The credits are derived from the avoided cost of fossil fuel during
peak generation hours measured from July 2014 to June 2015.
Previously, solar power plants had depended on back up energy plants powered by carbon emitting fuels because a solar system's
peak generation hours do not coincide with the utility's peak load hours after 5 p.m. Low sunlight meant low energy generation, and this challenge scaled back the environmental benefits of solar plants.
Not exact matches
By harnessing energy from the sun — «this handy fusion reactor in the sky,» he called it last night — getting enough renewable energy on the power grid and smoothing out energy
generation and use between
peak and off -
peak hours, the nation and planet can shift away from fossil fuels» dominance as a power source, he told the crowd.
They are popular during the
peak electricity demand
hours of between 4 pm and 8 pm (when carbon emissions due to
generation on UK National Grid are highest), but watching is particularly popular in the late
hours before bedtime.
This has knocked about 171 megawatts of power
generation from the grid and is projected to cause at least six
hours of daily load shedding during the monsoon season — Nepal's
peak power producing period.
This tariff incentivises
generation during
peak demand
hours and will allow the plant to capitalise on the dispatchable energy that CSP technology can offer to the grid.»
«Microgrids have several advantages for the electricity grid; for example, they can provide electricity during
peak - usage
hours and therefore forestall the need for expensive upgrades in central
generation, transmission, and distribution systems.
Naturally, the solar
generation has the potential to shave off
peak energy consumption in the heat of the day, but it can also be pushed through into high - demand evening
hours and can last through cloudy periods.
Floated last year as a fix to the state RPS, the Arizona Clean
Peak Standard would mandate that a certain amount of renewable generation be delivered during peak demand hours — likely necessitating the addition of stor
Peak Standard would mandate that a certain amount of renewable
generation be delivered during
peak demand hours — likely necessitating the addition of stor
peak demand
hours — likely necessitating the addition of storage.
«An aggregated fleet of vehicles or chargers can act as a [demand response] resource, shifting load in response to price signals or operational needs; for example, vehicle charging could be shifted to the middle of the day to absorb high levels of solar
generation and shifted away from evening
hours when solar
generation disappears and system net load
peaks.»
For the 2020 Medium scenario the countries studied showed an average annual wind capacity factor of 23 — 25 %, rising to 30 — 40 %, when considering power production during the 100 highest
peak load situations — in almost all the cases studied, it was found that wind
generation produces more than average during
peak load
hours.