This device could transform the world by showing us the way to
a pilot plant design for the generation of power from fusion energy for use by all,» said Stewart Prager, director, Princeton Plasma Physics Laboratory.
Not exact matches
LITHIUM Australia has advanced front - end engineering and
design studies on its SiLeach large - scale
pilot plant as it seeks to prove its SiLeach hydrometallurgical process can operate at a commercial scale.
The centre features test kitchens, sensory labs, production areas, culinary centre, oven technology lab, physical and analytical labs, areas for packaging and
design testing,
pilot plants and a Consumer Connect lab.
In the meals
pilot plant, recipes developed in the test kitchen are combined with packaging
designed in the lab.
A meals
pilot plant combines the recipes developed in the test kitchen with packaging
designed in the lab.
The building consists of a small and compact dairy
pilot plant, a wide range of laboratories, the Consumer House, the Customer Collaboration Lab and modern office facilities
designed to support creativity and cross-functional projects.
A
pilot manufacturing
plant at 24M's headquarters in Cambridge has produced thousands of test batteries to demonstrate the efficiency of the new
design.
Climeworks will use funding from the Swiss Federal Office of Energy to fine - tune the
plant's
design so it runs more cheaply and efficiently during the three - year
pilot period.
The compact
pilot plant used in the SOLETAIR project is
designed for decentralized production, fits into a shipping container, and can be extended modularly.
Alliance DCL will market the technologies and anticipates offering project - specific services, from feedstock characterization,
pilot plant evaluation, feasibility studies and engineering
design through
plant start - up and ongoing technical support.
And the best case is that we have our
pilot plant built by 2023, and that by 2030, this fourth - generation inherently safe
design with all sorts of nice characteristics, including cost, becomes the standard for all nuclear builds from that point forward.
DOE in its RFI called the modular
design the «power
plants of the future» and said it wants input on developing
pilot versions of such
plants that could be built by 2025.
She
designed, contracted and built
pilot plant and laboratory installations; developed justification for a $ 6M factory retrofit; saved $ 11M annually with just $ 2M investment and developed and implemented optimization improvements at ethylene
plants.