Sentences with phrase «plant supervisor at»

Fast forward to 1999 and we're introduced to Joe Brody (Bryan Cranston), a nuclear engineer and plant supervisor at the Janjira Nuclear Power Facility in Japan.

Not exact matches

«At another plant, I might have a general foreman, training supervisor, die - cut supervisor, and two lead men.
Jack Lemmon plays a shift supervisor at a nuclear power plant who narrowly averts a core meltdown while being surreptitiously filmed by Jane Fonda and Michael Douglas» visiting TV news crew.
In 1994, she met Felix, who worked as a supervisor at a local manufacturing plant.
«I would definitely say that the popularity of planted tanks has seen a growth within recent years,» said Sara Stevens, fish room supervisor at That Fish Place — That Pet Place.
Elisabeth Beaubien, Alberta Plantwatch Coordinator and a graduate student at the University of Alberta, and her supervisor, Andreas Hamann of the Department of Renewable Resources, worked with historical data from 1936 and more recent data from more than 650 volunteers of the group Alberta Plantwatch to find out how the warming winters have affected seven species of plants that grow in the central parklands of Alberta, Canada.
«I have a real concern about the speed at which the changes being implemented by the Clean Power Plan will affect my work location and my life,» wrote Ameren Missouri's John Cooper, a shift supervisor at the Meramec coal plant scheduled for shuttering in 2022.
«Although whites are not the primary targets of the alleged racial abuse at the Whirlpool plant in LaVergne, Tenn., they allege that they have been subjected to a hostile work environment where supervisors allowed racial epithets and offensive graffiti to run rampant.
If you are a seafarer, coal - mine supervisor or a chemical plant engineer, your life is considered at risk all the time and insurance companies hesitate to offer a plan to those buyers.
• Proficient in installing underground pipelines for water distribution and waste water collection systems • Well versed in operating power plant equipment under the direction of operational manager • Special talent for repairing, fitting and replacing water taps and valves on main and service lines • Particularly effective in using manual tools including chain saws, chippers and jackhammers • Expert in identifying and fixing pipeline leaks and pressure faults • Profound ability to setup sediment control devices as per directions of the supervisor • Track record of responding timely to customers» utility service calls • Proven skills in cutting, fitting and laying pipes • Well practiced in loading, unloading and driving trucks and other heavy machinery to the worksite safely • Fully capable of maintaining cleanliness and functionality of all tools and equipment • Proficient in inspecting and maintaining water storage tanks and cleaning the yard when necessary • Apt at enforcing proper safety practices and using appropriate PPE and traffic safety materials such as cones, arrow - boards and flagging signs around the worksite • Experienced in determining the locations of gas, telephone, power, water and sewer lines from appropriate sources before excavation • Particularly effective in repairing and replacing defective electricity and gas meters • Excellent manual dexterity and physical stamina along with profound ability to bend, stoop and work in confined spaces • Well versed in reconnecting water and power services after holidays • Proven skills in performing routine grounds keeping, painting, carpentry and plumbing tasks • Skilled in repairing replacing and existing pre-laid pipeline based underground water and gas distribution systems • Efficient in anticipating tools and equipment needed as per the nature of each assignment and loading the same in the company vehicle in a safe manner
Modern Industrial Controls / Haworth (Jonesboro, AR) 2002 — 2003 Maintenance Technologist • Performed heavy machinery installation and routine maintenance for contract clients • Worked with hydraulic presses, roll - formers, punches, applicators, saws, and routers • Completed turnkey installation of complex conveyor system at a computer plant • Collaborated with plant engineers and supervisors to maximize machine efficiency
a b c d e f g h i j k l m n o p q r s t u v w x y z