Sentences with phrase «new rails installed»

I love to deck out my front porch for Fall, but we're having new rails installed next week, so my outdoor decorating will have to wait.

Not exact matches

Stations of the Cross, communion rails and a pulpit have been installed, there are coloured hassocks, new candles and a new entrance bell and a vestment press has replaced the freezer in the sacristy.
The PATH rail system may not install a new crash - prevention system by December 2015 after all, even though the federal deadline was one reason that officials gave just weeks ago for shutting down weekend service between Jersey City and the World Trade Center for a year.
Cuomo directed New York State Department of Transportation Commissioner Joan McDonald to install speed messaging boards, and construct park - appropriate guard rails to protect pedestrians.
The front and rear bumpers, roof rails, grille and moldings, taillight bezels, side mirror, door sill plates, and other trim were powder coated black during the updates, and new glass was installed throughout.
2018 INFINITI QX60 MAJESTIC WHITE W / GRAPHITE # I5960 ~ Premium Package ~ • Bose ® 13 - speaker Premium Audio system, AM / FM / CD / DVD with MP3 playback capability, Radio Data System (RDS), and speed - sensitive volume control • Dual occupant memory system for driver's seat, steering wheel, and outside mirrors • Entry / exit assist for driver's seat and steering wheel • Enhanced Intelligent Key Memory stores an occupant memory position and last used audio, climate control, and navigation settings • Outside mirrors with reverse tilt - down feature • Driver's seat 2 - way power lumbar support • Heated steering wheel • Remote Engine Start • Roof rails (Factory - installed accessory) • Rear bumper protector (VPC - installed accessory) ~ Premium Plus Package ~ • INFINITI InTouch ™ with Navigation and INFINITI InTouch ™ Services ◦ INFINITI Navigation with 8 - inch WVGA color touch - screen display, Lane Guidance, and 3D building graphics ◦ INFINITI InTouch Services (12 months of safety, security, and convenience services) ◦ SiriusXM Satellite Radio with 90 days complimentary trial ◦ SiriusXM Traffic and Travel Link with 4 year complimentary trial access to traffic, weather, fuel prices, stocks, sports, and movie times ◦ Voice recognition for navigation functions, including one - shot voice destination entry • Around View ® Monitor with Moving Object Detection and Front and Rear Sonar System (2 front and 2 rear) • Rain - sensing windshield wipers • Illuminated kick plates (VPC - installed accessory) ~ 20 - inch Wheel & Tire Package ~ • 20 - inch 15 - spoke aluminum - alloy wheels with P235 / 55 -20 H - rated all - season tires ~ Cargo Package ~ • Tonneau cover • Underfloor storage dividers • First aid kit • Cargo protector ~ Splash Guards ~ • Color matched set of 4 splash guards INFINITI Of Hoffman Estates A Motor Werks Store Offers The Highest Quality New And Pre-Owned Vehicles That Represent The Best Value Anywhere!
4 - Wheel Disc Brakes, 6 Speakers, ABS brakes, Adaptive suspension, Air Conditioning, AM / FM radio, Anti-whiplash front head restraints, Audio 20 w / Single CD, Auto tilt - away steering wheel, Auto - dimming door mirrors, Auto - dimming Rear - View mirror, Automatic temperature control, Axle Ratio: 3.27, Brake assist, Bumpers: body - color, CD player, Child - Seat - Sensing Airbag, Delay - off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A / C, Front reading lights, Fully automatic headlights, Garage door transmitter: Homelink, Genuine wood dashboard insert, Genuine wood door panel insert, Heated door mirrors, Illuminated entry, Knee airbag, Leather steering wheel, Low tire pressure warning, MB - Tex Upholstery, Memory seat, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Liftgate, Power passenger seat, Power steering, Power windows, Premium audio system: COMAND, Radio data system, Rain sensing wipers, Rear anti-roll bar, Rear fog lights, Rear reading lights, Rear seat center armrest, Rear window defroster, Rear window wiper, Remote keyless entry, Roof rack: rails only, Security system, Speed control, Speed - sensing steering, Split folding rear seat, Steering wheel memory, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Weather band radio, and Wheels: 18» 5 - Spoke (R31) * Your additional costs are sales tax, tag and title fees for the state in which the vehicle will be registered, $ 925 freight (all new Mercedes - Benz models), any dealer - installed options (if applicable) and a $ 299 dealer processing fee (not required by law).
