Funding may not be the only off - putting aspect of capital building works — the prospect of educating
pupils on a building site is not exactly appealing, and there are important factors to consider such as safeguarding, health and safety, and procurement practice.
Not exact matches
Additionally,
on the topic of rising
pupil numbers, modular
buildings hold the easy possibility of extension and the capability to be easily moved, far more suitable to a changing school
site than a traditional construction.
The scheme includes new school
buildings to the front of the Simon Balle school
site offering accommodation for the primary aged
pupils along with outdoor play facilities, improved
on -
site car parking with a revised in and out scheme and an
on -
site drop off area.
Manor College of Technology,
built in 1966, is to have # 14m spent
on it, while the work at 50 - year - old Barnard Grove
site is costing # 2.8 m. Students at the 1,250 - capacity Manor College will benefit from a new three ‑ storey «super block» with updated teaching facilities and a specialist block for 30
pupils with learning difficulties, as well as a major refurbishment of the sports hall and a new multi-use games area.
It is anticipated to be
built on the former St Peter's College
site in Chelmsford for
pupils with SEMH needs.