FiroShield has also been tested
on other construction materials, such as reinforced concrete and laminated timber, and has the same excellent performance.
Not exact matches
Such risks, uncertainties and
other factors include, without limitation: (1) the effect of economic conditions in the industries and markets in which United Technologies and Rockwell Collins operate in the U.S. and globally and any changes therein, including financial market conditions, fluctuations in commodity prices, interest rates and foreign currency exchange rates, levels of end market demand in
construction and in both the commercial and defense segments of the aerospace industry, levels of air travel, financial condition of commercial airlines, the impact of weather conditions and natural disasters and the financial condition of our customers and suppliers; (2) challenges in the development, production, delivery, support, performance and realization of the anticipated benefits of advanced technologies and new products and services; (3) the scope, nature, impact or timing of acquisition and divestiture or restructuring activity, including the pending acquisition of Rockwell Collins, including among
other things integration of acquired businesses into United Technologies» existing businesses and realization of synergies and opportunities for growth and innovation; (4) future timing and levels of indebtedness, including indebtedness expected to be incurred by United Technologies in connection with the pending Rockwell Collins acquisition, and capital spending and research and development spending, including in connection with the pending Rockwell Collins acquisition; (5) future availability of credit and factors that may affect such availability, including credit market conditions and our capital structure; (6) the timing and scope of future repurchases of United Technologies» common stock, which may be suspended at any time due to various factors, including market conditions and the level of
other investing activities and uses of cash, including in connection with the proposed acquisition of Rockwell; (7) delays and disruption in delivery of
materials and services from suppliers; (8) company and customer - directed cost reduction efforts and restructuring costs and savings and
other consequences thereof; (9) new business and investment opportunities; (10) our ability to realize the intended benefits of organizational changes; (11) the anticipated benefits of diversification and balance of operations across product lines, regions and industries; (12) the outcome of legal proceedings, investigations and
other contingencies; (13) pension plan assumptions and future contributions; (14) the impact of the negotiation of collective bargaining agreements and labor disputes; (15) the effect of changes in political conditions in the U.S. and
other countries in which United Technologies and Rockwell Collins operate, including the effect of changes in U.S. trade policies or the U.K.'s pending withdrawal from the EU,
on general market conditions, global trade policies and currency exchange rates in the near term and beyond; (16) the effect of changes in tax (including U.S. tax reform enacted
on December 22, 2017, which is commonly referred to as the Tax Cuts and Jobs Act of 2017), environmental, regulatory (including among
other things import / export) and
other laws and regulations in the U.S. and
other countries in which United Technologies and Rockwell Collins operate; (17) the ability of United Technologies and Rockwell Collins to receive the required regulatory approvals (and the risk that such approvals may result in the imposition of conditions that could adversely affect the combined company or the expected benefits of the merger) and to satisfy the
other conditions to the closing of the pending acquisition
on a timely basis or at all; (18) the occurrence of events that may give rise to a right of one or both of United Technologies or Rockwell Collins to terminate the merger agreement, including in circumstances that might require Rockwell Collins to pay a termination fee of $ 695 million to United Technologies or $ 50 million of expense reimbursement; (19) negative effects of the announcement or the completion of the merger
on the market price of United Technologies» and / or Rockwell Collins» common stock and / or
on their respective financial performance; (20) risks related to Rockwell Collins and United Technologies being restricted in their operation of their businesses while the merger agreement is in effect; (21) risks relating to the value of the United Technologies» shares to be issued in connection with the pending Rockwell acquisition, significant merger costs and / or unknown liabilities; (22) risks associated with third party contracts containing consent and / or
other provisions that may be triggered by the Rockwell merger agreement; (23) risks associated with merger - related litigation or appraisal proceedings; and (24) the ability of United Technologies and Rockwell Collins, or the combined company, to retain and hire key personnel.