In the rear portion of the new frame, the structure includes fully boxed rear rails and offers a factory - installed rear axle cross-member.
A new shark bite rear end has been installed so the vehicle feels like its on rails.
About 12,000 miles on new motor, transmission & differentialsGM HT 383 Stroker MotorEdlebrock TBI to TPI conversion intakeEdlebrock shorty headersPosi - traction rearNew differential gears, ratio raised to mate with larger tiresNew transmission installed when the motor was installed700R built for towingElectric fanNew 33» BFGoodrich All Terrain TA KO2 «sSteel braded brake linesUpgraded four rail
The bumpers were made of 1 - inch chrome - moly steel tubing and powdercoated by Specialized Powdering in Huntington Beach, California, using a new powdercoating process that resembles an anodized - blue color.To carry the dirt bike with ease, a custom ramp and rail were fabricated and installed in the bed, enabling quick loading and unloading of the KTM Motorcycle.
[6] The show was well received by critics, including Frieze Magazine [14] and The Brooklyn Rail, noting «Quaytman makes reference in the title to both the seat of seeing (i am), and the classical meter of poetry», and «Quaytman's sophisticated dissection of the complexities of seeing and the manifold aspects that inform perception is evident not only in individual works, but also in the relationship between specific works installed in the exhibition, and in the cumulative effect of the whole,» [13] and the New York Times «The paintings in R. H. Quaytman's exhibition are cerebral, physically thought out and resolutely optical.
For the High Line, Bove continues her research on the role and function of art in the public space, by creating seven new sculptures which are installed within the self - seeded landscape on the High Line at the Rail Yards.
Just a few days before installing the exhibit High Times, Hard Times: New York Paintings 1967 — 1975, which features over 40 significant works by 30 artists and will be on view at the National Academy Museum from February 15 until April 22, 2007, curator Katy Siegel welcomed David Reed, who serves as the exhibit's advisor, and the Rail's Publisher Phong Bui to her home in Boerum Hill to discuss the work and artists included in this broad survey of experimental abstract painting.
The artist's steel - beam sculpture Lingam (2015) was installed in City Hall Park in New York as part of the 2016 summer group exhibition The Language of Things, organized by Public Art Fund, and in 2013, she created a series of sculptures specifically for the High Line at the Rail Yards in New York.
• Examine existing tracks to determine need for repair and maintenance and provide feedback to the supervisor • Clear sites by removing debris and hazardous materials to make them ready for new track installations • Install new tracks by laying and fixing foundations and sleepers for tracks • Cut rails to appropriate lengths prior to installation and ensure that they conform to set standards • Remove damaged rail parts and ensure that new ones are installed within given timelines • Maintain switch signal lamps and wheel bearings of rolling stock and assist with righting of derailed rolling stock • Inspect tracks for defects using a variety of tools and equipment, as well as sight checks • Carry out site surveys to identify maintenance needs of track sections
I had a list of handyman jobs including install new light fixtures, replace deck boards, painting railings, repair a ceiling and drywall, install a sliding glass door.
We got a pretty delayed getting new flooring because we realized we need to completely redo all of our railings and banisters before getting hardwoods installed... which is a project we have planned and will be tackling at the same time as the ORC for the den because we a crazy!!
She painted the walls a similar color, added picture moldings below the chair rail, and installed a new chandelier:
a b c d e f g h i j k l m n o p q r s t u v w x y z