«We are losing 1.2 million barrels of oil per day, all the gas
pipelines powering the turbines are being blown up.
Not exact matches
The tunnel boring machine from Germany is being used to construct a 1.2 km
pipeline for sea water intake to be used as a cooling system for the Combined Cycle Gas
Turbine power plant.
Posters called for wind
turbines and solar
power, an end to the US - Canadian Keystone XL oil -
pipeline project, reduction of deforestation and meat - eating, and related causes.
Exemptions for bird - and bat - killing wind
turbines must no longer be permitted, and ESA rules must be applied with equal force to all projects, not just drilling, mining,
pipelines,
power plants, grazing, and timber cutting.