Sentences with phrase «power generation line»

Not exact matches

This chart shows the major sectors of the power - generation portfolio of the US in gigawatt hours generated annually: note the dynamic between coal (black line) and natural gas (red line).
The recap: the tech - centric automaker is expanding beyond electric vehicles and launching a line of battery products that will allow homeowners, businesses and utilities to store energy, manage backup power — and ultimately, enable zero - emission power generation.
Because without real, genuine penalties on the line, without generations of men fearing that if they abuse their power, if they treat women like s — t, they'll be out of jobs, shamed, their families devastated — without that actual, electric, dangerous possibility: Nothing.
With thousands of miles of transmission lines, gigawatts of generation, computers that route power, frequency regulators, and transformers that all serve the constantly fluctuating needs of millions of people, lots of things can go wrong.
One plan for shoring up power generation in New York City and the surrounding area is buried power lines through the Capital Region.
The nation's largest state - owned power corporation — which runs 16 generation facilities, including the Niagara Power Project, and owns more than 1,400 miles of transmission lines — is controlled by the Cuomo administrapower corporation — which runs 16 generation facilities, including the Niagara Power Project, and owns more than 1,400 miles of transmission lines — is controlled by the Cuomo administraPower Project, and owns more than 1,400 miles of transmission lines — is controlled by the Cuomo administration.
Last July, LIPA announced that an increased focus on solar power would «help defer, reduce or eliminate the need to invest hundreds of millions of dollars on building new generation, infrastructure, and transmission and distribution lines
Under the so - called «thunderstorm alert,» extra power - generation facilities are turned on to reduce the power flowing long distances on the state's transmission lines.
That would be in line with conventional power generation costs of today and might make it more economically attractive.
While electricity lines west and east of the Rockies are tied together as two synchronized generation systems, their power plants humming in close unison, two - thirds of Texas stands by itself.
Next in line for the 991 - generation car are a lightweight 911 Clubsport, the 911 Turbo and Turbo S, a 911 GT3 complete with PDK transmission, and a GT2 RS powered by a quad - turbo flat - six.
The hierarchy of the first Audi R8 generation was simple in its division; the entry - level engine was a 420 - hp naturally aspirated V - 8 engine, with the top - of - the - line R8 powered by a 525 - or 542 - hp 5.2 - liter V - 10 engine (V10 versus V10 plus).
Much as with the Convertible, it's the 552bhp 4.4 - litre twin - turbo V8 that takes centre stage, pulling off the impressive trick, for a blown motor, of seamlessly melding masses of low and mid range urge (500 lb ft of torque from just 1500rpm) with an equally fierce rush to the 7200rpm red line while managing to use 30 per cent less petrol than the V10 that powered the previous generation M6.
For instance, Toyota's line of hybrid models has expanded from the first - generation Prius, a pipsqueak that arrived in the United States in 2001 with a 70 - horsepower gasoline engine and a 44 - horsepower electric motor, to include larger vehicles such as the Highlander, a hybrid utility wagon with a total of 268 horsepower from its gas and electric power plants.
The current - generation BMW 7 Series is powered by a host of engine options, none bigger than the 6.0 - liter V - 12 on the top - of - the - line 760i.
The fourth - generation Sportage is fitted with a new rack - mounted electric motor - driven power steering system (R - MDPS), available as standard on GT Line and optional for all Sportage models across Europe.
It has 19bhp more power than the turbocharged 3.0 - litre in - line six - cylinder unit used by the latest BMW 730Ld and 71hp more than the turbocharged 3.0 - litre V6 engine in the fourth - generation Audi A8 3.0 TDI.
Introduced in 2001 as a third generation update of Lexus's high - performance midsize GS line, the Lexus GS430 was powered by a 4.3 - liter V - 8 with 300 horsepower.
As the third - generation X3, the SUV is now using BMW's modular CLAR platform, and has a bit more power across the model line.
The new Civic Type R, sharing the body style of the 5 - door hatchback variant of the tenth - generation global Honda Civic platform, will be powered by a U.S. - built 2.0 - liter DOHC, direct - injected and turbocharged i - VTEC in - line 4 - cylinder engine with peak ratings of 306 horsepower at 6,500 rpm and 295 lb. - ft.
Replacing the highly - regarded LS 430, the fourth - generation of the flagship LS luxury sedan line embodies the kind of innovative features, impeccable build quality and attention to detail that established Lexus as a preeminent power in the premium vehicle segment from the very beginning.
The added gears offer better fuel economy, a harder punch off the line, and greater passing power on the 4th generation RX.
«While there was a 1.8 TFSI engine in the former Audi TT line - up, the new 2.0 TFSI engine brought both power and efficiency gains when it arrived in the all - new third - generation TT,» Goult was quoted saying in a press release issued today.
The E-Class line - up will be powered by the new generation of three and four cylinder engines and very likely, the next E-Class will mark the return to the famous six - inline cylinder engines, which will replace the current V6s.
The new BMW 7 Series model range will be powered by engines including a six - cylinder in - line variant from the BMW Group's latest generation of power units.
Six - cylinder in - line engine from the new generation of power units.
The fourth generation of the flagship LS luxury sedan line embodies the kind of innovative features, impeccable build quality and attention to detail that have helped established Lexus as a preeminent power in the premium vehicle segment.
The third - generation CLS features new engines, with the choice of in - line six - or four - cylinders, which can be either diesel or gas powered.
The first generation of Rolls - Royce motor cars consisted of the two cylinder R - R 10 H.P., the three cylinder R - R 15 H.P., the four cylinder R - R 20 H.P. and the six cylinder R - R 30 H.P. all of which were powered by in - line engines and sported the radiator of classic Grecian shape.
The line - topping Insight Touring adds 17 - inch alloy wheels, LED fog lights, rain - sensing wipers, a power moonroof, LED side - mirror turn signals, perforated leather seating, heated front seats with 8 - way power adjustment for the driver and 4 - way power for the passenger, dual - zone climate control, embedded Honda Satellite - Linked Navigation System ™, Honda HD Digital Traffic, 4G LTE Wi - Fi with mobile hotspot capability and Wi - Fi - enabled over-the-air system updates, next - generation HondaLink ® subscription services, a 10 - speaker premium audio system, and HomeLink ® Remote System.
0.1.3 parallel evolution routine affecting the random numbers generation stream contour line = locate the streamline of local maximums inside the scanned hardware current flow points to matrix, automatic routine virtual frequency parameter inline with triple of the interruption frequency for random number request, on idle sustaining the previous frequency divided by the power of lowest amplitude (that of the tangent point (touching point of the actual scan) of the streamline nearest to the component location inside the matrix)
0.1.2 parallel evolution routine affecting the random numbers generation upon adjusting the cooling power along the stream contour line by one unit toward the power maximums of 999 units — if touched then set the power at the middle of the coverage band and rescale units by transposition of the position inside the coverage band, automatic routine virtual frequency parameter inline with twice of the interruption frequency for random number request, on idle sustaining the previous frequency divided by the power of lowest amplitude (that of the tangent point (touching point of the actual scan) of the streamline nearest to the component location inside the matrix)
0.1.4 parallel evolution routine affecting the random numbers generation upon adjusting the current - balance protection along the stream contour line by one unit toward the power minimums of 666 units — if touched then set the power at the middle of the coverage band and rescale units by transposition of the position inside the coverage band, automatic routine virtual frequency parameter inline with four times of the interruption frequency for random number request, on idle sustaining the previous frequency divided by the power of lowest amplitude (that of the tangent point (touching point of the actual scan) of the streamline nearest to the component location inside the matrix)
The Kindle Fire HDX line uses a quad - core Qualcomm Snapdragon 800 clocked at 2.2 GHz with 2 GB of RAM and Adreno 330 graphics, which Amazon claims to be over three times the processing power of the previous generation.
A New Performance Driven Platform RIM's line up of next generation BlackBerry smartphones are built on a new performance driven platform powered by the latest BlackBerry software and hardware.
