CITY HOTEL — Vaughan, ON Jun 2011 — Present Cater Waiter • Set up and break down both buffet and seated meal function • Service customers in a very professional and quick manner • Maintain inventory and record of products • Build working relationships with patrons and coworkers • Utilize the highest level of guest service skills to maximize the satisfaction of patrons • Perform multiple tasks simultaneously and meet
production time schedules • Lift heavy weights and stand for long periods of time to get the job done
Not exact matches
Important factors that could cause actual results to differ materially from those reflected in such forward - looking statements and that should be considered in evaluating our outlook include, but are not limited to, the following: 1) our ability to continue to grow our business and execute our growth strategy, including the
timing, execution, and profitability of new and maturing programs; 2) our ability to perform our obligations under our new and maturing commercial, business aircraft, and military development programs, and the related recurring
production; 3) our ability to accurately estimate and manage performance, cost, and revenue under our contracts, including our ability to achieve certain cost reductions with respect to the B787 program; 4) margin pressures and the potential for additional forward losses on new and maturing programs; 5) our ability to accommodate, and the cost of accommodating, announced increases in the build rates of certain aircraft; 6) the effect on aircraft demand and build rates of changing customer preferences for business aircraft, including the effect of global economic conditions on the business aircraft market and expanding conflicts or political unrest in the Middle East or Asia; 7) customer cancellations or deferrals as a result of global economic uncertainty or otherwise; 8) the effect of economic conditions in the industries and markets in which we operate in the U.S. and globally and any changes therein, including fluctuations in foreign currency exchange rates; 9) the success and timely execution of key milestones such as the receipt of necessary regulatory approvals, including our ability to obtain in a timely fashion any required regulatory or other third party approvals for the consummation of our announced acquisition of Asco, and customer adherence to their announced
schedules; 10) our ability to successfully negotiate, or re-negotiate, future pricing under our supply agreements with Boeing and our other customers; 11) our ability to enter into profitable supply arrangements with additional customers; 12) the ability of all parties to satisfy their performance requirements under existing supply contracts with our two major customers, Boeing and Airbus, and other customers, and the risk of nonpayment by such customers; 13) any adverse impact on Boeing's and Airbus»
production of aircraft resulting from cancellations, deferrals, or reduced orders by their customers or from labor disputes, domestic or international hostilities, or acts of terrorism; 14) any adverse impact on the demand for air travel or our operations from the outbreak of diseases or epidemic or pandemic outbreaks; 15) our ability to avoid or recover from cyber-based or other security attacks, information technology failures, or other disruptions; 16) returns on pension plan assets and the impact of future discount rate changes on pension obligations; 17) our ability to borrow additional funds or refinance debt, including our ability to obtain the debt to finance the purchase price for our announced acquisition of Asco on favorable terms or at all; 18) competition from commercial aerospace original equipment manufacturers and other aerostructures suppliers; 19) the effect of governmental laws, such as U.S. export control laws and U.S. and foreign anti-bribery laws such as the Foreign Corrupt Practices Act and the United Kingdom Bribery Act, and environmental laws and agency regulations, both in the U.S. and abroad; 20) the effect of changes in tax law, such as the effect of The Tax Cuts and Jobs Act (the «TCJA») that was enacted on December 22, 2017, and changes to the interpretations of or guidance related thereto, and the Company's ability to accurately calculate and estimate the effect of such changes; 21) any reduction in our credit ratings; 22) our dependence on our suppliers, as well as the cost and availability of raw materials and purchased components; 23) our ability to recruit and retain a critical mass of highly - skilled employees and our relationships with the unions representing many of our employees; 24) spending by the U.S. and other governments on defense; 25) the possibility that our cash flows and our credit facility may not be adequate for our additional capital needs or for payment of interest on, and principal of, our indebtedness; 26) our exposure under our revolving credit facility to higher interest payments should interest rates increase substantially; 27) the effectiveness of any interest rate hedging programs; 28) the effectiveness of our internal control over financial reporting; 29) the outcome or impact of ongoing or future litigation, claims, and regulatory actions; 30) exposure to potential product liability and warranty claims; 31) our ability to effectively assess, manage and integrate acquisitions that we pursue, including our ability to successfully integrate the Asco business and generate synergies and other cost savings; 32) our ability to consummate our announced acquisition of Asco in a timely matter while avoiding any unexpected costs, charges, expenses, adverse changes to business relationships and other business disruptions for ourselves and Asco as a result of the acquisition; 33) our ability to continue selling certain receivables through our supplier financing program; 34) the risks of doing business internationally, including fluctuations in foreign current exchange rates, impositions of tariffs or embargoes, compliance with foreign laws, and domestic and foreign government policies; and 35) our ability to complete the proposed accelerated stock repurchase plan, among other things.
