In the
build up to E3 2014, Oculus announced a
new publishing division,
building a roster of exclusives — including the Mario - like platform fun of Lucky's Tale from Words With Friends creator Paul Bettner and Polish bullet - time
simulator Super Hot — that were all playable.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of
new 458 parking spaces • Install
new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct
new storm drain system, Bio-swale, landscaping and
new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) •
Build single story, metal framed, 47,640 square foot of classroom
building • Construct classrooms, fire lab, driving and shooting
simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory
building • Ensure compliance with Title 24 and the latest code and
building regulations • Perform asbestos abatement, installation of HVAC system with
new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the
building and install complex
new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction