Sentences with phrase «preliminary conceptual designs»

Complete preliminary conceptual designs and techno - economic analyses that predict plant efficiency, cost of products, and environmental performance.

Not exact matches

However, its request for about $ 120 million over 5 years for conceptual design work on the CEPC failed to win approval earlier this year from China's National Development and Reform Commission; instead, the project received some $ 5 million for preliminary study.
electric power plants are: (1) survey and assess the capacity, cost, and location of potential depleted gas and oil wells that are suitable CO -LCB- sub 2 -RCB- repositories (with the cooperation of the oil and gas industry); (2) conduct research on the feasibility of ocean disposal, with objectives of determining the cost, residence time, and environmental effects for different methods of CO -LCB- sub 2 -RCB- injection; (3) perform an in - depth survey of knowledge concerning the feasibility of using deep, confined aquifers for disposal and, if feasible, identify potential disposal locations (with the cooperation of the oil and gas industry); (4) evaluate, on a common basis, system and design alternatives for integration of CO -LCB- sub 2 -RCB- capture systems with emerging and advanced technologies for power generation; and prepare a conceptual design, an analysis of barrier issues, and a preliminary cost estimate for pipeline networks necessary to transport a significant portion of the CO -LCB- sub 2 -RCB- to potentially feasible disposal locations.
The research needs that have high priority in establishing the technical, environmental, and economic feasibility of large - scale capture and disposal of CO -LCB- sub 2 -RCB- from electric power plants are: (1) survey and assess the capacity, cost, and location of potential depleted gas and oil wells that are suitable CO -LCB- sub 2 -RCB- repositories (with the cooperation of the oil and gas industry); (2) conduct research on the feasibility of ocean disposal, with objectives of determining the cost, residence time, and environmental effects for different methods of CO -LCB- sub 2 -RCB- injection; (3) perform an in - depth survey of knowledge concerning the feasibility of using deep, confined aquifers for disposal and, if feasible, identify potential disposal locations (with the cooperation of the oil and gas industry); (4) evaluate, on a common basis, more» system and design alternatives for integration of CO -LCB- sub 2 -RCB- capture systems with emerging and advanced technologies for power generation; and prepare a conceptual design, an analysis of barrier issues, and a preliminary cost estimate for pipeline networks necessary to transport a significant portion of the CO -LCB- sub 2 -RCB- to potentially feasible disposal locations.
Mr. Orme has extensive experience (over 30 years) applying process engineering knowledge to pilot and full - scale chemical processing and waste treatment facilities for industrial clients and U.S. Government sites including conceptual studies preliminary and final designs equipment specification process testing and operations.
Along with developing the preliminary drawings of the space, the inspiration board is the first step in a projects conceptual design.
a b c d e f g h i j k l m n o p q r s t u v w x y z