Not exact matches
Vector was able to replace the need for expensive and time consuming conventional upgrades to its substation
by installing a 1MW / 2.3 MWh Powerpack system, which is purposed to reduce grid
load during high
peak times.
By keeping cash in reserve, you should counterintuitively
load up on stocks right at the times of
peak selling.
Last year, when
load - shedding reached its
peak over a three - year period, the economy recorded its lowest growth in 15 years: expanding
by 3.9 percent mainly, on due to a slump in commodities prices and energy supply deficit, which affected the manufacturing, industries and services sectors... the biggest contributors to the country's GDP.
In the report, IEA says it expects concentrated solar power to become competitive for
peak and mid-
peak loads by 2020 in the sunniest places.
In the second pull phase,
peak hip, knee and ankle joint angular velocities are around 420 — 470, 280 — 400, and 210 — 370 degrees / s, respectively (Gourgoulis et al. 2002; 2009; Akkuş, 2012; Harbili, 2012; Harbili & Alptekin, 2014) and are not affected
by the
load used (Harbili & Alptekin, 2014) or whether the lift was successful (Gourgoulis et al. 2009).
However, Ho et al. (2011) did not find any effect of
load on
peak barbell velocity across 133 attempts
by a single weightlifter.
The
load at which
peak power is achieved differs
by exercise variation and is greatest with the heaviest
loads in the power clean, moderate - to - heavy
loads in the hang power clean and push press, moderate - to - light
loads in the high pull, hang high pull and mid-thigh pull, and light
loads in the jump shrug.
Only
peak hip extension angular velocity is affected
by load, being faster with greater weight (Harbili & Alptekin, 2014).
However, increases in muscle fascicle length are also likely dependent on the mechanical
load incurred
by the prime mover, as knee flexion (hamstring only) exercise seems to lead to greater adaptations in the hamstrings than hip extension (hamstring, gluteus maximus, and adductor magnus) exercise, even when muscle length at
peak contraction is shorter (Bourne et al. 2016).
Peak GRF is routinely always greatest with the heaviest load (80 — 90 % of 1RM), while peak power output is usually highest at a slightly lower load than the maximal load tested (65 — 80 % of 1RM), and RFD is not generally affected by load to any great ext
Peak GRF is routinely always greatest with the heaviest
load (80 — 90 % of 1RM), while
peak power output is usually highest at a slightly lower load than the maximal load tested (65 — 80 % of 1RM), and RFD is not generally affected by load to any great ext
peak power output is usually highest at a slightly lower
load than the maximal
load tested (65 — 80 % of 1RM), and RFD is not generally affected
by load to any great extent.
In contrast, they found no difference in
peak bar velocity at all
loads except 75 % of 1RM when comparing the bench press throw immediately preceded
by a fast eccentric muscle action and the concentric - only muscle action condition.
They found that the straight - leg lift displayed the greatest
peak hip extension moment (124Nm), followed
by the bent - leg lift with the
load far from the body (105Nm), and finally the bent - leg lift with the
load close to the body (88Nm).
Common - sense reforms to teacher pension systems, such as those discussed in Education Next
by Robert Costrell and Michael Podgursky (see «
Peaks, Cliffs, and Valleys,» features, Winter 2008), would have a similar effect of making the returns to teaching more front -
loaded.
The
load limiter functions
by permitting a small amount of controlled seatbelt slack shortly after the automatic tensioner is activated to limit the
peak restraining forces and thereby reducing the potential of serious injury.
Inspired
by our rich marine heritage, ACANA Wild Atlantic is brimming with wild - caught fish that mirror your cat's evolutionary diet.Our rich diversity of saltwater fish is delivered fresh and whole daily so they're
loaded with goodness to nourish
peak health without long lists of synthetic supplements and additives.Prepared in our Kentucky DogStar ® kitchens from America's best and freshest...
Since they were presumably going to operate as base
load as opposed to
peaker power, it's likely they were intending to sign long term contracts so that their incremental addition to the demand for coal would be absorbed not
by creating an additional demand on the spot market but
by identifying a fixed source with a standing order and putting a few American miners to work on a full - time basis.
