They alleged that the Village and the Planning Commission were negligent for failing to ensure that plans and specifications conformed to the applicable laws, regulations, and bylaws before approving them, and for failing to carry out
proper building inspections.
As with other bad experience stories of questionable merit, this one begins with a weak reason, suggesting as to why a full and
proper Building Inspection may have been inhibited by special circumstances: «The utilities were all off and the house had been vacant for sometime.»
Not exact matches
The
inspection verifies that
proper building techniques were used and that the various components of the home were properly installed.
¥ Maintained digitally controlled HVAC systems to ensure efficient operations ¥ Kept records of all service tasks including a Education of all work performed ¥ Ensured
proper building pressurization to maintain sufficient indoor air flow ¥ Conducted regular system
inspections and maintained database of results ¥ Tested temperatures at vents and checked indoor air quality levels ¥ Assisted with larger installation and maintenance projects ¥ Prepared service and maintenance schedules ¥ Replaced and repaired HVAC parts.
Engaged in routine
inspections and ensured the
proper operation of the
building's commercial equipment
Professional Experience United Technologies Corporation — Sikorsky Aircraft (Stratford, CT) 2006 — Present Manufacturing / Process Engineer • Performed producibility reviews on new aircraft drawings • Created rework and addendum plans to incorporate new aircraft design changes • Referenced component designs, verified engineering changes, and constructed PCAS sheets • Tracked and verified requirements for assembly and component integration using SAP • Created / updated process plans and determined sequence of operations for equipment installation • Determined production plan
inspection requirements to align with QA approval • Resolved production
build issues pertaining to electrical and avionic components • Assisted ACE Team Leads by maintaining Category 1,2 & 3 escape metrics on a weekly basis • Performed 6S monthly audits for ACE ensuring
proper, compliant operations
Prepare for the
inspection: Ensure that the home owner had the
proper building permits for any jobs requiring electrical work.
Was it properly
built and were the
proper inspections carried out for the work completed?