The plan would have provided stable financing to expand much
needed natural gas pipeline capacity to the region, and would have driven down the cost of wholesale electricity.
Not exact matches
Asian investors in particular are growing weary of Canada's sluggish pace of building energy infrastructure — the
pipelines and liquefied
natural gas facilities
needed to get Canadian fossil fuels to offshore markets.
BP's project
pipeline is looking thin, it says, while Total
needs to speed up its plans to acquire low - cost, long - life assets and shift towards
natural gas production by 2035.
Paris hosted a delegation of Russian energy officials to review French
natural gas needs and prospects for
pipeline development, Gazprom said.
The province's energy board could refuse TransCanada's request for the huge rate increase that it
needs to help bankroll its replacement
natural gas pipeline.
The U.S. Supreme Court dealt another setback to a proposed
natural gas pipeline running from Pennsylvania to New York, rejecting Constitution
Pipeline Co's bid to challenge New York state's refusal to issue a
needed water permit for the project.
The country is crossed by a network of Soviet - era
pipelines that carry Russian
natural gas to many European Union member states and beyond; more than a quarter of the EU's total
gas needs were met by Russian
gas, and some 80 % of it came via Ukrainian
pipelines.
«CPV has met and exceeded every state and federal standard to operate this plant and build the
pipeline needed to supply it with
natural gas, winning hard - fought battles against the Cuomo administration in court as a result,» said Tom Rumsey, the company's vice president for external affairs.
The major remaining permits
needed for the
natural gas - powered plant, which was part of an alleged bribery scheme involving a former top aide to Gov. Andrew Cuomo, are for
pipelines to deliver the fuel.
We also foresee tremendous potential for other high value applications, such as
pipeline insulation and transportation of liquefied
natural gas which
needs to be stored at a low temperature,» said Prof Nhan.
Walker said he would emphasize that
pipeline with Obama, as well as the state's
need to extract
natural gas resources and address financial challenges caused by low oil prices.
The association, representing the nation's investor - owned utilities, said states would
need more than the few years before 2020 to build the necessary
natural gas pipelines and to resolve issues with
gas - electric coordination, including differences in regulatory schemes, operational requirements and processes for building infrastructure.
The public forum will address several recent
pipeline incidents that revealed firefighters and other emergency responders in some communities may not have the information they
need to adequately prepare to respond to significant
natural gas and hazardous liquid
pipeline emergencies.
This includes developing
needed infrastructure such as new
natural gas pipelines, additional storage capacity and more.
They reason that any new coal mine or oil field or
natural gas pipeline would
need to be shut down early to avoid emissions that would go beyond the agreed level of warming.
It's something that I think New England really
needs to figure out: How do they solve that problem when they can't get any energy infrastructure, let alone
natural gas pipelines, built?»
The
natural gas in this
pipeline, priced 30 percent below the world market price, meets 20 percent of the factory's
needs.
«We
need to make sure that our customers get electricity even in the event of a long - term disruption of the
natural gas pipeline system.»
Even moving hydrogen by
pipeline has its problems, much larger diameter pipes would be
needed than to transport a comparable amount (in terms of energy value) of
natural gas.
This report examines the
need for, and the cost of, the Access Northeast (ANE)
natural gas pipeline.
The decline in
natural gas use for electric generation indicates that even existing
gas pipelines may operate under capacity and that ANE — or other new
pipeline infrastructure — will not be
needed to supply either electric generators or
gas heating customers.
Pipeline proponents claim that the ANE
pipeline is
needed to relieve capacity constraints on New England's
natural gas pipeline system and that the cost of the
pipeline is justified because it will ultimately save money for New England electric ratepayers.
Furthermore, within several years of the
pipeline's construction, the overall
need for
natural gas in New England's electric sector is expected to decline dramatically as states work toward compliance with existing laws and regulations.
The
need for the «
pipeline tax» arose because power plant owners have been buying
natural gas on the spot market, rather than through long - term contracts, which
pipeline developers
need to have to obtain federal approval.
However, if project
pipelines evolve to include more
natural gas generation projects, care will be
needed to ensure that this «bridge» fuel does not lock out renewables.
This map shows how new infrastructure can be bundled together, with the
needs for new electricity power lines,
natural gas pipelines and the fiber optic cables for the National Broadband Network can all be laid at once.
We do not
need expensive new
natural gas pipelines or to develop counterproductive bailouts to uneconomic fossil fuel generators, which would only raise electricity bills, bring more polluting energy into the region, exacerbate climate change, and slow New England's progress toward a clean, resilient, and fuel secure grid.
Pipelines are the safest way of transporting oil and
natural gas, and we
need more of them, without delay.»
Much more transmission and
natural gas pipeline infrastructure will be
needed to support new generation
needs.
And the report's over-reliance on
natural gas necessitates unnecessarily big assumptions about
pipeline needs.
For a number of months we've been talking about the
need for more efficient and predictable federal processes for the permitting of energy infrastructure — including new
natural gas pipelines and added capacity.
NRDC worked closely with Black Rock to create the fund, and more
natural gas pipelines will likely
needed in California if Diablo Closes.
He has also recently led analysis examining the
need for, and the cost of, the Access Northeast (ANE)
natural gas pipeline — with a particular focus on how state clean energy policies would impact
natural gas demand going forward.
In 2015, three consulting firms released separate reports for different clients analyzing the
need for incremental
natural gas pipeline in New England through 2030.
New technologies like «micro-LNG,» which allow production of
natural gas for markets without
pipeline networks, add to the
need for regulators to get a firm grasp on the changing
natural gas landscape.
Nevertheless, the CPP will cause states, taxpayers, and energy consumers to get stiffed with huge cost burdens, including capital - intensive, decades - long transitions
needed for adding expensive and unreliable wind and solar infrastructures, coal plant retirements and upgrades, restructured transmission lines, and new
natural gas pipelines.