And as you can see from available renderings, the
method of accomplishing such goals is primarily through
prefabrication and passive and active design strategies.
Prior to on - site construction, steps were taken to ensure the trees» preservation, such as
prefabrication, since local construction
methods heavily favored heavy masonry, another
method was needed to better protect the trees.