According to the town engineer, it
would cost about $ 750,000 to mothball the building, including making the heating
system operational to prevent damage to finishes and utilities already installed, draining water and blowing out the plumbing
system to prevent broken pipes, completing the exterior finish to maintain the waterproofing already
in place and finishing the roof.