Sentences with phrase «nuclear fuels fabrication»

The plume resulted from nuclear fuels fabrication activities that took place from 1943 to 1975.

Not exact matches

Throughout the nuclear fuel cycle, many separations are required — in mining, enrichment and fuel fabrication, and then after fuel use, for the recovery of usable spent isotopes and the encapsulation and storage of unusable radioactive components.
For the first time in decades a new uranium rod fabrication plant is operating in New Mexico and it may soon be joined by as many as three others in the U.S.. That's because 2013 will see the expiration of an agreement with Russia that allows the U.S. to blend down the highly enriched uranium from decommissioned Russian nuclear warheads into the lower level enriched fuel used in U.S. nuclear reactors — a program known as «Megatons to Megawatts» that currently provides as much as 50 percent of U.S. nuclear fuel.
To implement the PMDA, the United States has been building a mixed oxide (MOX) fuel fabrication facility to convert the plutonium into nuclear reactor fuel.
Nuclear - grade zirconium alloys and products are used in the fabrication of fuel assemblies, which are used in the vast majority of nuclear reactor designs either currently operating, under construction, or planned around theNuclear - grade zirconium alloys and products are used in the fabrication of fuel assemblies, which are used in the vast majority of nuclear reactor designs either currently operating, under construction, or planned around thenuclear reactor designs either currently operating, under construction, or planned around the world.
• The restructuring of the former Areva into Framatome and Orano is complete, with the world's largest nuclear plant operator EDF taking ownership of Framatome, which focuses on reactors, fuel fabrication and services.
Our lawyers are versed in US and international requirements covering new plants, power plant projects and transactions, plant regulation, nuclear liability issues, and all aspects of the nuclear fuel cycle, from uranium mining, enrichment, fabrication, and transport to nuclear waste management, decommissioning, and disposal.
Operated largely out of a fabrication shop in El Mirage, and Palo Verde Nuclear Power Plant, assisting in the fabrication and welding of projects including panel fence sections, swinging fence gates, Truck mounted tool boxes, fuel cells, air conditioning ventilation stands etc..
a b c d e f g h i j k l m n o p q r s t u v w x y z