ACTIVE WORKFORCE, Los Angeles, CA Carpenter 2013 — Present • Design and install wooden partitions, structure frames, windows and doors • Fit false ceilings and dry
walls based
on blueprints • Issue cost estimates for various
projects based
on floor plans • Cut and build office and home furniture as per design and customer requirements • Repair old furniture, interior, and
exterior woodwork • Build and install
wall cabinets and built - in wooden shelves
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior
Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction
project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain
wall system • Completed
project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
project on schedule without disrupting the University's use of the 1st floor and
exterior • Oversee the $ 5.6 million
exterior renovation of the Anaheim Convention Center • Remove
exterior walls on 3 sides of the building and install complex new curtain
wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction