This increase in
storage is accomplished by pressurizing the
hydrogen to a much greater degree than previous
tanks: Where older models might be pressurized at 2 - 10 atmospheres this new prototype
tank can operate at a
pressure of 350 atmospheres.
Engineering & Inspections (Kapolei, HI) 10/2002 — 06/2003
Pressure Equipment Inspector • Perform pressure equipment inspections to the requirements of API - 653, 510 and 570 • Inspect large above ground storage tanks monitoring repairs to the requirements of API - 650 / 653 • Finish 400 piping system inspections in less than 2.5 months and identify hundreds of non-conformities • Finish inspection of 20 large above ground storage tanks (AST) and identify numerous service induced non-conformities • Complete the remaining pressure vessel inspections for 2003 and identify several potentially catastrophic anomalies • Write repair procedure for high pressure hydrogen compressor
Pressure Equipment Inspector • Perform
pressure equipment inspections to the requirements of API - 653, 510 and 570 • Inspect large above ground storage tanks monitoring repairs to the requirements of API - 650 / 653 • Finish 400 piping system inspections in less than 2.5 months and identify hundreds of non-conformities • Finish inspection of 20 large above ground storage tanks (AST) and identify numerous service induced non-conformities • Complete the remaining pressure vessel inspections for 2003 and identify several potentially catastrophic anomalies • Write repair procedure for high pressure hydrogen compressor
pressure equipment inspections to the requirements of API - 653, 510 and 570 • Inspect large above ground
storage tanks monitoring repairs to the requirements of API - 650 / 653 • Finish 400 piping system inspections in less than 2.5 months and identify hundreds of non-conformities • Finish inspection of 20 large above ground
storage tanks (AST) and identify numerous service induced non-conformities • Complete the remaining
pressure vessel inspections for 2003 and identify several potentially catastrophic anomalies • Write repair procedure for high pressure hydrogen compressor
pressure vessel inspections for 2003 and identify several potentially catastrophic anomalies • Write repair procedure for high
pressure hydrogen compressor
pressure hydrogen compressor bottles