As a result of that gaping cavity, the NRC shut down Davis — Besse for two years (from 2002 to 2004) in an attempt to patch the nozzle that had been leaking boric acid as well as to address design flaws that had been in place since the plant started operation in 1977 and what the agency described as
a poor safety culture.