Not exact matches
RENSSELAER — The first of 45 superloads - shipments of
generating equipment weighing as much as 1 million pounds - is expected to roll out of the Port of Rensselaer Tuesday night on its way south to a
power plant site in Dutchess County.
A
power inverter can make the conversion to AC, but a typical inverter with the required capabilities contains about 300 pounds of material: a computer to change the frequency of alternating current as motor speed changes, massive switches, and cooling
equipment to dissipate the heat
generated by the heavy current.
Steam
generating equipment is used by
power plants to convert heat into steam.
-- Coverage for
equipment breakdown is included within applicable limits — Diagnostic
equipment,
power -
generating equipment, and production
equipment are limited to $ 100,000 for direct damage — Limit may be increased — Service interruption of water, communication or
power supply services is covered from a covered breakdown (when business income and extra expense is covered)
Among the facilities provided for guests are free secure parking, complimentary uncapped Wi - Fi, a 24 - hour deli, a complimentary hotel shuttle service and a gym, which features innovative,
power -
generating gym
equipment.
When the new
equipment is in full operation, it produces 288 megawatts of electricity, in addition to the 309 megawatts of
power already being
generated by existing
equipment.
Renewable energy currently tends to have higher up - front costs than fossil fuel - based
power systems do, but in the long run
equipment depreciation is lower and the fuel (sunlight and wind) is free, thus any honest cost analysis over the lifetime of the
power -
generating equipment will conclude that solar is cheapest, wind second, nuclear third, and fossil fuels are unworkable in the long run due to the global warming issue.
Ramping that up significantly requires years of lead time to build factories &
equipment... I've never seen a study that didn't betray an obvious bias, but it doesn't seem unreasonable to think that the time & cost to do all this, and get say 100 GWatts of solar panels out there
generating power, is going to be much different from that needed to build 100 nuclear plants.
Ramping that up significantly requires years of lead time to build factories &
equipment... it doesn't seem unreasonable to think that the time & cost to do all this, and get say 100 GWatts of solar panels out there
generating power, is going to be much different from that needed to build 100 nuclear plants.»
Auxiliary generator: A generator at the electric plant site that provides
power for the operation of the electrical
generating equipment itself, including related demands such as plant lighting, during periods when the electric plant is not operating and
power is unavailable from the grid.
Uprate: An increase in available electric
generating unit
power capacity due to a system or
equipment modification.
If a new building or house is being constructed with a solar
power generating system, electricians may be responsible for installing the solar
power system along with the electrical wiring system, or they may be responsible for simply connecting the solar
equipment.
One of the challenges of constructing one will come from the varying time - spans that different types of
generating machinery operate and different types of electricity consuming
equipment need
power.
Electrical and electronics installers and repairers use electronic
power equipment to operate and control
generating plants, substations, and monitoring
equipment.
The
power -
generating equipment used with a solar dish can be mounted at the focal point of the dish, making it well suited for remote locations, or the energy may be collected from a number of installations and converted into electricity at a central point.
Subtitle C: Coal and Related Programs -(Sec. 431) Amends the Energy Policy Act of 1992 to direct the Secretary to implement a financial assistance program to facilitate production and generation of coal - based
power through the deployment of clean coal electric
generating equipment and processes that improve energy efficiency or environmental performance consistent with relevant federal and state clean air requirements.
In some ways it is quite generous, give that, if you can afford to install the
equipment then you will get money from your electricity supply company, even for the
power you consume yourself that you have
generated.
At the end of 2012, 64.3 % of the U.S. coal
generating capacity in the electric
power sector already had the appropriate environmental control
equipment to comply with the MATS and allow their operation past 2016.
To make up for short comings I'd have converted old
power stations to synchronous condensers (they would tie to the system and spin but would not
generate any
power), add
power electronic
equipment to provide pseudo support, and possibly install large flywheels.
Here are a few stores that sell the
equipment needed to
generate clean
power: the Alternative Energy Store, the Affordable Solar Store, Energy Alternatives ltd, Real Goods: Solar Living and this solar store that we so poetically described.
Vast in knowledge of installing, testing and maintaining of
equipment that
generates and operates on electric
power
Conducted maintenance operational checks and assisted in diagnostic and troubleshooting on hydraulic systems,
power generating units, and a variety or
powered and non
powered equipment.
Skills relevant to this position and found on sample resumes include overseeing the operation, maintenance and repair of plant
equipment and auxiliary systems; recommending changes in operational methods and procedures; diagnosing problems relating to
equipment malfunctions; and operating steam and electrical
generating turbines and / or generators to provide emergency electrical
power.
Adjusted controls on
equipment to
generate specified electrical
power.
Operated and controlled machinery that
generated electric
power, using control boards and semiautomatic
equipment.
Experienced and knowledgeable military trained
Power Generation Technician with a proven track record in providing installation and modification to electrical generating power production plants and equipment while driving quality and safety assur
Power Generation Technician with a proven track record in providing installation and modification to electrical
generating power production plants and equipment while driving quality and safety assur
power production plants and
equipment while driving quality and safety assurance.
Plant Shift Leader accomplished in supervising daily
power plan operations, including generators, gas and steam turbines, electrical switch gears and chilled water
generating and distributing
equipment.
My duties were to manage the mechanical maintenance of all
equipment associated with a 440 mega-watt scrubbed coal fired steam
generating power facility.
And, here's another startling statistic for you; gas
powered lawn
equipment produces roughly five percent of the air pollution
generated in America.