1 The Rochestown House flats prior to the refurbishment; 2 aerated concrete blocks were chosen to form new build elements, including a new third storey that allows for
more generous apartment sizes; 3 new triple - glazed windows were installed outside the masonry layer so that the external insulation could wrap around them, and help prevent thermal bridging; 4 the airtightness layer was moved to the outside of the structure by taping the joints of the existing concrete panels, then extending that tape up onto the aerated blocks in the new floor; 5 Aerobord platinum EPS external insulation being fitted to the original concrete panel walls; 6 & 7 the new window
frames visible here in the external insulation layer, including Rockwool fire breaks; 8 openings for exhaust and supply intakes for the new Zehnder heat
recovery ventilation system, seen here prior to being insulated and airtightened; 9 installation of the Bauder bitumen roofing membrane.
Suing the US government is a far
more complicated process than suing a US citizen, and requires you to complete a number of steps within specific time
frames to exercise your legal right to
recovery.
«For new deals and investors without legacy assets, the new housing environment should be
framed in terms of
more typical, moderate rates of growth with tempered optimism for the ongoing housing
recovery,» Villacorta said.