For example, Uber, creator of the groundbreaking transportation service, will have an office at 1455/1515 Third Street,
a new building scheduled to open in 2018.
Not exact matches
Important factors that could cause actual results to differ materially from those reflected in such forward - looking statements and that should be considered in evaluating our outlook include, but are not limited to, the following: 1) our ability to continue to grow our business and execute our growth strategy, including the timing, execution, and profitability of
new and maturing programs; 2) our ability to perform our obligations under our
new and maturing commercial, business aircraft, and military development programs, and the related recurring production; 3) our ability to accurately estimate and manage performance, cost, and revenue under our contracts, including our ability to achieve certain cost reductions with respect to the B787 program; 4) margin pressures and the potential for additional forward losses on
new and maturing programs; 5) our ability to accommodate, and the cost of accommodating, announced increases in the
build rates of certain aircraft; 6) the effect on aircraft demand and
build rates of changing customer preferences for business aircraft, including the effect of global economic conditions on the business aircraft market and expanding conflicts or political unrest in the Middle East or Asia; 7) customer cancellations or deferrals as a result of global economic uncertainty or otherwise; 8) the effect of economic conditions in the industries and markets in which we operate in the U.S. and globally and any changes therein, including fluctuations in foreign currency exchange rates; 9) the success and timely execution of key milestones such as the receipt of necessary regulatory approvals, including our ability to obtain in a timely fashion any required regulatory or other third party approvals for the consummation of our announced acquisition of Asco, and customer adherence to their announced
schedules; 10) our ability to successfully negotiate, or re-negotiate, future pricing under our supply agreements with Boeing and our other customers; 11) our ability to enter into profitable supply arrangements with additional customers; 12) the ability of all parties to satisfy their performance requirements under existing supply contracts with our two major customers, Boeing and Airbus, and other customers, and the risk of nonpayment by such customers; 13) any adverse impact on Boeing's and Airbus» production of aircraft resulting from cancellations, deferrals, or reduced orders by their customers or from labor disputes, domestic or international hostilities, or acts of terrorism; 14) any adverse impact on the demand for air travel or our operations from the outbreak of diseases or epidemic or pandemic outbreaks; 15) our ability to avoid or recover from cyber-based or other security attacks, information technology failures, or other disruptions; 16) returns on pension plan assets and the impact of future discount rate changes on pension obligations; 17) our ability to borrow additional funds or refinance debt, including our ability to obtain the debt to finance the purchase price for our announced acquisition of Asco on favorable terms or at all; 18) competition from commercial aerospace original equipment manufacturers and other aerostructures suppliers; 19) the effect of governmental laws, such as U.S. export control laws and U.S. and foreign anti-bribery laws such as the Foreign Corrupt Practices Act and the United Kingdom Bribery Act, and environmental laws and agency regulations, both in the U.S. and abroad; 20) the effect of changes in tax law, such as the effect of The Tax Cuts and Jobs Act (the «TCJA») that was enacted on December 22, 2017, and changes to the interpretations of or guidance related thereto, and the Company's ability to accurately calculate and estimate the effect of such changes; 21) any reduction in our credit ratings; 22) our dependence on our suppliers, as well as the cost and availability of raw materials and purchased components; 23) our ability to recruit and retain a critical mass of highly - skilled employees and our relationships with the unions representing many of our employees; 24) spending by the U.S. and other governments on defense; 25) the possibility that our cash flows and our credit facility may not be adequate for our additional capital needs or for payment of interest on, and principal of, our indebtedness; 26) our exposure under our revolving credit facility to higher interest payments should interest rates increase substantially; 27) the effectiveness of any interest rate hedging programs; 28) the effectiveness of our internal control over financial reporting; 29) the outcome or impact of ongoing or future litigation, claims, and regulatory actions; 30) exposure to potential product liability and warranty claims; 31) our ability to effectively assess, manage and integrate acquisitions that we pursue, including our ability to successfully integrate the Asco business and generate synergies and other cost savings; 32) our ability to consummate our announced acquisition of Asco in a timely matter while avoiding any unexpected costs, charges, expenses, adverse changes to business relationships and other business disruptions for ourselves and Asco as a result of the acquisition; 33) our ability to continue selling certain receivables through our supplier financing program; 34) the risks of doing business internationally, including fluctuations in foreign current exchange rates, impositions of tariffs or embargoes, compliance with foreign laws, and domestic and foreign government policies; and 35) our ability to complete the proposed accelerated stock repurchase plan, among other things.