In June I heard a report about a new EU - wide study done in the UK that showed clearly that
by combining all forms of renewables: wind all over Europe, solar in North Africa, hydo, hydro storage, solar thermal, and demand management, you could meet a slowly growing EU
load with almost no natural gas for
peaking plants to help level the
load.
Over the past several years, the
peak load (or the most electricity required at any point) has fallen
by between 2 and 3 percent.
Wind - generated electricity can not,
by its nature, replace or displace these «base
load» or «
peak load» generators.
This is particularly relevant for power systems where the
peak load is expected to increase at the same time as conventional power plants to be replaced
by intermittent renewable power generation.
Actual
peak reduction: The actual reduction in annual
peak load (measured in kilowatts) achieved
by customers that participate in a utility demand - side management (DSM) program.
Concentrated Solar Power (CSP) can be a night - only dispatchable (D - CSP) plant; with its entire solar energy absorbed
by day to be delivered after dark to cover the evening
peak load on the grid, according to a study funded
by the US Department of Energy (DOE).
Protect energy retailers from energy price
peaks by facilitating access to stored energy and interruptible
loads through automatically discharging energy or removing demand, to reduce costs during
peak price hours.
(Sec. 144) Requires: (1) each
load - serving entity or state to determine and publish
peak demand reduction goals for any
load - serving entity that has an applicable baseline in excess of 250 megawatts; (2) the Secretary to develop a system and rules for measurement and verification of demand reductions; (3) such goals to provide that such entities will reduce or mitigate
peak demand
by a minimum percentage amount from the applicable baseline to a lower
peak demand during 2012 and 2015; (4) such goals to provide that the minimum percentage reductions established as
peak demand reduction goals shall be the maximum reductions that are realistically achievable with an aggressive effort to deploy Smart Grid and
peak demand reduction technologies and methods; and (5) each
load - serving entity to prepare a
peak demand reduction plan that demonstrates its ability to meet applicable goals.
This is especially relevant for
peak - time air conditioning
load,
by far the greatest power consumer for most modern buildings.
Adding wind and solar photovoltaic capacity to the grid may require augmenting the amount of
peak -
load plants, which can be done relatively cheaply
by adding gas turbines, which can be fueled
by sustainably - produced biofuels or natural gas.
Modeling has also shown that it's relatively inexpensive to increase the reliability of the total wind output to a level equivalent to a coal - fired power station
by adding a few low - cost
peak -
load gas turbines that are opearated infrequently, to fill in the gaps when the wind farm production is low (Diesendorf 2010).
(B)
load - serving entities will reduce or mitigate
peak demand
by a minimum percentage greater amount from the applicable baseline to a lower
peak demand during calendar year 2015; and
(6) The term «
peak demand reduction plan» means a plan developed
by or for a
load - serving entity that it will implement to meet its
peak demand reduction goals.
--(1)
Peak demand reduction goals may be established for an individual load - serving entity, or, at the determination of a State, tribal, or regional entity, by that State, tribal, or regional entity for a larger region that shares a common system peak demand and for which peak demand reduction measures would offer regional bene
Peak demand reduction goals may be established for an individual
load - serving entity, or, at the determination of a State, tribal, or regional entity,
by that State, tribal, or regional entity for a larger region that shares a common system
peak demand and for which peak demand reduction measures would offer regional bene
peak demand and for which
peak demand reduction measures would offer regional bene
peak demand reduction measures would offer regional benefit.
Ohms law can not be ignored and this loses 18Gw
by heat on our
peak demand
load of 60Gw.
An economic model designed to predict consumer response to real - time pricing found that in the mid-Atlantic states,
peak load would be reduced
by 10 to 15 %.
The
load grew into the coal resources and offpeak prices were set
by gas units who» se price delta was not as big compared to the
peak value.
