Missions in the vicinity of the moon will span
multiple phases as part of NASA's framework to build a flexible, reusable and sustainable infrastructure that will last multiple decades and support missions of increasing complexity,» NASA said in a statement.
Not exact matches
In general, so - called value stocks — often defined
as those trading at earnings
multiples below the market average or their own historical norms — have tricked a lot of investors in the most recent
phase of the current bull market, which has worn on nearly seven and a half years.
«His expertise in successfully building commercial - ready operations at
multiple biopharmaceutical companies will be instrumental
as Nohla enters its next
phase of growth.»
«His broad experience across
multiple elements of GE Capital,
as well
as his extensive knowledge of middle - market alternative finance, makes him an ideal addition to our team
as Old Hill embarks on our next
phase of growth.»
One, he might claim that all actual entities are in
phase and the largest temporal extensions are
multiples of the smallest extension, e.g., 1/320, 1/160, 3/320, 1/80, 1/64 Here it would suffice to have the temporal extension of the divine experience
as that of the shortest temporal extension.
Rearfoot and Forefoot Gel ® technology cushioning systems: Attenuates shock during impact and toe - off
phases, and allows movement in
multiple planes
as the foot transitions through the gait cycle
The study is investigator led and has therefore focused on clinical need, targeting patients with progressive
multiple sclerosis in whom most disability is incurred... The study also reports a predominant effect on neurodegenerative rather than inflammatory outcomes, suggesting a novel mechanism of action that might be suitable
as combination treatment with immunomodulatory treatments... Further
phase 3 studies to measure the effect of simvastatin on sustained disability, particularly in patients with non-relapsing secondary progressive and primary progressive
multiple sclerosis, are clearly needed, but this trial represents a promising point from which to develop trials of progressive disease.»
Interestingly,
as the amount of nutrients gradually increased, the relationship between the strains, originally mutualistic, transitioned through
multiple phases before devolving into competition, and even extinction of one partner.
«This study presents a novel strategy for treating
multiple myeloma, and we hope to bring it to patients
as part of a
phase I clinical trial
as soon
as possible,» Hofmeister says.
AWARE uses
multiple radar instruments and a sophisticated lidar system to explore the clouds» many layers, examining properties such
as phase and particle size at various altitudes.
Once we evaluate ISIS - SMNRx
as a single - dose in children with SMA, we will move to
multiple - doses in our
Phase 1 studies and eventually evaluate the drug in
Phase 2 studies in children with SMA, including infants with Type I SMA.»
-LSB-...] There are many ongoing clinical trials (
Phases I, II, and III) using adipose derived MSC's to treat conditions
as varied
as COPD, pulmonary fibrosis, congestive heart failure, osteoarthritis, Parkinson's disease, diabetes, Autism, Crohn's disease,
multiple sclerosis, macular degeneration, urinary incontinence, neurological disorders and many other conditions.
A
Phase I study in AD patients demonstrated good safety and tolerability of
multiple injections of aggregated Abeta42 (AN1792) with QS - 21
as adjuvant.
Convergent
phase training allows you to pursue
multiple fitness goals at the same time although for this particular workout, we'll leave power training out
as it's a bit too specialised to be included in such a generic programme.
I'd like to start cycle syncing and I've seen you recommend using the moon
phases multiple times for amenorrhea sufferers; however, since I had a period 7 months ago, would I be better served by using that
as the baseline and estimating the number of days spent in each of the four
phases between then and now?
The other two
phases,
as said, are the use of these clues and materials found on the scene to access better and more complex solutions in the dialogue, and then the dialogue itself where you are required to save the target no matter what, with
multiple endings which determine whether you'll sacrifice yourself, for example, or throw the both of you from the building.
We,
as an eLearning vendor, are expected to develop an English eLearning program in initial
phase and then translate them into
multiple languages.
It was through working with Xydias on the belly - tank restoration the next
phase of Chapouris» life would begin with the re-creation of the SO - CAL Speed Shop (located in Pomona, California), which included partnerships with GM on their Bonneville salt flat racers
as well
as multiple SO - CAL Shops franchises located across the United States.
In this time of growing, distributed teams,
multiple versions, vendors, and formats, and digital sales, it has never been more important for publishers to actively manage their manuscripts
as they move from author to production to post-production
phases.
All throughout this legal battle, Apple has fought Judge Denise Cote on nearly every ruling, and have filed
multiple motions and appeals; at one point, Apple was back in court for directly refusing to work with the court - appointed monitor that Cote ordered
as a result of ruling against Apple in the initial
phase.