«British Columbia is on
schedule to
build a liquefied natural gas industry and secure
new economic growth,» said B.C. Premier Christy Clark in a statement.
Boesch is looking to add
new features and functions to the platform, like point - of - sale integration and activity - based forecasting, which would automatically
build schedules based on sales data.
«The only things left to do in the entire
building is putting in
new scalders, which are
scheduled to go in next spring,» he reports.
The
new couch was
scheduled to be delivered that afternoon, and literally 10 minutes before they were supposed to arrive the elevator in our
building broke.
There's a
new subway stop
scheduled to open in the coming years, and a good number of cranes reaching skyward to facilitate the construction of
new buildings.
Arsene Wenger is clearly hoping to get the
new Premier League season off with a bang as he has planned a busy
schedule for the Arsenal players in the
build up to it, with two games in Australia then two games in China before the Emirates Cup and the Community Shield.
They had to figure out the promotional
schedule, introduce
new concessions, plan a team -
building exercise for the sales team... really, they were swamped.
Thus, we're excited that with the four special editions
built into this
new publishing
schedule, we can truly expand the scope and fill up some of our most popular issues.
Tottenham are in the process of
building a
new state - of - the - art 61,000 - seat stadium, which is expected to cost # 750 million and is
scheduled to open next year.
It is also
scheduled to talk about the thorny issue of whether to replace baseball fields near Village Links with a driving range and miniature golf course and to
build new fields near a town home complex.
Preparations to bid and
build the
new recreation complex continue to move forward according to
schedule, he said.
Create
new adventures together and look for ways to
build quality time in your
schedule.
Complicating matters, too, is the way the Park District has gone about it: Commissioners are
scheduled on Wednesday to approve paying the private company that manages its existing golf courses to design and
build the
new youth centers as an «amendment» to the company's current contract.
After a few weeks, once you begin to have a
schedule and figure out how to work all your your
new baby gear, it is important to
build in playtime for your little one.
Candidates and campaign managers should think of
new media director as an Architect — he or she devises the plans and checks in that construction is going well and on
schedule, but does not necessarily do any actual
building.
At 9:30 a.m., closing arguments are
scheduled in the corruption trial of NYC Councilman Ruben Wills, Part — K22, (3rd Floor — the
new building), Queens Supreme Court, 125 - 01 Queens Blvd., Kew Gardens, Queens.
Comptroller Scott Stringer, Public Advocate Letitia James and
Buildings Department Commissioner Rick Chandler left yesterday for Hollywood to attend a
Building and Construction Trades Council of Greater
New York conference, where all three are
scheduled to speak.
Space for two other
new Success Academy charter elementary schools —
scheduled to co-locate in high school
buildings in lower Manhattan and Queens — were also yanked by the mayor.
«After years of stagnation and stunted ambition, we are
building across the state bigger and better than before, and the energetic felling of the old bridge to make way for the
new, on budget and ahead of
schedule bridge, showcases our renewed commitment to
building new, inspiring infrastructure for the future,» Governor Cuomo said.
He has also called for immediately increasing the minimum wage in the city to $ 15, which it is
scheduled to reach by 2019; free subway and bus fares for low - income
New Yorkers, to be paid for by «jettisoning» de Blasio's BQX streetcar plan; establishing a «
New York City Land Bank»; ensuring a right to counsel for undocumented immigrants; and prohibiting ICE from being in the vicinity of city
buildings.
Comptroller Scott Stringer, Public Advocate Letitia James and
Buildings Department Commissioner Rick Chandler left Thursday for Hollywood, Fla., to attend a
Building and Construction Trades Council of Greater
New York conference, where all three are
scheduled to speak.
Carrión put points on the board by saying he used an «Airbnb - like» service to
schedule a family trip to Barcelona, explaining that regulations could be
built to make something similar work in
New York.
The next Wage Board meeting is
scheduled for November 13th at the Mahoney State Office
Building in Buffalo,
New York at 12 noon.
SAUGERTIES >> Town officials have
scheduled a June 18 public information session with a representative of Pilgrim Pipeline to discuss the company's proposal to
build a pipeline between Albany and
New Jersey.
A member of the
New Patriotic Party (NPP), Gabby Asare Otchere Darko has expressed his disappointment in claims by the party's General Secretary, Kwabena Agyepong that he was oblivious of Nana Addo's
schedule for the «Rise and
Build» tour, especially in the Volta Region
Peter Rive is also the designer and developer of solar panels
scheduled to be
built en masse in a
new plant in South Buffalo,
built with financial help from the so - called Buffalo Billion.
