It has a PEG ratio of.57,
a projected current year P / E ratio of 17 and no long - term debt.
For the purpose of this monthly list, I define value as a stock with
a projected current year PE of under 20 and a Price to Earnings growth ratio under 1.
Not exact matches
Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of
current and future exploration activities; the actual results of reclamation activities; conclusions of economic evaluations; meeting various expected cost estimates; changes in
project parameters and / or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled «Risk Factors» in the Company's Annual Information Form for the
year ended December 31, 2017 dated March 15, 2018.
Deficits will probably reach $ 1 trillion in the
current or next fiscal
year, almost double what the Congressional Budget Office had
projected less than a
year ago for 2018.
Trump wants Congress to shell out $ 1.5 billion for his promised border wall with Mexico in the
current fiscal
year — enough for pilot
projects to determine the best way to build it — and a further $ 2.6 billion in fiscal 2018.
Amazon (amzn), Google parent Alphabet (goog), and UPS (ups) are all testing drone deliveries in the U.S.. However, several drone analysts and technologists say that
current regulatory conditions, technological limitations, and lack of financial viability could prevent the
projects from taking off in the U.S. for several
years.
In its
Current Market Outlook, Boeing
projects total demand for nearly 40,000 new jets over the next 20
years — a 4 percent increase over last
year's forecast — with a large percentage of the growth occurring in Asia.
He noted that the baseline scenario for tests in 2015 — which
projected an economic contraction of 2.3 percent for that
year — was more dramatic than the 1.3 percent contraction used in the most conservative scenario in the
current tests.
A study conducted by Olin Business School at Washington University in St. Louis
projected that 40 percent of the
current Fortune 500 companies will face extinction in 10
years.
During an interview with WNYC's Brian Lehrer on Tuesday morning where he first announced the proposal, Johnson noted the city's budget has grown from $ 86 billion in the
current fiscal
year to a
projected $ 88 billion starting on July 1.
The deficit for the
current fiscal
year that ends in two weeks is
projected to be $ 25.9 billion — exactly as forecast in the fall fiscal update but up significantly from the $ 21.1 billion posited by Flaherty in last March's budget.
This powerful calculator showed that I have a 78 % chance of meeting my goal of $ 40,000 per
year in retirement based on my
current savings, spending habits, and
projects retirement contributions.
This affected not only the
current year's fiscal estimates but the projections for the outer
years as well, given that they are
projected on the
current year's base.
Clark and her government are totally manipulative as they dispense spin to a seemingly gullible public on how great they are for the environment - the
current carbon tax of $ 30 a ton has remained frozen for
years and recently they have approved a huge LNG
project and will no doubt OK the Kinder Morgan pipeline - and there is pretty good chance the good citizens of this province will eat up all the propaganda and vote them back in!
I
project that the
current momentum in VNDA will continue to rise over the next few coming months, and I am looking for a target of $ 20 to $ 22 by
year's end in VNDA.»
These facilities could be impacted by long - term (> 100
years) rising sea levels; however, the range of currently estimated short - term rise in sea levels suggest that neither facility would be impacted within the
current lifespan of the
projects (< 20
years),» the company said in March 2017.
The
projected surplus for next
year has doubled, and the
current budget will all but balance.
The
current BCPI methodology, as presented in the July 2012 Monetary Policy Report,
projects individual commodity weights from the Input - Output reference
year (currently 2012) through the last period in which full -
year historical price and production data is available (currently 2015).
I haven't worked on apprenticeship
projects much in the last few
years, but one of my
current gigs has got me thinking about the area again.
And for the
current fiscal
year growth is
projected at 6.4 %, slightly higher than forecast earlier.
Given the long lead times for resource
projects, this earlier investment is expected to result in significant expansions in mining capacity in the
current financial
year and in 2005/06.
Thirty
years of high quality work by reputable operators have brought the Grassy Mountain Gold
Project to its
current advanced state.
On a 12 -
year horizon, we
project likely S&P 500 nominal total returns averaging close to zero, with the likelihood of an interim market loss on the order of 50 - 60 % over the completion of the
current cycle.
With
current quarterly share price growth of 12.5 percent and five -
year growth
projected to be 13 percent, CarMax is a good long - term play.
Good or OK categories include
current ROE and its trend, the
projected EPS growth rate of 8 % per
year, and the company's free cash flow situation.
The entertainment complex
project, launched under developer Mills Corporation during the 2004 boom, fell into default during the economic downturn and hung in the balance for
years before being acquired by
current owner Triple Five Group in August.
«The proportion of Chinese buyers in primary
projects is expected to grow from the
current around 5 % to around 10 %, compared with the peak level of around 35 % last
year, while the proportion of corporate buyers is set to grow from the
current around 10 % to around 15 %, compared with the peak level of 20 - 30 % last
year.
