Here you can check in on the status of several
of our largest projects currently underway.
Not exact matches
Fruta del Norte is one
of the highest - grade and
largest gold
projects currently under construction.
A number
of issues were discussed including the impact
of the proposed amendments to the Yukon Environmental and Socio - economic Assessment Board Act, which is
currently before Parliament and which will among other things, remove set timelines for assessments as well as requiring re-assessments for
large scale mining
projects, where a full environmental screening has already been positively concluded.
«We are
currently working on a range
of projects with medium and
large scale brands that rely on our skills and experiences developed over many years, working closely with similar organisations on a variety
of challenging
projects,» said Kevin Laughton, co-founder and consultant, and vice chairman
of The Packaging Society.
Today, we are going to expand the port to be able to take four times the volume that it
currently takes and we are creating four new berths
of 16 metres deep that can take the
largest container vessels because Ghana's import volumes have risen and if you
project the rate
of growth
of the country, there will be no space in Tema Port to be able to take anything in a few years.
India, Indonesia also see rising production GBI
projects that India,
currently the world's third -
largest coal producer, will also see a surge in production — on the order
of 6.8 percent annually — because
of the country's heavy reliance on coal - fired electricity along with expanding steel, cement and fertilizer manufacturing sectors.
Although our library contained 100 herbal species in this study it is part
of a
larger project in which we are
currently expanding the SRM herbal barcode library to include the main species used within herbal product industry in North America.
Hopefully, the lessons
of collaboration the station brought will encourage emerging countries and nations that are
currently still going it alone to reach out, and the mechanisms that made ISS and other
large scientific
projects a success can be applied to other domains elsewhere on Earth, and follow us beyond, as we continue to push the frontier
of our search and travels.
Although the technical details and the cost estimates
of the
project are yet to be announced, a concept design released during the Humans to Mars conference in Washington, D.C., Wednesday depicted a structure, built using two Orion crew capsules — which NASA and Lockheed are
currently building — linked to a
larger habitat and Mars laboratory module.
You will be allocated to
Project Area Group that corresponds with
larger research
projects that are
currently taking place within the Green Chemistry Centre
of Excellence.
Lastly, José is
currently involved in a
large multi-institutional
project (A Better Start) in New Zealand, with a leading role in a number
of studies aiming to predict, prevent, and mitigate childhood obesity in the country.
One
of the
largest crowdfunding
projects of all time, Star Citizen is an upcoming space sim
currently in development by Cloud Imperium Games.
Also, while I'm
currently in the process
of creating my first
large branching
project, Li Whybrow has compiled 5 excellent examples with great commentary on each.
Currently, over 65 % of all libraries currently deal with Axis 360, and this has allowed them to gain the attention of many larger publishers for a series of ebook pilot
Currently, over 65 %
of all libraries
currently deal with Axis 360, and this has allowed them to gain the attention of many larger publishers for a series of ebook pilot
currently deal with Axis 360, and this has allowed them to gain the attention
of many
larger publishers for a series
of ebook pilot
projects.
Project Gutenberg, founded in 1971 by Michael Hart is
currently the
largest free source
of ebooks.
Project Gutenberg
currently has over 25,000 titles available for download making it one
of the
largest and best resources for free «out
of copyright» books (if you are not a residence
of the U.S.A. please check the copyright status
of your own country).
The
project was exhibited as a
large scale installation at the Les Nuits Photographiques in Paris, PMQ in Hong Kong, the CAFA museum in Beijing, and is
currently in the permanent collection
of the Museum
of Contemporary Photography in Chicago.
A
larger project is
currently being considered that would create the
largest hydro - electric generator in the world, potentially double that
of the current record holder - the Three Gorges facility on the Yangtze River in China.
«Tourism is
currently the country's second
largest industry and this has huge significance for the economy as US$ 80 billion worth
of investment into key infrastructure
projects including airport expansion, railways and roads comes to fruition in the next ten years,» remarks Walsh.
Puerto Madero
currently represents the
largest urban renewal
project in the city
of Buenos Aires.
According to hotel.info, the leading online hotel reservations service for over 210,000 hotels around the world, the economic crisis and associated corporate pressure to reduce costs has created a clear trend for increased use
of low cost online hotel reservation tools.Especially
large corporations that make high numbers
of bookings are
currently using the present economic situation as a reason to move from planning to use online hotel reservation tools towards actually implementing such
projects in - house or at least promoting the use
of existing online applications to save costs.
Currently our team
of 50 is working on CFG's
largest project to date: Phantom Doctrine.
This first Warhammer game joins the eagerly - awaited Total War: Rome II and the untitled Alien IP as one
of five
projects currently in production at Creative Assembly, now one
of the
largest developers in Europe.
Creative Assembly is one
of the
largest studios in Europe and there are multiple games
currently in development; including Total War Battles: KINGDOM, Total War: ARENA, Total War: ATTILA and other unannounced titles, with individual teams on each
project.
He is
currently a Fellow
of the Hamiltonian Gallery, Washington, DC and
currently has a
large - scale public artwork on view as part
of Ceremonies
of Dark Men, part
of the 5 X 5
Project Public Art, curated by A.M. Weaver and organized by the DC Commission on the Arts and Humanities.
Jochen Volz is
currently Artistic Director at the Instituto Inhotim, Minas Gerais, Brazil, where he has co-curated a series
of large - scale site - specific
projects on -LSB-...]
He is
currently working on a publication with Teknisk Industri AS, a
large scale exhibition
project in collaboration with the Murmansk Museum
of Fine Art and the exhibition «the shadow
of war» at Kunstnernes Hus, Oslo.
