Sentences with phrase «new timber frame»

By contrast, the new timber frame first - floor walls and roof are of a fully breathable construction consisting of a twin - stud wall filled with Warmcel cellulose (recycled newspaper) insulation.
1 Oscar Baldry getting down to work in the old newsagent's shop; 2 laying Kingspan and Ecotherm insulation in the ground floor of the old shop; 3 first floor metal web joist detailing, with membrane behind the joists for airtightness; 4 ground floor walls feature 50 mm Xtratherm internal insulation; 5 this is followed inside by an Intello vapour control barrier and a further 25 mm Xtratherm; 6 the new timber frame first - floor twin - stud walls and roof rafters are of a fully breathable construction and full - filled with Warmcel cellulose insulation; 7 holes in the timber - frame where the Warmcel insulation was pumped in; 8 a pro clima Intello membrane on the inside of the first - floor walls and roof; 9 and finally, 50 mm Thermafleece (sheep wool) lined service cavity to the interior.
Meanwhile, new timber frame extensions to the rear for bathrooms and kitchens were insulated externally with Pavadry wood fibre insulation, but the front required internal insulation to preserve the street façade.

Not exact matches

In a nod to the aspirations of Frieze Masters to bridge the old and the new, Ziegler has rendered the subjects in Brueghel the Elder's painting The Cripples as giant aluminium, three - dimensional, cubistic figures, looped around supporting timber frames instead of crutches.
The Allied Works design turned the dark warehouse into a light - filled, open structure with new concrete and reclaimed Douglas - fir juxtaposed against the existing masonry and heavy timber frame.
Buildings: Three new four - bedroom terraced passive houses & six low energy flats retrofitted into a Victorian terrace Standard: Certified passive new build & low energy fabric - first retrofit Location: Akerman Road, Lambeth, London Completed: December 2016 Total budget: # 2m Build method: Timber frame new build / deep retrofit with internal insulation to Victorian terrace.
MBC Timber Frame has announced the opening of its new manufacturing and design premises at Quedgeley Court, Gloucester.
New windows & doors: Green Building Store Ultra triple - glazed timber windows with insulated frames, overall U-value of 0.8 W / m2K.
The University of Massachusetts Amherst's new design school is the first academic building in the US to have a structural frame made of cross-laminated timber, according to its architects Leers Weinzapfel Associates.
Built with a timber frame insulated with straw - bale, and featuring an extensive suite of ecological and recycled materials, this stunning North Yorkshire home also produces more energy than it consumes, making it the first straw - bale building in the world to reach the brand new «passive house plus» standard.
Windows Before: Double glazed PVC windows with overall U-value of approximately 1.4 W / m2K New triple glazed windows: Pozbud Passive Ultima, thermally broken timber - framed windows with Aerogel insulation and aluminium cladding externally.
Dunster designs it to be a mix of old and new, using medieval timber framing techniques that enable the frame to be made of «man handleable pieces» that can be delivered on pallets.
Architects: Gresford Architects Project Manager: Trunk Low Energy Building Passive house certifier: Warm Timber frame: MBC Timber Frame Insulated foundations: KORE Structural engineer: Tanner Structural Design Glazing: Ideal Combi MVHR: Green Building Store General fit out & contractor: Husker Ltd Electric contractor: Nightingale Electrical Building society: Ecology Building Society Thermal bridge assessor: Passivate M&E consultant: Crofton Landscape architect: New British Landscapes Airtightness products: Siga Roofing membrane: Partel OSB & sheathing boards: Coillte Panel Products Wall & roof insulation: Springvale EPS Mineral wool insulation: Knauf Thermal blocks: Foaframe: MBC Timber Frame Insulated foundations: KORE Structural engineer: Tanner Structural Design Glazing: Ideal Combi MVHR: Green Building Store General fit out & contractor: Husker Ltd Electric contractor: Nightingale Electrical Building society: Ecology Building Society Thermal bridge assessor: Passivate M&E consultant: Crofton Landscape architect: New British Landscapes Airtightness products: Siga Roofing membrane: Partel OSB & sheathing boards: Coillte Panel Products Wall & roof insulation: Springvale EPS Mineral wool insulation: Knauf Thermal blocks: FoaFrame Insulated foundations: KORE Structural engineer: Tanner Structural Design Glazing: Ideal Combi MVHR: Green Building Store General fit out & contractor: Husker Ltd Electric contractor: Nightingale Electrical Building society: Ecology Building Society Thermal bridge assessor: Passivate M&E consultant: Crofton Landscape architect: New British Landscapes Airtightness products: Siga Roofing membrane: Partel OSB & sheathing boards: Coillte Panel Products Wall & roof insulation: Springvale EPS Mineral wool insulation: Knauf Thermal blocks: Foamglas
Operating out of our factory in Berkshire, we offer a full window service, comprising draught sealing, double glazing of existing windows and the manufacture and installation of secondary double glazing, new sashes into existing frames (replacing just the moving parts) and complete new sash windows, wooden casement windows, timber French doors, Front doors and Bi-fold doors.
Although a new - build, with its classic timber frame the house looks like a well established country home.
If you need to replace sash windows, just one brand - new two - over-two (four panes) Victorian - style timber - framed sash will set you back more than # 1,000 but, if you just repair rather than replace, you can make significant savings.
3 Timber trim (to hide the join where the new plank and existing door frame meet).
Alternatively we can manufacture and install complete new timber box sash windows including the frame.
In the kitchen, Jeff quite literally elevated traditional timber frame design by taking one of its main tenets — vaulted ceilings — to new, 18 - foot heights.
a b c d e f g h i j k l m n o p q r s t u v w x y z