Sentences with phrase «original build budget»

Not exact matches

The amendment also backtracks, in two notable ways, from Cuomo's original 2014 - 15 budget proposal to extend the 2011 state Infrastructure Investment Act, which allows more use of «design build» method on public projects:
John Harmon, assets strategy manager at Warwickshire County Council said: «With the original budget, we were looking at extending and altering the current building, but analysis showed it wouldn't be suitable for conversion into a 21st century school premises — a refurbishment option would have meant a poor learning space and the running costs would have been high.
ClaaS is designed to help schools: · Maximise their budget with savings that can amount to as much as 40 percent when compared to an outright purchase · Release capital from their existing IT assets to help finance their new ClaaS subscription · Receive ongoing servicing, training and maintenance which is covered by the agreement, ensuring schools and teachers get the most from technology · Add more equipment and services as and when required · Potentially include other equipment and services such as; tablets, PCs, printers and Wi - Fi from other best of breed suppliers · Build in a regular refresh to ensure they always have the latest learning technology · Be flexible: choose a convenient term length (for example: 3, 4 or 5 years) with the ability to renew the contract, negotiate a new contract or end the contract at the end of the original term Jane Ashworth, UK Managing Director, SMART Technologies commented: «We are thrilled to announce Crystalised as our third distributor in the UK, effective October 1st.
The budget was ballooning to close to twice the original $ 1 billion, so the new proposal is to have industry add carbon - capturing systems paid for by taxpayers to planned commercial plants built by industry.
Fermanagh Budget: Not disclosed Enerphit certification: Pending with the Passive House Academy SPACE HEATING DEMAND: Before: Not available (no energy calculations done on original building).
These two phones are also the first budget Samsung phones with metal in their construction, and a quick first glance at their features list would make you think the new devices will build on the popularity of the original J5 and J7.
The company has revealed that the original Galaxy J2 is its best - selling budget smartphone (and the Galaxy J series its best - selling lineup), and the new J2 builds on that popularity with improved specifications across the board and a couple of exclusive software features.
• Installed, configured, and managed multiple web sites supporting global e-commerce and e-business credit in technical environments comprised of Solaris 8 - 10 (LDOMS, ZFS, RAID, ZONES, CONTAINERS), Aix 6.1 - 7.1, Linux 4.0 - 5.5, Web Sphere MQ, Apache, Jboss, ATG, DB2, Oracle, MySQL and VMware • Optimized data security through close cooperation between Network Administration, Unix System Administration, NT Administration, DBA, and Backup and Recovery Administration teams • Installed Emulex LPFc, EMC Power path, Navisphere, Veritas Volume Manager, Veritas cluster server, Veritas File system, Veritas Net Backup etc. and archived original configuration • Utilized expertise in managing and performance tuning major RDBMS Oracle / Sybase / SQL / Informix / DB2 / ATG / SAP • Built and configured IBM, HP and Sun servers, EMC, TSM and Sun SAN • Architected Disaster Recovery System, conducted testing, observed fail errors, and reset the systems • Compiled opensource applications and packages as necessary for the source of both Solaris and RPM packages • Installed and configured Nagios, Cacti and MRTG graphing tool to monitor and visualize servers and network devices • Managed Send Mail, SFTP, FTP, HTTP, SSL, SSH, DHCP, DNS, NIS, NIS +, DHCP, LDAP, Apache, Tomcat, Web Sphere, BMC Patrol, HP Open View, and Nagios • Coordinated efforts among Development, QA, Production, DR, Systems, DBA, Production, Support, Network Administration, and Applications groups for project completion ahead of schedule and under budget • Planned and developed projects, performed user acceptance tests, and applied patches to fix bugs • Served as liaison with vendors multiple vendors including Cisco, EMC, HP, IBM, Red Hat Linux, Oracle, Sun, and Symantec resolving hardware and software issues in a timely and professional manner
In terms of budget, we're about $ 25,000 over our original estimate, but we're also building about 700 square more than we had anticipated.
At our $ 67 per square foot building cost (based on current estimates), we'd actually be under budget if we had stuck with building our original floor plan.
a b c d e f g h i j k l m n o p q r s t u v w x y z