The liver detoxifies the blood, secretes bile and excretes bilirubin and
other waste materials made elsewhere in the body.
Not exact matches
They are also
made with less packaging
material than virtually any
other comparable container, so there is less
waste from the outset.
Some of the new nuclear science research programs, including the one at MIT, are studying new reactor designs and fuel cycles that scientists (and policy - makers) hope will
make nuclear plants safer and cheaper to operate, and produce
waste materials with smaller volume, shorter half - lives, and less appeal to terrorists and
other would - be nuclear powers.
Work by Lloyd's team and
others has highlighted various ways bacteria can process
waste products that
make it less likely hazardous
material will seep into the environment.
Improving catalysts can allow fuels and
other materials to be
made with less energy and less
waste.
Made from a carved amalgam of plaster and the
material waste from
other sculptures under construction at the time of their
making, they also function as a chaotic, chthonic index of Vieira's manufacturing process.
Made from cork that originates as the
waste material from the bottle stopper industry, Cortiça showcases cork's tremendous potential to perform in ways unlike any
other material.
When
other options exist, does it
make environmental sense to transform the energy required to build a car into little more than
waste plus some recycled
material?
Burning the plutonium and
other long - lived
material reduces the required isolation time for the remaining
waste,
making it easier and less costly to isolate.
Therefore, NASA and the National Additive Manufacturing Innovation Institute, known as America
Makes, came up with a novel idea: a 3 - D printed habitat that can employ indigenous
materials and
other spacecraft
materials that might otherwise go to
waste.
And even white crosswalks, and all
other pavement markings, are a negligent
waste of time if
made of cheap
materials that can not do a proper job at all times.
Midwest Steel Blanking (Lombard, IL) 07/2004 — 08/2008 Director of Operations • Oversaw daily operations and management of 40 employees including 2 project managers • Served as an advisor to the President on all critical and strategic issues • Led presentations to banks, governmental agencies, potential investors, and large volume customers • Oversaw production, maintenance, quality control, and all
other dealings with all outside vendors • Negotiated all insurance policies and contracts concerning account receivables and insurance related claims • Developed the ISO 9000 quality manual and OSHA safety awareness programs, training, and documentation • Trained future managers of the company in professional skills, managerial decision
making, and business communications • Designed and implemented a new inventory control systems for managing raw -
material and finished - goods • Ensured cost control limiting the direct expenses incurred and indirect impacts such as inefficiencies, downtime, and
waste • Over a 3 year period, reduced the account receivables insurance premium from $ 55K to $ 13K / year • Renegotiated all
other insurance contracts for better coverage and reduced premiums by 20 % • Reduced «outside parts manufacturing» cost by 50 % • Maintained the cost of all supplies at the 2004 levels • Instituted production reporting and operational data analyses for decision
making • Reduced down time by 60 %, overall operation's cost by 4.5 %, and scrap generation by 3 % • Developed ISO 9001 quality manuals and handled external annual audits • Introduced safety procedures and training programs