The Net
Load Peak Energy Bill would require the CPUC and the California Energy Commission (CEC) to work with CAISO to set up, by the end of 2019, «policies or procedures» through which LSEs meet «net peak load» energy and reliability needs «while minimizing the use of fossil fuels and utilizing low - carbon technologies and electrical grid management strategies.&ra
Load Peak Energy Bill would require the CPUC and the California Energy Commission (CEC) to work with CAISO to set up, by the end of 2019, «policies or procedures» through which LSEs meet «net peak load» energy and reliability needs «while minimizing the use of fossil fuels and utilizing low - carbon technologies and electrical grid management strategies.&ra
Peak Energy Bill would require the CPUC and the California Energy Commission (CEC) to work with CAISO to set up,
by the end of 2019, «policies or procedures» through which LSEs meet «net
peak load» energy and reliability needs «while minimizing the use of fossil fuels and utilizing low - carbon technologies and electrical grid management strategies.&ra
peak load» energy and reliability needs «while minimizing the use of fossil fuels and utilizing low - carbon technologies and electrical grid management strategies.&ra
load» energy and reliability needs «while minimizing the use of fossil fuels and utilizing low - carbon technologies and electrical grid management strategies.»
The bill offers the CPUC and the CEC the option of setting «targets or requirements for energy technology that minimizes the percent of
load met
by fossil fuels during net -
load peak energy demand and maximizes the use of low - carbon technologies.»
The CPUC would be required to increase the percentage of electricity output delivered
by clean resources
by 5 % in 2020 and
by 6 % «every third year thereafter until December 31, 2029, or until 40 % of demand during the
peak load time period is supplied
by clean
peak resources,» the bill reads.
Then there's «intermediate
load,» with the next - cheapest tier of power plants, and at the top of that second hump, «
peak load,» satisfied
by (usually natural gas) «
peaker plants» that are expensive to run but easy to ramp up and down quickly.
Previously, solar power plants had depended on back up energy plants powered
by carbon emitting fuels because a solar system's
peak generation hours do not coincide with the utility's
peak load hours after 5 p.m. Low sunlight meant low energy generation, and this challenge scaled back the environmental benefits of solar plants.
If electricity was dynamically priced, price fluctuations would be arbitraged
by those market participants who could shift their demand or supply at least cost; among other things, this would remove the need for expensive
peak -
load plants and make solar and wind energy much more practical.
While the need for nuclear power is absolutely critical in meeting our base
load requirements (and reducing CO2 emissions, and reducing fuel risk
by having a diversified generation portfolio of power plants)--
peaking load and generation options to meet this
load (which solar currently fits into) is important also.
Pumped - storage hydroelectric plant: A plant that usually generates electric energy during
peak load periods
by using water previously pumped into an elevated storage reservoir during off -
peak periods when excess generating capacity is available to do so.
The excess power or off -
peak power generated
by wind generators or solar arrays may then be used at a later time for
load balancing in the energy grid.
An approach being researched
by the content delivery network provider helps reduce the grid - connected
load during
peak demand periods, when electricity is most expensive.
«Only a system with its base -
load provided
by nuclear power, supplemented
by gas for
peak demand, and retaining the existing wind investment, can possibly supply the UK long - term with the huge amounts of secure and reliable, predominantly electrical energy, it needs.
After testing several options over four years, BGE decided to offer the
peak time rebate as its standard tariff for residential customers with smart meters, said Ruth Kiselewich, director of BGE's demand side management programs, during a presentation hosted by the Peak Load Management Associat
peak time rebate as its standard tariff for residential customers with smart meters, said Ruth Kiselewich, director of BGE's demand side management programs, during a presentation hosted
by the
Peak Load Management Associat
Peak Load Management Association.
Some storage would be helpful, especially pumped hydro, but when there are local UK wind shortfalls, in addition to all the usual backup available from the rest of the grid system, what about importing power via a super-grid, shifting demand
peaks by interactive
load management, and using biomass - fired backup?
A power outage affecting 11,000 customers in the Sydney suburbs of Burwood and Strathfield at around the time of
peak electricity demand (around 4 pm) was not caused
by load - shedding, but would have reduced power demand at a critical time.
As to
loading software into memory constituting a violation of copyright, see MAI Systems Corp v.
Peak Computer Inc (1993) 991 F. 2d 511 (defendant, who was not a licensee in relation to software, ran software and in doing so created copies of the software in memory; the person was purportedly authorised
by a licensee to do so, but the licensee did not have the right to so authorise the defendant).
Following the trajectory of cryptocurrency searches, page
loads to different cryptocurrency exchanges also
peaked in late December and declined drastically
by February.
«It also provides a complete profile of electric power consumption at these properties in terms of
loads by time of day, including
peak demand times.