LM Wind's rotor's attached to GE's Haliade
nacelles at America's first offshore wind farm on Block Island, Block Island.
Not exact matches
He estimated Vestas will need
at least two new factories to produce the V164 — one for blades and one for
nacelles.
The rear part of a
nacelle casing on an Adwen M5000 turbine broke off and fell in the sea
at the 60MW Alpha Ventus wind farm (pictured) in the German North Sea.
Installation of the Block Island Wind Farm's turbine towers, blades and
nacelles is scheduled to begin in early August
at the project site, roughly three miles off the coast of Block Island, Rhode Island.
At the same time, they are developing a
nacelle - Lidar power curve verification method based on the Wind Iris 4 - beam device.
The failure of retaining bolts led to a
nacelle casing falling off an Adwen M5000 turbine
at the 60MW Alpha Ventus offshore wind farm in the German North Sea, according to the project's co-operator EWE.
That's measured
at the
nacelle 70m above ground.