Max Presneill is
currently the Executive Director and Head Curator for the Torrance Art Museum as well as Curatorial Director
of ARTRA Curatorial, an independent curatorial
projects management team who organize the CO / LAB — an art fair for alternative spaces which is free to participants - as well as the MAS ATTACK series
of large - scale pop - up exhibitions.
The Troutman building
currently hosts the
largest and most experimental concentration
of neighborhood galleries outside
of the must - see spaces at 56 Bogart Street, including Regina Rex, Parallel Art Space, Ortega Y Gasset
Projects, Bull and Ram, Underdonk, and Harbor.
Jochen Volz is
currently Artistic Director at the Instituto Inhotim, Minas Gerais, Brazil, where he has co-curated a series
of large - scale site - specific
projects on art and architecture with artists, including Adriana Varejão, Dominique Gonzalez - Foerster, Doris Salcedo, Doug Aitken, Hélio Oiticica, Matthew Barney and Rirkrit Tiravanija, as well as numerous exhibitions from the collection.
He is
currently working on Slave Rebellion Reenactment, a
project that will reenact the
largest rebellion
of enslaved people in North American history.
He is
currently Artistic director
of one
of the most important urban development
projects in Europe, the Lyon «Rives de Saône - River Movie», and has been named recently as co-artistic director to the Grand Paris Express
project - France's
largest urban redefinition through culture initiative since Haussmann.
(The Baxter St installation is a smaller iteration
of Sadie's
large - scale installation, My Father FBI File,
Project I, 2016, which is
currently on view in the group exhibition, «All Power to the People: Black Panthers at 50» at the Oakland Museum
of California.)
Further, the conservation measures
currently being highlighted by National Geographic's Big Cat Initiative and Panthera's
Project Leonardo are minuscule compared to the scale
of the problem and it's not clear they could ever do anything effective to conserve an area as
large as the Selous (which is the size
of Switzerland).
Although global forests
currently capture and store more carbon each year than they emit, 46 the ability
of forests to act as
large, global carbon absorbers («sinks») may be reduced by
projected increased disturbances from insect outbreaks, 47 forest fire, 48 and drought, 49 leading to increases in tree mortality and carbon emissions.
The South, Southwest, and Northeast may be especially prone to
large increases in unusually hot summers.3 Parts
of the South that
currently have about 60 days per year with temperatures over 90 degrees are
projected to experience 150 or more days a year above 90 degrees by the end
of this century.4
China is
currently the
largest emitter
of energy - related CO2 emissions in the world and is
projected to remain in that position through 2040.
But no
large - scale
projects currently operate at power plants, and Howard Herzog, a CCS expert at Massachusetts Institute
of Technology (MIT), said efforts to scale up the industry are largely on hold.
Cross Laminated Timber (CLT)-- prefabricated panels
of wood whose strength, dimensional stability, rigidity, and
large spans make it a replacement for structural steel or concrete — is
currently far from a go - to building material in the U.S.. However, in what is likely an indicator
of explosive growth, new product offerings for North America are arising almost as quickly as new
projects are constructed with the material.
However, there remains uncertainty in the rate
of sea ice loss, with the models that most accurately
project historical sea ice trends
currently suggesting nearly ice - free conditions sometime between 2021 and 2043 (median 2035).12 Uncertainty across all models stems from a combination
of large differences in projections among different climate models, natural climate variability, and uncertainty about future rates
of fossil fuel emissions.
In Europe, the EU Commission is
currently setting up an $ 8 ($ 13) million
project for a
large - scale trial
of LNG corridors («Blue Corridors») where truckers can fuel up.
The Department
of Energy continues to fund hundreds
of new research
projects in the green sector each year, and is
currently funding many geothermal research
projects in the U.S. on a
large scale.
Single - axis tracking technology will be deployed in the vast majority
of Australian
large scale solar
projects currently under development.
Although coal
currently is the second -
largest fuel source
of energy - related carbon dioxide emissions (behind oil), accounting for 39 percent
of the world total in 2004, it is
projected to become the
largest source by 2010.
Climate Commons is part
of a
larger art
project by Jane D Marsching called Arctic Listening Post which is
currently on show at The Institute
of Contemporary Art in Boston.
The Department
of Energy is
currently seeking $ 648 million for «clean coal»
projects in its 2009 budget request, «representing the
largest budget request for coal RD&D in over 25 years.»
Real - world CO2 emissions have tracked the high end
of earlier emissions scenarios [105], and until the
currently wealthy countries can produce a
large decline in their own emissions per capita, it is dubious to
project that emissions per capita in the less developed countries will not continue on a trajectory up to the levels
of currently wealthy countries.16
That includes cancelling the wind power contracts awarded past spring, cancelling contracts for wind power
projects not yet built, cancelling contracts for
projects already operating that are not meeting the terms
of their Renewable Energy Approvals, and permanently cancelling the
Large Renewable Procurement (LRP) II process, which is
currently only «suspended.»
While it is unrealistic to expect that most mid-sized law firms can match the multi-skilled resources
of larger firms, mid-sized firms should identify and prioritize those (1) profitable areas
of current and
projected practice for emphasis and investment, (2) areas for maintenance and incremental improvement, (3) areas not
currently offered to be added, and (4) those current practices to be de-emphasized or divested.
Having spent over 10 years in London working on some
of the
largest regeneration
projects in England, he now acts primarily for private sector clients and is
currently advising on schemes which will deliver in excess
of 10,000 houses.