As a consistent continuation of the series West has been working since 1987 to construct furniture for sitting and reclining, using
prefabricated elements and discarded industrial products which he covered by stretching fabrics or carpets over them.
The project used
prefabricated elements to construct the garage and the Construction Manager at Risk delivery method (Every Day Counts Method).
Not exact matches
This project will evaluate connections between
prefabricated bridge
elements through ultra-high performance concrete.
I don't understand the use of the term Modular; that has a very clear meaning in the architectural world, namely as a type of
prefabricated modules that are complete
elements including structure, services and finishes.