BY TERESE LOEB KREUZER When Christopher O. Ward became executive director of the Port Authority of
New York and
New Jersey in May 2008, the
buildings at the World Trade Center site under the Port Authority's jurisdiction were years behind
schedule and billions of dollars over budget.
The
new playground is
scheduled to be
built by hundreds of local volunteers in the spring of 2017.
While the residents of Stebbins — Hewitt are already in the process of receiving the delivery of
new appliances, On Friday, December 9th at 3:30 PM, Assemblyman Crespo, Senator Diaz and NYCHA staff will meet with the residents of 1350 Manor Avenue of the Bronx River Houses Senior
Buildings to announce their delivery
schedule.
New Jersey Gov. Chris Christie said Monday that the Islamic community center and mosque
scheduled to be
built several blocks from Ground Zero in
New York City is being used as a «political football.»
The project's
schedule, according to a report by the
New York University's Rudin Center for Transportation, ended up 18 months shorter and an estimated 15 percent cheaper than it would have been under the design - bid -
build model.
The
new sewer
schedule adopted in March adjusts rates to account for the spat of
new mixed - use
buildings in the city.
The Ulster County Industrial Development Agency has unanimously approved a payment in lieu of taxes (PILOT)
schedule for a developer to
build student / faculty housing for SUNY
New Paltz.
The city decided to add the extra 180 seats after realizing that two
new floors could be added to the
building without delaying its
scheduled 2015 opening date.
The Upper West Side's rat academy session,
scheduled for Aug. 15 at 2 p.m. at Community Board 7 at 250 W. 87th St., will educate
building owners, management and staff on
new rat control techniques and best practices, said Jesse Bodine of Brewer's office.
While the auction is
scheduled for May 10, the pair still have time to get the legislation to pass afterwards because of the city's long approval process to
build a
new home.
And DOE was told not to spend more than $ 115 million on the U.S. contribution to ITER, the international fusion reactor being
built in France, until ITER officials present a
new schedule for the troubled project.
Girard said she often has to take time out of her
schedule to literally sit down with, say, a
building developer to educate that person on the perils of trying to construct a
new project in a flood zone.
SPIRou and SPIP, the next - generation infrared spectropolarimeters
built at IRAP for the CFHT and TBL,
scheduled for first light in 2017 and 2019 respectively, will offer vastly superior performance and make it possible to study the formation of
new worlds with unprecedented sensitivity.
It hopes to start
building the first
new heavy icebreaker in 2020, with completion
scheduled for 2023.
Last February, the Department of Energy selected sixcompanies to receive funding towards
building ethanol plants —
scheduled to beoperational within the next three years — that will utilize
new technology forprocessing corn stover as well as other types of agricultural waste.
LONDON — The UK Government has been telling its parliament and the public that because eight large nuclear stations are
scheduled to close over the next 10 years, the country needs urgently to
build some
new ones to keep the nation's lights on.
Short energy -
building workouts can fit into your busy
schedule throughout the day while you focus on your
new beautiful baby.
But constantly meeting
new people, trying
new places, trying to
build relationships — all while attempting -LCB- and usually failing -RCB- at creating a regular
schedule.
With sequels and spin - offs suddenly featuring so prominently in the
schedule of a company
built on original storytelling, it's refreshing to see Unkrich, co-director Adrian Molina, and their two fellow credited writers introducing all -
new characters instead of recycling and revisiting ones already embraced by audiences.
9 — Curriculum and instruction: «
Scheduling: Organizing for Effective Instruction,» and «Integrated Curriculum: Beginning To
Build Bridges,» seminars, sponsored by the
New England League of Middle Schools, for middle school teachers and administrators, to be held in Providence, R.I. Contact: Jean Blanchard, N.E.L.M.S., 460 Boston St., Suite 4, Topsfield, Mass. 01983 - 1223; (508) 887-6263; fax: (508) 887-6504.
The
New York state early childhood program monitoring protocol, for example, includes cumbersome requirements that don't have a clear connection to improved student learning — such as a «block
building area with an adequate supply of blocks in varied sizes that is organized and labeled» and a posted daily
schedule that is «referenced daily, represented in pictures and words, and displayed at children's eye level.»
In
New York, the state sends in program monitors to assess if a pre-K classroom has a «block
building area with an adequate supply of blocks in varied sizes that is organized and labeled,» «a private space for each child's possessions,» and a posted daily
schedule that is «referenced daily, represented in pictures and words, and displayed at children's eye level.»