Factors that could cause actual results to differ include general business and economic conditions and the state of the solar industry; governmental support for the deployment of solar power; future available supplies of high - purity silicon; demand for end - use products by consumers and inventory levels of such products in the supply chain; changes in demand from significant customers; changes in demand from major markets such as Japan, the U.S., India and China; changes in customer order patterns; changes in product mix; capacity utilization; level of competition; pricing pressure and declines in average selling prices; delays in new product introduction; delays in utility - scale project approval process; delays in utility - scale project
construction; delays in the completion of project sales; continued success in technological innovations and delivery of products with the features customers demand; shortage in supply of
materials or capacity requirements; availability of financing; exchange rate fluctuations; litigation and
other risks as described in the Company's SEC filings, including its annual report
on Form 20 - F filed
on April 27, 2017.
Factors that could cause actual results to differ include general business and economic conditions and the state of the solar industry; governmental support for the deployment of solar power; future available supplies of high - purity silicon; demand for end - use products by consumers and inventory levels of such products in the supply chain; changes in demand from significant customers; changes in demand from major markets such as Japan, the U.S., India and China; changes in customer order patterns; changes in product mix; capacity utilization; level of competition; pricing pressure and declines in average selling prices; delays in new product introduction; delays in utility - scale project approval process; delays in utility - scale project
construction; continued success in technological innovations and delivery of products with the features customers demand; shortage in supply of
materials or capacity requirements; availability of financing; exchange rate fluctuations; litigation and
other risks as described in the Company's SEC filings, including its annual report
on Form 20 - F filed
on April 20, 2016.
Factors that could cause actual results to differ include general business and economic conditions and the state of the solar industry; governmental support for the deployment of solar power; future available supplies of high - purity silicon; demand for end - use products by consumers and inventory levels of such products in the supply chain; changes in demand from significant customers; changes in demand from major markets such as Japan, the U.S., India and China; changes in customer order patterns; changes in product mix; capacity utilization; level of competition; pricing pressure and declines in average selling prices; delays in new product introduction; delays in utility - scale project approval process; delays in utility - scale project
construction; cancelation of utility - scale feed - in - tariff contracts in Japan; continued success in technological innovations and delivery of products with the features customers demand; shortage in supply of
materials or capacity requirements; availability of financing; exchange rate fluctuations; litigation and
other risks as described in the Company's SEC filings, including its annual report
on Form 20 - F filed
on April 27, 2017.
With some of our boards, we intentionally push the envelope
on using the the most expensive
materials and
construction methods available, and
others are made with production costs in mind.
If the
construction of Energy East also does not put significant new supply into the world market, it will not have a
material impact
on the revenues collected by
other oil producing nations either.
He also mentioned that the waiver was
on materials and equipment including
other related taxes for the finance, design,
construction, equipping and operation of the project.
A group of investors were approved for $ 348,000 in sales tax savings
on construction equipment and
other materials, and a one - time elimination of the 1 % mortgage recording fee to rehabilitate the vacant 251 Main Street in Buffalo into 36 apartments and commercial space.
The ECIDA Board approved approximately $ 284,000 in sales tax savings for purchases of
construction materials and
other equipment, and a one - time elimination of the mortgage recording tax fee, approximately $ 55,000
on their $ 5.5 million mortgage.
The tax breaks were
on construction materials, equipment and
other supplies needed to reopen.
Hendry's
materials expertise has been leveraged to support
other projects within the company, including
materials characterization expertise and failure analysis in the design and
construction of an advanced
materials processing payload, to be located
on the International Space Station.
In terms of scheduling, major
construction works are best undertaken during school holidays when the obvious issues arising from the contractor's vehicle movements, delivery of
materials, workers in proximity to children, dust, noise, restricted access to existing play areas and a host of
other logistics, health, safety and child protection considerations are less likely to impact
on the school's daily life.
The solid frame
construction combines high - strength steel with
other advanced
materials to ensure all occupants stay safe while
on the road.
However, what really set Navarro's creations apart from
other collars
on the market from the start were the
materials she uses in their
construction.
On this occasion, we present the work of four artists working for some deconstruction through the decomposition of the work, and for
others, the
construction process with the layout and assembly of
materials or different parts that make up a everything.
Her new show Pictures Punish Words at Turin's Fondazione Sandretto Re Rebaudengo will also include her recent forays into 3 - D
constructions in plastic and renderings that are, as the press release states, «
on or in every
other possible
material surface.»