In his book «High Output Management,» Andy Grove, founder of Intel, advocates that «a manager should use his calendar as a «
production» planning tool, taking a firm initiative to
schedule work that is not
time - critical.»
On -
time production is critical for the company, since it will only be able to make its first dollar profit in 2013 if it delivers cars on
schedule.
Without that incentive to commit to mass - scale
production, factories could shift
production schedules and be more responsive to demand, moving even closer to just - in -
time manufacturing.
Beyond supply chain distribution capabilities, SYSPRO provides deep functionality for manufacturers, including managing inventory levels to optimize the competing demands of availability versus cost, defining bills of materials, calculating lead and elapsed
times as well as order quantities, planning and
scheduling of
production, material requirements and capacity planning, managing work - in - progress, integrating with CAD and shop - floor data collection systems and cost control and tracking.
«Leveraging buying power gained through long - term relationships allows us to offer competitive pricing, reliable procurement and on -
time production scheduling.»
We'll even work around your
schedule to minimize any
production down
time.
Some mothers find it is more difficult to maintain milk
production long term with a pump for a variety of reasons including difficulty
scheduling time to express (frequency of milk removal) and the overall effectiveness of the pump at removing milk.
What we are seeing over
time is that through the diminished
production of oxytocin in the birth process (the use of synthetic oxytocin, i.e. Pitocin is named the key culprit, though
scheduled cesarean births and pseudo-natural birth environments are also big contributors), we are evolutionarily losing our ability to produce it.
I am an athletic single man.I am a full
time student and am currently studying film and media
production here in Jacksonville.I have a very busy
schedule and live life to the fullest.
Even with a rushed
production schedule - during which
time a number of the crew's cameras froze while filming the Christmas scenes - there is no excuse for such an appalling attitude.
As the film's shooting
schedule wears on, Fairbanks becomes romantically involved with her leading man, Jake Fields (Jeremy Sisto), but Fields and his friends on the
production staff begin to question her stability when she starts wearing her costumes at all
times, living on the sets, and tries to live as the character of Guinness.
Ross will not be working on the sequel «Catching Fire» after saying he didn't have the
time necessary to pen and prep the film due to a tight
production schedule.
While
production isn't
scheduled to resume until July 10, Howard wasted little
time in expressing his gratitude and his excitement to join the Star Wars franchise.
McGarry, a first -
time filmmaker, spent five years in
production on Code Black while simultaneously working the hectic
schedule of a young doctor in training.
No other producers are attached at this
time, and there has been no
production schedule released or release date announced.
But with a tightly run
production schedule, a movie that will likely mostly be shot on a soundstage should be just about able to get in on
time, so the real question is, will this be another «Nine»?
At a recent press open house at Marvel's LA offices, the director took some
time out of his
schedule to show reporters some of the upcoming film's storyboards and
production art, as reported by Entertainment Weekly.
The show is currently in
production on its final season and RJ took some
time out of his busy shooting
schedule to talk about his involvement with the show and how it has progressed over the last 5 seasons.
Omega Underground has confirmation that Gambit has been pulled for the
time being off
production schedules and I assume until a director has been found will be placed on hiatus until new dates can be
scheduled dependent on who directs.
While a fall
production start date still gives plenty of
time for Jason Schwartzman to clear up his
schedule, Her Smell sees Moss play Becky Something, a maniacally destructive punk rock star who pushes her relationships with bandmates, family and followers to the limit as she wages a years - long war against sobriety while attempting to re-engage the creativity that had once led her band to massive crossover success.
Thanks to the intricacies of film
production — particularly the
scheduling ballet required for awards season plays — all of the films being released this fall were conceived or made at least partially in a pre-Trump
time.
Authenticity: Many participants felt while they faced many challenges in the theatrical
production (balancing full -
time school, life, and a rigorous six - week rehearsal
schedule), the challenges were worth the connections they made to an outside audience of their work.
The soft top is
scheduled to enter
production in 2015, right about the
time Alfa says it will return to the United States.The 4C...
The soft top is
scheduled to enter
production in 2015, right about the
time Alfa says it will return to the United States.
Vehicle availability (
timing) may vary by brand, depending on start - of -
production schedules.
Remember to keep the
production schedule on
time.
People often ask me how I get so much done, but even as a full -
time writer, there's no way I could maintain a
production schedule like that.
To keep projects on
schedule and to control the
production costs for fixed price design projects, Elegant Book Design has allowed for a limited amount of
time for refining a design into the finished artwork.
As a relatively new indie author, it's encouraging to hear that a slower
production schedule can still lead to a full -
time career.
That's why, despite the fact that traditional book reviewers should probably have changed their submission requirements long ago, when the technological changes in book publishing shortened the book
production schedule so much, it's still impossible for book publicists (and for authors who are conducting book publicity campaigns) to bypass the rules and garner traditional book reviews without having at least three months» lead
time.
Once you have discussed payment with your producer (you choose between a one
time fee or royalties) and a
schedule for
production, it is
time to create.
A description of the
production process (
time to draft, critique partners, editors, other publishing team members), as well as a
schedule for the coming years.
Her first play was a finalist for the Eugene O'Neill Memorial Theater Competition, and was
scheduled for
production twice: the first
time, the theater owner died, and the season was shut down; the second
time, the director committed suicide.
These book
production «factories» have no
time in the
schedule or room in the budget to slow down and pay attention to quality or your image, let alone other important factors which influence the power of your cover.
From the
time you start the
production process, we estimate that it will take about 6 to 12 weeks to complete the audiobook, depending on the length of the book and the Producer's
schedule.
It allows copies of the book to reach bookstore shelves before major publicity appears, gives reviewers some lead
time to prepare their articles, and provides a margin for unforeseen changes in the book's
production schedule.
Months ahead in our content
production schedule, we think about what would be relevant during June, July, August... Maybe it's
time to plant trees; we research that.
After a tumultuous
production schedule and numerous changes to the core mechanics — For example the setting was changed to the Sixties to take advantage of Cold War paranoia prevalent at the
time and the focus of the game shifted from an investigative procedural where you obtain photographs and other evidence to a more straightforward third person shooter — The Bureau was pipped at the post by Firaxis's critically acclaimed XCOM — Enemy Unknown.
The plans come as Chinese cities struggle with power shortages that have forced
scheduled blackouts and required industries to close or shift
production to weekends or other
times when demand is weakest.
One is «dispatchable load,» i.e., power consumption that can be
scheduled, drawing more energy in
times of peak
production and in some cases releasing clean power back to the grid during the valleys.
Shortly before the DigiTimes report came to light, analyst Ming - Chi Kuo mentioned a similar
production schedule and launch
time frame for the larger iPad.
Still, the supply chain source believes Apple and parts makers have enough
time to make sure components are prepared for expected
production and shipment
schedules.
Attended cross-functional product meetings to discuss parts sourcing, lead
times and
production schedules
Planned, prepared, issued and controlled
production schedules and coordinated with material requirements to ensure a controlled flow of approved materials
timed to meet
production requirements.
Coordinated
scheduled and unscheduled maintenance and developed real
time engineering solutions to process and hardware failures for polishers on the
production line during critical 14nm technology ramp
From
time - to -
time they also have to take care of processing e-mails that are received by the organization, checking the security functions in the organization, monitor the energy consumption, maintain records,
schedule distribution, and send materials for
production.
Serves as customer interface and focal point to expedite
production cycles and adherence to
time sensitive
schedules
Scheduled and expedited
production, through manufacturing process, to guarantee on
time delivery.