solar Industry Association and prepared by consultants Ernst & Young, reports the cost of solar power projects will be cut by
more than 50 % before 2025, making the solar electricity competitive with electricity generated by oil, gas,
hydro or nuclear
plants,» said Dr. Shawn Qu, CEO and President of Canadian Solar.
The
hydro plant costs about 3 times
more than normal.
Electricity generated by wind and solar is
more expensive than electricity generated using traditional methods, e.g., coal - fired, natural gas combined cycle, nuclear and
hydro power
plants.
And my real point in # 116 is how CAFE relates to carbon trading and why American taxpayers (or European or Australian taxpayers for that matter) should accept a system of cap and trade that provides subsidies for untold thousands of dubious projects such as building developing world
hydro - electric
plants that would have been built anyways, or that enriches untold thousands of individuals in cap and trade firms when a simple direct tax would accomplish the same goal
more efficiently.
I would even favor replacing end of life coal power
plants with nuclear, even though nuclear is
more expensive than
hydro - carbon energy (today).
The natural cooling / heating system, along with the power from a dozen nearby
hydro - electric
plants, mean the facility is 10 percent
more efficient than traditional data centers and consumes 40 percent less power.
At present,
more than 670 run - of - river power
plants and some 1,800 small - scale
hydro power stations are in operation, which generate approx. 60 % of Austria's electricity needs.