At its
current valuation of $ 38 / share, the market is
projecting GM's pre-tax margins to immediately decline to 4.5 % (its previous low in 2012) and its revenue to decline by 3 % a
year for 11
years.
The store is one of 37 Supercentre
projects planned for the company's
current fiscal
year which ends January 31, 2014.
A network that underpins the virtual currency bitcoin is
projected to require all of the world's
current energy production in order to support itself within three
years, according to estimates.
Further, the minister also announced that the ministry shall be announcing 100 Cold Chain
Projects and a SAMPADA scheme focusing on seamless agri cluster development in the
current year that shall take food processing industries to the next level.
CST Wastewater Solutions»
current major FAST
project, scheduled to be completed this
year, involves combination units with total capacities from 100 to more than 300 cubic metres a day.
In business for nearly 30
years, the innovative company mastered an ambitious IT modernisation
project to streamline
current operations and enable future growth.
Spanish source Marca claim that the 32 -
year - old's
projected move to Atletico Madrid has stalled and Motta's
current Parc des Princes deal expires next summer.
we can't even get rid of players that have barely mannered to us for several
years... which is incredibly annoying considering that our beloved owner would never risk his own financial resources whether he brought in some new blood or offloaded several failed Wenger
projects for less than market value... he would simply make a little less and the burden would fall squarely on other sources of income, primarily us... I don't know about you but I would gladly use all the money they have been stockpiling to rid ourselves of those that don't meet acceptable standards and to replace them with a few higher priced gems... I know, I know, Wenger and his minions have been scouring the globe for
years now to find anyone that was as good as our
current lot to no avail, but I've just got to believe there must be two or three guys somewhere out there that can play this crazy game
I highly doubt the Golden Eagles grab another undergraduate transfer, as they
project to be one of the better teams with their
current lineup next
year in the Big East, and «adding for the future» in terms of an undergrad transfer probably isn't in the plans.
Features: New and improved designs A3 Size, 170 gsm Gloss Good quality with striking pictures of real people Attractive and eye catching design Developed in partnership with Health, Education and Early
Years professionals as well as Sure Start
Projects Strong
current and relevant theme — Every Child Matters Gives important messages to men and fathers visiting your environment Highlights activities that provide better outcomes for children and young people
Woods
projected that the park district «s tax rate would decline next
year to 74 cents per $ 100 of assessed value from the
current 80 cents.
My
current project is crafting mother's day presents for many of the wonderful women and mothers in my life that my two
year old can help with.
While his
current projects involve everything from oysters and horseshoe crabs to bats and butterflies, he has studied primarily bird ecology for the last 20
years, working on research
projects in Kenya, Florida, Texas, California, Arizona, Mexico, and the Pacific Northwest.
The
projects will be supported largely through a $ 30 million donation made last
year to the Foundation for the National Institutes of Health by the NFL, which is wrestling with the issue of concussions and their impact on
current and former players.
«This does not imply that
projects captured in the previous
year's budget will not feature in the
current proposal, especially if the
project was not implemented due to funding challenges or is still an ongoing
project.»
The Executive Budget, at $ 134 billion, proposes to close a $ 7.4 billion gap between
projected spending and revenues, including a $ 500 million deficit carried forward from the
current Fiscal
Year.
The budget deficit for the
current fiscal
year had grown to $ 350 million dollars, and the
projected gap for the new fiscal
year would be a $ 3.5 billion dollar hole, if spending were to take place as planned.
The Kitimat modernisation
project will increase the smelter's
current production capacity by more than 48 per cent to approximately 420,000 tonnes per
year.
Former whistleblower and
current Maryland Senate candidate Chelsea Manning made a surprise appearance, speaking briefly with
Project Veritas» James O'Keefe — who came under fire this
year after his organization attempted an undercover sting operation to discredit the accusers of former Alabama GOP candidate Roy Moore.
Connecticut comptroller Kevin Lembo is
projecting the state's surplus has increased for the
current fiscal
year, and he's calling on the legislature to make a change in state law to allow more of that money to be saved for harder times.
Besides a small deficit in the
current fiscal
year, the new
year that begins July 1 is
projected to be about $ 500 million in the red.
Connecticut Comptroller Kevin Lembo is
projecting a $ 7 million deficit in the state's 2 -
year, $ 40 billion budget when the
current fiscal
year ends in June.
For the past one
year, since power was handed to the
current administration, I am yet to read a record of the list of water
projects initiated, even if not completed, to allay the fears of the millions of Ghanaians who are faced with the dangers of water rationing coming in the wake of Ghana's escape from the grip of power rationing through conscious investments made in the energy sector by the John Dramani Mahama administration.