The beginning of Tuttle's career was contemporaneous with the prime of Arte Povera, the Italian movement that put a premium
on using
materials from daily life — industrial
materials, cast - offs from building
construction or
other effects of survival.
The show, Parkinson writes, features «works by Andrew Bick, Stuart Elliot, Robert Holyhead, Clare Kenny, Maria Lalic, Karim Noureldin, David Rhodes, Cullinan Richards, Brandon Taylor, exhibited alongside a «museum» of printed matter related to British
Construction and Systems Art... I have the sense of a past that is locked, only partially accessible via faded documents, memory and influence, as if the works
on the wall are familiarly connected to the archive
material or they can be interpreted as having evolved from a «constructive context,» some more consciously connected to the base than
others, like the system formula that eludes my attempt to discern it, or like Noureldin's drawings wending their way through various permutations, continually repeating and changing, awareness of the past leading to an informed openness to an unknown future.»
[12] Her painting style changed in 1947, turning from small landscapes and portraits into a bold, subjective abstraction when she began to make
constructions from bits of wood and
other materials that washed up
on the beach near her home; [18] most often her
constructions reflected the area around her North Fork home, but sometimes the pieces reflected her travels to the Caribbean and abroad.
While there are no global warming emissions associated with operating wind turbines, there are emissions associated with
other stages of a wind turbine's life - cycle, including
materials production,
materials transportation,
on - site
construction and assembly, operation and maintenance, and decommissioning and dismantlement.
Tiny House — about 400 sq ft or smaller, stud
construction same as any
other large house
on a lot, maybe built
on a foundation (also like a large house) or
on a trailer base to circumvent restrictive building codes (so doesn't really need to be long and narrow but can be square or any
other shape since floor space size is what designates it a Tiny House), most use loft for bedroom but some have a bedroom set up
on the main floor, insulation is usually better than a large house by virtue of less
material needed to build which allows the cost of higher quality
materials be incorporated.
(3) Increasing the Earth's albedo, by, among
other things, requiring the use of high albedo roofing
materials on all new
construction, even requiring the replacement of older, low albedo roofs with higher albedo
materials.
Timely, efficient
construction of pipelines in the U.S. depends
on reliable, available supplies of line pipe and
other materials — the disruption of which could delay projects, impacting energy, jobs and the economy.
The system reduces
construction time and gives a more insulated and energy - efficient interior, but still doesn't seem very green; perhaps
other insulating
materials could be used for the core, such as aerated concretes like Aircrete (more
on autoclaved aerated concrete here).
There are thousands of plastic replacement hemp products
on the market right now, including for furniture, electronics, fiberglass and
other construction materials.
The answer is you couldn't make an apples - to - apples comparison unless the contractors were basing their bids
on a single set of architectural plans specifying size,
materials and
other construction details.
Despite the measures taken to ensure the safety of those using scaffolds, scaffolding accidents still happen as a result of defective
material, falling objects and
other mishaps that take place
on a
construction site.
Although it's not always evident
on the surface,
construction workers are often pushed to meet tight deadlines while having to deal with delays in receiving
materials and
other issues.
On the other hand, perhaps this accident occurs on a road that has not been maintained and has been covered with a slippery and hazardous material due to construction wor
On the
other hand, perhaps this accident occurs
on a road that has not been maintained and has been covered with a slippery and hazardous material due to construction wor
on a road that has not been maintained and has been covered with a slippery and hazardous
material due to
construction work.
Primary areas of expertise include equitable distribution, definition of marital property, definition of separate property, valuation of marital property, divisionof marital property, classification and division of retirement benefits, classification and valuation of professional practices, validity of marital agreements,
construction of marital agreements, amount of alimony, duration of alimony, definition of income for child support, child support, child custody jurisdiction, child custody
on the merits, and admissibility of e-mails and
other material taken off computers.
The app advises that you «place your Wi - Fi hub in an open area within 40 feet of your
other Wi - Fi hubs,» and «the ideal distance may vary depending
on your home's layout and
construction materials.»
Other known features of the Galaxy Alpha include 32 GB of non-expandable storage, a fingerprint scanner, nano SIM slot, and a metallic
construction that sports aluminium
on the sides while keeping Samsung's beloved dimpled faux leather
material on the back.
Other primary tasks include preparation of reports, drawings, and designs, performing calculations with regard to loads and stresses, selecting the right
construction material, offering technical advice and so
on.
Common work activities seen
on a CAD Technician resume include creating technical drawings, designing products, advising
on materials and
construction procedures, and collaborating with
other technicians and engineers.
This is especially true for
construction laborers who work
on demolition projects and roadwork, where remaining
materials can present hazards to workers and
others.
Construction Worker, Mission Renovation2015 — Present • Read blueprints and assign responsibilities to work crew accordingly • Prepare construction sites before crew comes out to make sure all hazards are removed • Measures distances to ensure remodeling and installations will fit perfectly • Erect scaffolding and other safety structures to reduce the number of workplace injuries by 80 percentConstruction Worker, Rose Falls Remodeling2013 — 2015 • Operated jackhammers to break up concrete to install pipes under the earth • Assisted masons, plasterers, and carpenters with specialty work • Cleaned surfaces before and after material was to be applied, which included hosing water, sand, or steam based on the material being worked on • Installed over 60 new roofs on residential houses through
Construction Worker, Mission Renovation2015 — Present • Read blueprints and assign responsibilities to work crew accordingly • Prepare
construction sites before crew comes out to make sure all hazards are removed • Measures distances to ensure remodeling and installations will fit perfectly • Erect scaffolding and other safety structures to reduce the number of workplace injuries by 80 percentConstruction Worker, Rose Falls Remodeling2013 — 2015 • Operated jackhammers to break up concrete to install pipes under the earth • Assisted masons, plasterers, and carpenters with specialty work • Cleaned surfaces before and after material was to be applied, which included hosing water, sand, or steam based on the material being worked on • Installed over 60 new roofs on residential houses through
construction sites before crew comes out to make sure all hazards are removed • Measures distances to ensure remodeling and installations will fit perfectly • Erect scaffolding and
other safety structures to reduce the number of workplace injuries by 80 percentConstruction Worker, Rose Falls Remodeling2013 — 2015 • Operated jackhammers to break up concrete to install pipes under the earth • Assisted masons, plasterers, and carpenters with specialty work • Cleaned surfaces before and after
material was to be applied, which included hosing water, sand, or steam based
on the
material being worked
on • Installed over 60 new roofs
on residential houses throughout the city
Tower Crane Operators man the equipment that is used
on large - scale
construction projects to lift and relocate
construction materials, shipping containers and
other heavy objects.
Use our interior designer resume template for Word and the examples below to create an impeccable work history section.Interior Designer — ABC Designs — Boston, MA — 9/2013 to Current • Work within a team of six to design and decorate the interiors of commercial properties of varying industries and sizes, undertaking up to five projects at a time • Coordinate and oversee
construction, deliveries, plumbing and electrical work, and installations • Exceed annual company profit targets by 10 percent with increased referrals from satisfied customers • Utilize computer - aided drafting, technical drawing, and
other design software to successfully confer with clients and project partnersInterior Designer — Joann's Interior Design Company — Boston, MA — 7/2009 to 9/2013 • Provided quotes and secured contracts for residential interior design jobs ranging from modest to extravagant design themes and budgets • Regulated and stocked inventories of supplies,
materials, and equipment to avoid project delays • Ensured that building codes, plumbing, electricity, load - bearing walls and
other structural components were taken into consideration for every assignment • Supervised an average of six projects at a time and consulted with clients
on a weekly basis to determine preferences in lighting, furniture, color arrangements, and
other design factors
«Solid experience in build support engineering «Strong negotiation skills «Strong familiarity with
construction materials «Knowledgeable in contract management «Intensive knowledge
on circuits and
other electrical connections «Proficient in AutoCAD and CAD
• Demonstrated expertise in reading and interpreting blueprints and ensuring that all
construction work procedures are properly aligned to them • Hands -
on experience in performing
construction work according to specified building codes and state - specified procedures • Documented success in erecting structures and handling demolition work by following safety procedures • Qualified to mix concrete and cement in prescribed consistencies and pouring them in a safe and accurate manner • Skilled in leveling concrete and earth using trowels and shovels and
other construction tools • Highly skilled in operating jackhammers and drills to break up concrete and pavement and place, consolidate and protect case - in - place masonry structures • Proficient in cleaning and preparing
construction sites by removing debris and hazardous
materials and ensuring that constructional
materials are properly loaded and unloaded from delivery trucks • Competent in controlling passing traffic by erecting traffic cones and signaling vehicles toward diverted routes • Proven ability to perform physically taxing work such as digging ditches and trenches using shovels and picks • Demonstrated ability to operate pneumatic hammers, vibrators and tampers to provide logistical assistance with
construction projects • Proven record of carefully demolishing structures by using allowed explosives in a safe manner
PROFESSIONAL EXPERIENCE May 2005 — Present AAA
Construction Services — Oshawa, ON General Labourer • Load and unload building materials and move materials towards working areas • Level earth using rakes and shovels • Remove debris and trash at construction sites through wheelbarrows and other equipment • Clean up spills • Manage traffic near construction sites • Erect concrete forms, scaffolding and ramps • Mix, pour and extend concrete and asphalt • Help in drilling and bl
Construction Services — Oshawa,
ON General Labourer • Load and unload building
materials and move
materials towards working areas • Level earth using rakes and shovels • Remove debris and trash at
construction sites through wheelbarrows and other equipment • Clean up spills • Manage traffic near construction sites • Erect concrete forms, scaffolding and ramps • Mix, pour and extend concrete and asphalt • Help in drilling and bl
construction sites through wheelbarrows and
other equipment • Clean up spills • Manage traffic near
construction sites • Erect concrete forms, scaffolding and ramps • Mix, pour and extend concrete and asphalt • Help in drilling and bl
construction sites • Erect concrete forms, scaffolding and ramps • Mix, pour and extend concrete and asphalt • Help in drilling and blasting tasks
ASPEN CONSTRUCTORS, Tucson, AZ Carpenter, March 2008 — May 2013 • Cut wood and
other construction materials with help of modern tools based
on blueprint specifications • Interpreted design layouts and worked
on the project accordingly • Maintained a neat, clean and safe work area • Carried out
material inspections for quality assurance and
material durability • Stored all manual and electric tools in a clean and safe manner • Performed window and door installation, repair and fixing work in buildings working with wood, glass, plastics and fiber - glass
Professional Profile Utilize technology and tools to drive the machine assembly process, ensuring accurate and safe operation as well as monitoring output for any identifiable issues or errors Lead through example with consistent work ethic, attitude, and professionalism, while performing related job requirements and supporting all production management and execution functions Develop and maintain a strong working knowledge of products,
materials, production techniques, equipment maintenance and use, and
other relevant industry knowledge and trends Perform regular process assessments to identify areas of concern while facilitating an effective and timely solution through collaboration with production line management Apply technical knowledge and education to all production functions, focusing
on the accurate and efficient completion of all assigned jobs Organize and execute machine production process from job receipt to completion, while collaborating effectively with
other staff,
material personnel and company management to align production processes with customer requirements Interact in a professional and effective manner with
other staff Provide complete support to
other construction personnel and management with technical assistance, guidance and successful team - oriented site operations Adhere strictly to all stated guidelines, safety policies, production quality benchmarks and
other applicable codes Participate extensively in all continuing education and advanced technical training opportunities to improve skill set and add value to company production process Address management and staff queries and resolve them in an expedited manner
Professional Experience Merrick Contracting Service (Glendora, CA) 1998 — Present Owner / Operator • Managed daily operation of commercial and residential
construction company • Constructed custom homes and completed varied subcontract work • Directed
construction crew of eight individuals ensuring timely project completion • Established project budgets, timelines, and necessary equipment and
materials list • Oversaw compliance with all applicable zoning laws and building regulations • Responsible for sales, marketing, accounting, and human resources • Hired, trained, managed, and reviewed company personnel • Set company policies including
on - site safety procedures and requirements • Delivered excellent customer service ensuring client satisfaction and repeat business • Generated significant business through networking, sales presentations, and
other tactics • Built a reputation for honest, professional, and timely service
Professional Profile Utilize technology to drive the
construction and renovation process, including both diagnostic and
construction tools, equipment, and various media such as tile, drywall, wood, brick, flooring, wiring, plumbing, and fixtures Perform needs - based technical assessments to identify areas of concern while facilitating an effective and timely solution to any
construction issues Apply technical knowledge and education to installation, maintenance, and repair tasks, focusing
on the accurate and efficient completion of all assigned jobs Maintain a strong working knowledge of products,
materials,
construction techniques, equipment maintenance and use, and
other relevant industry knowledge and trends Organize and manage
construction and renovation process from initial consultation to job completion, while collaborating effectively with
other staff,
material and equipment vendors, and firm management Interact in a professional and effective manner with customers utilizing polished introduction and explanatory skills, providing complete and accurate issue descriptions Provide complete support to
other construction personnel and management with technical assistance, guidance, and successful collaboration Lead through example with consistent work ethic, attitude, and professionalism, while performing all
construction and design tasks, supporting all project management and execution tasks, and facilitating high - quality relationships with vendors, customers, and
other interested parties Participate extensively in all continuing education and advanced technical training opportunities Address customer and staff queries and resolve them in an expedited manner Act as a liaison between clients, vendors, suppliers,
construction team members, and management staff members
is that I only invested my own physical cash to the tune of ~ $ 25K (the
other 15K was purchasing
construction materials on a 0 % interest CC which I'll pay back before the 12 month intro period).