«Today's console technology is literally decades ahead of what powered Splatterhouse when it made its first indelible bloody mark on gaming, which means we now have gore like never before for all the fans and the new generation of gamers lining up to get to grips with Rick,» said Hiroaki Ochiai, VP Sales and Marketing, NAMCO BANDAI Games Europe S.A.S. «If you have the stomach for it, there's nothing more satisfying than beating a hell beast to death with its own leg.»
Global Energy Interconnection (GEI), a vision of a world power grid, was outlined by the State Grid Corporation of China («State Grid») It would be based upon a global network of Ultra High Voltage power lines connecting global power generation including massive wind farm at the North Pole and solar power from equatorial areas to energy users around the world.
The problems are: Lack of a constructive, earth nurturing moral outlook, ideology that encourages expanding capitalist economies that do not factor ecological capital or its destruction into their bottom line, greed as a way of life, corporate imperatives and power, intentionally misinformed or ignorant public (especially in the United States and China), inertia, rampant bad design in energy generation, housing, transportation, community planning, consumer products and packaging and materials cycling, etc..
-LSB-...] The proposed transmission line would be constructed in phases to connect offshore wind power to the grid based on the company's estimates of when offshore wind generation facilities will be in place.
Consequently with the dramatic decrease in efficiency of fuel burn in the standby fossil fuel generators there is sweet FA practical reduction in CO2 emissions with the introduction of wind and solar power generation systems particularly when the energy costs of the producing and building the so called renewable energy systems are added to the grossly inefficient running of the ready to go to full generation capacity in minutes, fossil fuel powered standby generators which in many cases must be kept running at low or zero power generation to be able to come on line in minutes when the so called renewable energy systems fail to produce power,
In a statement, NYPA explained the ability to increase the voltage when the demand requires «is a cost - effective way to add on more renewable power, especially from in - state renewable generation, anywhere along the transmission line
The utilities are demanding that, as the economics of renewable generation are increasingly coming into line with conventional power, subsidies should be reined in so the two can compete.
wind and solar do not replace fossil fuel generation, as that has to be maintained at and close to previous levels to cater for power needs when the unreliable, unpredictable wind and solar generation systems go off line or fail or just don't produce much power.
Although coal - fired power generation may not be flexible enough to make up for the variability of wind power at the source region, the «hybrid - by - wire» strategy allows the lines to have a high utilization rate, and provides the flexibility to increase the share of renewable transmission in the future.
Herman Trabish of Greentech Media has happened across a pretty interesting find — 97 % of new electricity generation capacity in line to be added to the California grid in the second half (2H) of 2012 is from solar power projects.
Each regional model sector will encompass power generation, transmission, and sale; the financing, construction, and maintenance of power infrastructure (generators and transmission lines); and also key societal and environmental factors such as population, quality of life, and pollution.
Since the lead time for construction of wind power plants is much shorter than that of transmission lines and conventional power plants, it becomes critical that grid augmentations are planned with significant foresight into political and industry intentions for the development of renewable energy based generation.
Industry witnesses were lining up Sept. 11 to take shots at a proposal by the Ohio Power unit of American Electric Power to protect the futures of about 3,100 MW of coal - fired generation through a power purchase agreement it wants approved by the Public Utilities Commission of Power unit of American Electric Power to protect the futures of about 3,100 MW of coal - fired generation through a power purchase agreement it wants approved by the Public Utilities Commission of Power to protect the futures of about 3,100 MW of coal - fired generation through a power purchase agreement it wants approved by the Public Utilities Commission of power purchase agreement it wants approved by the Public Utilities Commission of Ohio.
Traditionally, when presented with a constraint on the system relating to reliability, load growth or the introduction of intermittent generation, a utility had one option: build new infrastructure, such as new substations, power plants or transmission lines.
Line 114: «is powered by wind farms» No need to specify the type of electricity generation technology.
a b c d e f g h i j k l m n o p q r s t u v w x y z