Walls had been removed to open it up as an office space, so those needed to be rebuilt, along with
proper bathrooms and a kitchen.
Not exact matches
Inside the family suites, the incredible theming continues — there are two
proper bathrooms, a
kitchen area, a dining area that magically transforms into a pull - down double bed at night time,
and another leather sofa, themed like the rear seat of a car, that also folds out into a double bed.
With all the comfort of a permanent structure,
proper furniture,
bathroom, a fully equipped
kitchen and a solid wooden floor, they still preserve the romance
and atmosphere of staying in a tent.
Our washing machine
and water boiler are placed in the
kitchen, cause in the
bathroom I barely managed to place a little cabinet, 35 cm wide, so I do nt even have a dishwasher or a
proper table with two chairs in the
kitchen.
i have knitted just once in my life, a blanket for my first grandson because that's what grandmas are supposed to do right lmao, i used a loom
and knit it so tight it weighs a ton
and for the life of me
and 67 videos later could not figure out how to finish off the last corner, even though it was wonky my daughter
and son in law received it with the
proper ohhs
and ahhs
and my poor grandson had to suffer having it put on him
and them it was passed to my second grandson
and he had to endure it also, so i went to maggie's site to look at video
and was lost with the first stitch, so maybe i will just get back to painting the walls in the
kitchen so i can at least get something finished in this dang house lol xx p.s. you are not going to believe this but i hate the newspaper in my
bathroom when i close the door the walls come in
and make the room smaller than it is already
and because i am a reader of all things i have read
and reread all of the articles so many times so there it sits not finished while i try to come up with something, maybe crashing out all of the drywall
and starting over oh lord xx
The extensive inside - out top - to - bottom renovation took almost three years
and included gutting each of the five
bathrooms, the
kitchen and the basement; restoring plaster work
and mouldings; updating the fireplaces, plumbing
and electrical systems; landscaping
and regrading the entire property to bring it to code;
and installing
proper drainage.