Additional Bedroom \ Separate Bdrm Exit, Amenities \ Fireplace \ No Fireplace, Amenities \ Laundry \ Dryer Included, Amenities \ Laundry \ Inside Laundry, Amenities \ Laundry \ Washer Included, Amenities \ Pool - Private \ No Pool, Approx SqFt Range \ 1, Approx SqFt Range \ 201 - 1, Approx SqFt Range \ 400, Architecture Style: Spanish, Balcony, Bedrooms \ Additional Bedroom \ Separate Bdrm Exit, Bedrooms \ Master Bathroom \ Double Sinks, Bedrooms \ Master Bathroom \ Full Bth Master Bdrm, Bedrooms \ Master Bathroom \ Private Toilet Room, Bedrooms \ Master Bed Size \ Queen, Cable TV Ready, Cable included in rent, Community Features \ Property Description \ North / South Exposure,
Construction \ Frame - Wood, Cooling System: Refrigeration Cooling, Deposit Breakdown: Pets \ Call, Dining Area \ Dining in LR \ GR, Dwelling Styles \ Detached, Electricity included in rent, Elementary School: Desert Cove Elementary School, Exterior Features \ Pvt Yrd (s) \ Crtyrd (s), Exterior Stories \ 1, Exterior Type: Stucco, Features \ No Interior Steps, Fencing \ Block, Fireplace \ No Fireplace, Forms Required \ AAR Lease, Forms Required \ Credit Report
Other, Fully Refundable Dep \ Security Deposit, Garbage included in rent, HOA \ Rental Info: HOA Paid By \ Landlord, HOA \ Rental Info: HOA Y / N \ Y, Heating system: Electric Heat, High School: Shadow Mountain High School, Internet included in rent, Kitchen Features \ Pantry, Landscaping \ Grass Front, Landscaping \ Yrd Wtring Sys Back, Landscaping \ Yrd Wtring Sys Front, Laundry \ Dryer Included, Laundry \ Inside Laundry, Laundry \ Washer Included, Lease Information \ Management - Owner, Lease Information \ Monthly, Lease Information \ No Smoking Allowed, Lot \ Source Apx Lot SqFt \ County Assessor, MLS Listing ID: 5657252, MLS Name: ARMLS ZDD (ARMLS ZDD), Master Bathroom \ Double Sinks, Master Bathroom \ Full Bth Master Bdrm, Master Bathroom \ Private Toilet Room, Master Bed Size \ Queen,
Materials \
Construction \ Frame - Wood, Microwave Oven, Middle School: Shea Middle School, Non-Refundable Dep \ Cleaning Deposit,
Other Building Features \ Features \ No Interior Steps,
Other Building Features \ Plumbing \ Electric Hot Wtr Htr,
Other Building Features \ Unit Style \ All
on One Level,
Other Building Features \ Window Coverings \ Blinds,
Other Building Features \ Windows \ Dual Pane,
Other Building Features \ Windows \ Sunscreen (s),
Other Exterior Features \ Exterior Features \ Pvt Yrd (s) / Crtyrd (s),
Other Exterior Features \ Fencing \ Block,
Other Exterior Features \ Landscaping \ Grass Front,
Other Exterior Features \ Landscaping \ Yrd Wtring Sys Back,
Other Exterior Features \ Landscaping \ Yrd Wtring Sys Front,
Other Rooms \ Dining Area \ Dining in LR / GR,
Other Rooms \ Great Room,
Other Rooms \ Kitchen Features \ Pantry,
Other Rooms \
Other Rooms \ Great Room,
Other \ Deposit Breakdown: Pets \ Call,
Other \ Forms Required \ AAR Lease,
Other \ Forms Required \ Credit Report
Other,
Other \ Fully Refundable Dep \ Security Deposit,
Other \ Lease Information \ Management - Owner,
Other \ Lease Information \ Monthly,
Other \ Lease Information \ No Smoking Allowed,
Other \ Non-Refundable Dep \ Cleaning Deposit,
Other \ Possession (Rentals) \ Refer to Date Availb,
Other \ Prtl Refundable Dep \ Pet Deposit,
Other \ Rent Includes \ Dishes,
Other \ Rent Includes \ Gardening Service,
Other \ Rent Includes \ Linen,
Other \ Rent Includes \ Pest Control Svc,
Other \ Rent Payable \ Owner,
Other \ Services \ City Services,
Other \ Source of SqFt \ County Assessor, Plumbing \ Electric Hot Wtr Htr, Pool - Private \ No Pool, Pool \ None, Possession (Rentals) \ Refer to Date Availb, Property Description \ North \ South Exposure, Prtl Refundable Dep \ Pet Deposit, Rent Includes \ Dishes, Rent Includes \ Gardening Service, Rent Includes \ Linen, Rent Includes \ Pest Control Svc, Rent Payable \ Owner, Rental Info: HOA Paid By \ Landlord, Rental Info: HOA Y \ N \ Y, Roof Type:
Other, School District: Paradise Valley Unified District (069), Services \ City Services, Sewage included in rent, Sewer \ Sewer - Public, Size \ Approx SqFt Range \ 1, Size \ Approx SqFt Range \ 201 - 1, Size \ Approx SqFt Range \ 400, Size \ Exterior Stories \ 1, Source Apx Lot SqFt \ County Assessor, Source of SqFt \ County Assessor, Spa - Private \ None, Tax Municipality \ Phoenix, Taxes \ Tax Municipality \ Phoenix, Type and Style \ Dwelling Styles \ Detached, Unit Style \ All
on One Level, Utilities \ APS, Utilities \ Sewer \ Sewer - Public, Utilities \ Utilities \ APS, Water \ City Water, Water \ Water \ City Water, Water included in rent, Window Coverings \ Blinds, Windows \ Dual Pane, Windows \ Sunscreen (s)