The roll - out will happen in
multiple phases,
as you'd imagine, so don't fret too much when you go to check for the upgrade in the notifications menu.
WHILE WE WORK operates
as a storyteller and
as a score that oscillates between the liveness and the memory of Agora's work in relation to their building — a space in constant mutation, where working
phases and changes of plans are part of its daily construction,
as well
as the
multiple informations, stories and rumours that have been circulating.
It's interesting that you keep pushing geoengineering while at the same time disparaging, rejecting, ignoring and otherwise expressing extreme negativity towards the
multiple, readily implementable plans that have been put forward by
multiple independent organizations and academic researchers,
as well
as government agencies, for rapidly
phasing out CO2 emissions from fossil fuels using benign technologies that we have at hand now.
What I am saying is that it makes no sense at all to hand - wave at the effects of uncontrolled volcanic eruptions
as «absolute proof» that geoengineering schemes «can work», while promoting a gradual 50 - year phaseout of GHG emissions (which is too slow to have any hope of preventing catastrophic outcomes)
as «logical» (whatever that means) and ignoring the
multiple studies that show we can easily
phase out emissions in a fraction of that time with the proven technologies that are already at hand.
This cooperation includes technical and policy exchanges on the development of fuel efficiency standards for trucks and buses, continued progress towards implementation of CCUS projects with the selection of a project site in China
as the large - scale CCUS demonstration project announced last November, cooperation on reducing HFCs, including private sector commitments to promote climate - friendly alternatives to HFCs, and continued support for
phasing down HFCs through the Montreal Protocol, and additional cooperation on direct mitigation efforts across
multiple other sectors.
Indeed, the two cycles may differ in
multiple patterns such
as amplitude and
phase.
The arrival of a single MC, in general, is connected to a decreasing of SPE and consequently of the ionospheric absorption
as it is observed in this case when Bz flows Southward, while the large decay, observed in this case, in the recovery
phase of Dst index is connected, in general, to the presence of
multiple Interplanetary medium structures,
as two MCs, near Earth (Xie et al. 2006).
During
Phase II, testimony will be heard from live witnesses representing stakeholders with interest in
multiple sectors of activity, such
as Indigenous communities and interest groups.
As has been discussed
multiple times on SLAW and based on two emails over the past few days, it appears the first
phase of adding of older Supreme Court of Canada decisions to the court's website has been completed.
While a full enterprise implementation may take
multiple months, the customer often sees savings and value in
as little
as 2 months with a
phased approach.
It allowed me to not only become part of an innovative and dynamic group of people who come from
multiple disciplines & backgrounds, but also the opportunity to be actively involved in both (i) the initial planning to the post-construction and operation
phase of energy projects across
multiple continents and (ii) the strategic formulation,
as we move through this current energy transition
phase the global energy sector is experiencing, providing me with an amazing intellectual reward and sense of contribution.
Chidambaram said the insurance sector needs to quickly move to the digitization from the voluntary to the mandatory
phase as this initiative entails
multiple benefits both at the customer end and the insurer end.
As revealed by the company, the device has been up for pre-order in
multiple countries where it will be available in first
phase.
Work quickly and accurately on
multiple projects in various design
phases,
as assigned, meeting tight deadlines.
As a Scientist II I have been requested to assist within many projects within
multiple platforms from Assay Architecture (
Phase 0 to
Phase 1 assay assessment), Point of Care assay and system development teams, Assay and System development for Donor Screening, Immunodiagnostic Assays and Dry Slide Technology platforms, and Site Management for Internal and External Validation Trials for the VITROS 5600/3600 Platforms.
Areas of Expertise IT Management Network Engineering Citrix Engineer \ Administration Active Directory / File Security Manager VMWare Engineer \ Administration Network Design / Architecture Local Area Networks (LAN) Wide Area Networks (WAN Help Desk Management Data Center Management / Design * Altiris Administration System Automation Server Configuration Security Systems Management * Hardware Installation Software Configuration Remote Software Deployment Patch Management * Change Management Project Management Business Process Analysis Business Communications Sales / Marketing Management Risk Management / Disaster Recovery Analyst Statistical Analysis Database Management Policy Development Contract Negotiation * Grant Writing Total Quality Management (TQM) Training & Development TCP / IP Configuration Change Management Monitoring Ability to increase organizational effectiveness and staff skill level through training and awareness of best practices Unique blend of technical experience administrative skills and team - building capabilities Mastery of all
phases of project development life cycle including requirements analysis specifications development application design implementation data conversion design review and system testing * Proven ability to communicate effectively with all involved parties to ensure the development of viable business solutions to technical issues Ability to manage complex systems spanning
multiple platforms and
multiple functionalities * Demonstrated leadership and team - building capabilities in the professional environment
as well
as through active community involvement * Ability to cultivate trust and respect through open communication and shared goals among various business units
Some of my responsibilities include: employee training, cycle counting, inventory control, shipping and receiving parts for
multiple military vehicle platforms, assisting the Quality and Engineering departments in insuring the integrity and conformity of all products before their use, working hand in hand with Inventory Support Specialists in all
phases of warehouse operations,
as well
as stocking, pulling parts, and kitting for for all vehicle programs.
The Chasm Group, LLC and Chasm Institute, LLC (San Bruno, CA) 1997 — 2008 Business Operations Manager • Managed all daily operational tasks for leading multi-million dollar high - tech market strategy consultancy, while providing executive administration to C - level executives and venture capital partners • Developed and managed the firm's annual budget, proposing and implementing expense cuts, producing monthly reports and financial statements, and coordinating with CPA firm for accurate and timely filings • Oversaw all client relationship management efforts while cultivating new business efforts from concept to implementation, providing high - quality service in sales efforts while utilizing new lead tracking system • Negotiated and managed all contracts, stock grants, and financing arrangements, working closely with outside counsel to draft legal documents and resolve LLC - and proprietary - related issues • Led three office space build - outs and two office relocations, managing all aspects of each process under aggressive timeline and budget expectations • Reduced firm telecom expenses by 22 % by streamlining IT objectives, including migration to VOIP phone system, software / hardware purchases, domain renewals, and outsourced technical support • Directed all
phases of staff recruitment while creating and implementing all HR policies and programs, including comprehensive employee benefits plans • Supervised
multiple administrative staff members, conducted performance appraisals and wage / salary surveys in comparison to incentive program guidelines, and maintained HR files in accordance with legal mandates • Produced all out - going client invoices in an accurate and timely fashion to increase, cash flow and reduce aging receivables, providing consistent attention to overhead costs and vendor arrangements • Administered all company insurance policies, including E&O, general liability, bonds, partner life and disability, conducting annual benefits reviews and employee / company insurance audits • Obtained necessary certificates for consulting contracts while processing federal, state, and local business reporting requirements to maintain licenses and incorporation status • Directed all marketing efforts and oversaw logistical aspects of national educational workshop series, utilizing sponsorship arrangements to offset production costs • Transformed «brochure» website into a dynamic tool to better illustrate company opportunities through relevant case studies,
as well as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as well
as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as maintaining all other promotional media, including press kits and video Association of California School Administrators (Burlingame, CA) 1993 — 1997 Issues and Planning Committee Coordinator • Executed all
phases of event planning and implementation for a membership - driven organization including 23 state committees, 5 task forces, 6 strategic planning conferences, and a conference of 1,500 attendees • Focused on facility evaluations, bid requests, site visits, contract negotiations, and all pre - and post-conference planning processes • Produced statistical and financial reports, including budget projections and cost monitoring for developmental training efforts • Oversaw all participant - level responsibilities, including inquiries, eligibility, registration, correspondence, and billing statements • Managed all legal professional standards calls for Northern California regions, including the processing of attorney authorizations, the preparation of legal assistance letters, and liens on cause of action • Served
as second point of contact for computer inquiries and troubleshooting efforts as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as second point of contact for computer inquiries and troubleshooting efforts
as well as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as well
as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly AS / 400 backup and report generati
as provided back - up executive administrative support for Executive Director, Committee Chairs, and the State Superintendent of Public Instruction • Held responsibility for software installation and hardware configuration while performing weekly
AS / 400 backup and report generati
AS / 400 backup and report generation
Further, this right to vote extends to all
phases of Board operation wherein REALTOR ® Members are granted the right to vote including, but not limited to, voting
as participants in a
Multiple Listing Service.
Under § 1026.17 (c)(6)(ii), when a
multiple - advance construction loan may be permanently financed by the same creditor, the construction
phase and the permanent
phase may be treated
as either one transaction or more than one transaction.
iii, which provides that such an example is not required in a
multiple - advance construction loan disclosed pursuant to appendix D, part I. Appendix D, part I provides guidance for disclosing the construction
phase of a construction - to - permanent loan
as a separate transaction pursuant to § 1026.17 (c)(6)(ii)(or for disclosing a construction - only loan).