By 2012, the plants in three key countries - China, India, and the United States - are expected to emit as much as an extra 2.7 billion tons of carbon dioxide, according to a Monitor analysis of power -
plant construction data.
Not exact matches
Ong gathered
data from 72 % of the solar power
plants installed or under
construction in the United States.
The NSTTF's primary goal is to provide experimental engineering
data for the design,
construction, and operation of unique components and systems in proposed solar thermal
plants.
Nevertheless, based on the most optimistic future projections of nuclear power
construction times of 4 — 5 yr and those times based on historic
data, we assume future
construction times due to nuclear power
plants as 4 — 9 yr.
With Australia facing a policy crisis over energy security and the winding back of reliance on coal,
construction of new coal - fired power
plants was increasing in at least 35 countries, according to
data analysis supplied to the Nationals by the federal parliamentary library.