Amenities \ Activity Room, Amenities \ Amenities \ Activity Room, Amenities \ Amenities \ Community Pool, Amenities \ Amenities \ Exercise Room, Amenities \ Amenities \ Kitchen Facilities, Amenities \ Amenities \ Management
On Site, Amenities \ Community Pool, Amenities \ Exercise Room, Amenities \ Kitchen Facilities, Amenities \ Management
On Site, Appliances \ Equipment Appliances \ Electric Water Heater, Approval Information \ 3 - 4 Weeks Approval, Balcony, Cable TV Ready,
Construction Type \ CBS
Construction, Cooling System: Electric Air Conditioning, Dates \
Construction Type \ CBS
Construction, Design \ First Floor Entry, Design \ High Rise, Equipment Appliances \ Electric Water Heater, For Sale YN \ 0, Front Exposure \ North, Furnished Info List \ Unfurnished, Heating: Electric, Housing Older Persons Act \ No HOPA, Interior Features \ Fire Sprinklers, Interior Features \ First Floor Entry, Laundry: In Unit, Lease Term Info \ 1 Year With Renewal Option, Listing Type \ Exclusive Agency, MLS Listing ID: A10419414, MLS Name: MiamiMLS ZDD (MiamiMLS ZDD),
Materials \ Roof Description \
Other Roof, Microwave Oven,
Other Building Features \ Furnished Info List \ Unfurnished,
Other Building Features \ Lease Term Info \ 1 Year With Renewal Option,
Other Building Features \ Pets Allowed YN \ 0,
Other Building Features \ Rent Period \ Year,
Other Building Features \ Rental Deposit Includes \ First Month's Rent,
Other Building Features \ Rental Deposit Includes \ Last Month's Rent,
Other Building Features \ Rental Deposit Includes \ Security Deposit,
Other Building Features \ Rental Payment Includes \ Exterminator,
Other Building Features \ Rental Payment Includes \ Waste,
Other Building Features \ Rental Payment Includes \ Water / Sewer,
Other Building Features \ Rental Payment Includes \ Yard Maintenance,
Other Interior Features \ Interior Features \ Fire Sprinklers,
Other Interior Features \ Interior Features \ First Floor Entry,
Other Interior Features \ Windows Treatment \ Verticals,
Other \ Approval Information \ 3 - 4 Weeks Approval,
Other \ Section \ 35,
Other \ Status \ Active, Parking Description \ 1 Space, Parking Description \ Assigned Parking, Parking Description \ Valet Parking, Parking Restrictions \ No Rv \ Boats, Parking Restrictions \ No Trucks \ Trailers, Pets Allowed YN \ 0, Property Type \ Residential Rental, Rent Period \ Year, Rental Deposit Includes \ First Month's Rent, Rental Deposit Includes \ Last Month's Rent, Rental Deposit Includes \ Security Deposit, Rental Payment Includes \ Exterminator, Rental Payment Includes \ Waste, Rental Payment Includes \ Water \ Sewer, Rental Payment Includes \ Yard Maintenance, Roof Description \
Other Roof, Safety \ Security Information \ Lobby Attended, Section \ 35, Security Information \ Lobby Attended, Senior Living \ Housing Older Persons Act \ No HOPA, Sewer Description \ Sewer, Status \ Active, Type and Style \ Design \ First Floor Entry, Type and Style \ Design \ High Rise, Type and Style \ For Sale YN \ 0, Type and Style \ Listing Type \ Exclusive Agency, Type and Style \ Property Type \ Residential Rental, Utilities \ Sewer Description \ Sewer, View Type \ Front Exposure \ North, Water Access \ Deeded Beach Access, Water Description \ Municipal Water, Water \ Water Access \ Deeded Beach Access, Water \ Water Description \ Municipal Water, Windows Treatment \ Verticals
Accessibility Features \ None, Architecture Style: Colonial, Bathrooms Full \ 1, Bathrooms Half \ 0, Bathrooms \ Bathrooms Full \ 1, Bathrooms \ Bathrooms Half \ 0,
Construction Materials \ Brick, Cooling YN \ Y, Heating YN \ Y, Heating and Cooling \ Cooling YN \ Y, Heating and Cooling \ Heating YN \ Y, Heating system: Radiator, Interior Features \ Kitchen - Galley, MLS Listing ID: 1004109745, MLS Name: Bright MLS ZDD (Bright MLS ZDD),
Materials \
Construction Materials \ Brick,
Other Interior Features \ Interior Features \ Kitchen - Galley, Patio \ Structure Type \ Townhouse / Rowhouse, Pool \ No Pool, Property Type \ Residential Lease, School District: Baltimore City Public Schools, Standard Status \ Active, Structure Type \ Townhouse \ Rowhouse, Type and Style \ Property Type \ Residential Lease, Type of Parking \
On Street