Consider to also handle more big
rain events & the methods provide higher yields, taking a view from Andean hydraulic engineering lasting centuries consider terracing everything in sight to
delay flow, introducing as much into groundwater recharge as
possible, these contours can be sited & sized to handle farm machinery, the walls porous.