Sentences with phrase «rail capacity in»

22nd September 2017 According to South African rail, port and pipeline company Transnet, increasing rail capacity in South Africa is critical for unlocking coal export opportunities, both for neighbouring African countries and for the domestic market.

Not exact matches

Railways, who added crude by rail capacity earlier this decade only to have the market vanish as pipeline space opened up, have been slow to move back in the oil transport business, asking producers to sign longer - term deals.
Weeks later, a FirstEnergy Capital report still clung to the idea that ramped - up rail transportation, new heavy - oil refining capacity in the U.S. Midwest and the easing of the storage glut in Cushing, Okla., would keep this monster on a leash.
Canadian producers had hoped a return to full capacity on the line would help relieve a bottleneck in the oil - rich province of Alberta, where increased output has run up against a shortage of pipeline and rail capacity.
«Rail and supporting non-pipeline modes should be capable, as was projected in 2011, of providing the capacity needed to transport all incremental Western Canadian and Bakken crude oil production to markets if there were no additional pipeline projects approved.»
«In light of our capacity challenge, we've reduced our crude by rail business the last 2 quarters,» Ruest said.
The IEA says rail shipments are expected to return to around the 170,000 - barrel - a-day level in 2020 assuming Enbridge Inc. replaces its Line 3 pipeline and adds capacity elsewhere on its Mainline pipeline system.
Raitt's three - year timeline to fully dispose of older DOT - 111A tankers (and immediate phase - out of 5,000 of the most vulnerable cars) is going to be a difficult one to meet given the existing capacity for suppliers to build new tankers, as well as the desire of oil and gas companies to continue the exponential increases in oil - by - rail shipments into the future.
That would account for shipping costs and the lower quality of WCS versus WTI, as crude - by - rail shipments increase and capacity returns to normal on the Keystone pipeline across the U.S., which has faced pressure limits since it leaked in November in South Dakota.
«If Keystone does not get approved, the rail capacity is going to be there,» Phil Skolnick, managing director and senior oil and gas analyst at Canaccord, said in an interview.
We already paved the way for a mega-development in an urban area with the requisite access to highways, rail, an international airport; proximity to major institutions of higher education; a redundant fiber optic loop in the works for Internet access, and capacity to handle the 8 million square feet of office space the company will eventually need.
In particular, the Board of Trade would like to see focus expanded to include other projects necessary to the growth of our region, such as the replacement of the George Massey Tunnel, improved port and rail capacity across the region, and a six - lane replacement for the aging Pattullo Bridge in cooperation with TransLinIn particular, the Board of Trade would like to see focus expanded to include other projects necessary to the growth of our region, such as the replacement of the George Massey Tunnel, improved port and rail capacity across the region, and a six - lane replacement for the aging Pattullo Bridge in cooperation with TransLinin cooperation with TransLink.
«A singular emphasis on grain has the unintended but inevitable consequence of exacerbating rail service issues for other commodity sectors, skewing the railways» allocation of scarce capacity resources towards the movement of grain,» the coalition said in a Mar. 9 letter to Garneau.
In the case of Newcastle, exports are running below port capacity and bottlenecks appear to be concentrated in the rail networIn the case of Newcastle, exports are running below port capacity and bottlenecks appear to be concentrated in the rail networin the rail network.
Accelerated investment in ship - loading and rail capacity has been undertaken over the past year to match expanding iron ore production.
And even in the stronger performing components, supply constraints, including much - publicised capacity constraints in rail and port infrastructure, have begun to hamper export growth.
For the two major Queensland supply chains, the ports are operating close to capacity and investment in both port and rail facilities is necessary to allow export growth.
In the case of coal, while the capacity of port and rail infrastructure has become stretched with the latest surge in global demand, the industry has been expanding transport capacity steadily over recent yearIn the case of coal, while the capacity of port and rail infrastructure has become stretched with the latest surge in global demand, the industry has been expanding transport capacity steadily over recent yearin global demand, the industry has been expanding transport capacity steadily over recent years.
Think of it another way, in the last 7 year cycle FCA had an average FCF of $ 36 million a year, and now FCA is expanding into different rail cars types and the refurbishment / rebuilt market, more gigawatts of coal fired power plant capacity will begin construction in 09 then was build in the last 7 years and FCA has $ 162 million in cash from the 05 IPO.
A return to full capacity on the line is also expected to help relieve a bottleneck in the oil - producing province of Alberta, where increased output has run up against a shortage of pipeline and rail capacity.
In order to sidestep this pipeline capacity issue, Canadian oil producers have substantially increased transportation by rail, reaching a near high of 106,704 barrels per day in December 201In order to sidestep this pipeline capacity issue, Canadian oil producers have substantially increased transportation by rail, reaching a near high of 106,704 barrels per day in December 201in December 2015.
Such exports hit a peak of 874,260 barrels in total in July, before falling back to 346,921 in August... The re-exports have become a relief valve for both countries by reducing some congestion of supplies within the U.S. «We've got so much rail capacity now and pipe capacity is really starting to come on line, especially heading down to the U.S. Gulf,» said Martin King, analyst at FirstEnergy Capital Corp. «One way or another, the market's figured out a way to get Canadian crude to a country other than the U.S.» Tidal Energy Marketing Inc., a unit of Enbridge Inc., is one company that has shipped Canadian crude from the Gulf Coast, sending a cargo to Spain in May.
Hughes argues that there is enough existing pipeline and rail capacity to handle a 45 per cent ramp up in the oil sands production.
«Spending in excess of # 50Bn on HS2, a high speed rail line that will predominantly serve London and not address the capacity and connectivity issues of the current rail network, makes even less sense than it did before the vote to leave the European Union.»
«Crossrail will significantly increase the capacity of the rail network into and across London and relieve congestion and overcrowding on the existing Rail and Underground networks to meet the substantial growth in demand for travel over the coming decarail network into and across London and relieve congestion and overcrowding on the existing Rail and Underground networks to meet the substantial growth in demand for travel over the coming decaRail and Underground networks to meet the substantial growth in demand for travel over the coming decades.
South Wales and the West Midlands will also see electrification, while existing lines in the congested London area will see increased rail capacity.
In 2000, the government asked the Strategic Rail Authority (SRA) to look into the requirements for increasing passenger capacity to and through the capital.
«Ridership is going to continue to grow on the Long Island Rail Road, and that's all the more reason why we need to continue supporting investments in expanding its capacity,» said Kevin Law, president of the Long Island Association, a business and planning group.
Conservative transport spokesman Theresa Villiers said the government was pushing up train fares «in a bid to price people off the railways and disguise their own glaring failure to provide extra rail capacity
He added that several large new freight terminals are desperately needed in South East England and said capacity for rail freight in some areas was in short supply.
«Shadow transport secretary Theresa Villiers said this week that the Conservatives will back the development of new high speed rail lines in their election manifesto... «I am working hard on proposals to take high speed rail forward in this country to see if we can't at least start to catch up with countries like France and to deal with the capacity problems on our network,» she said.»
The government's alacrity in commissioning the high - speed rail extension makes its procrastination over London's airport capacity look even more complacent.
Triple - time welding work on rails, with increased track welding capacity, is also included in the first leg of the plan.
«Last week the Transport Secretary confirmed a number of commitments around rail in the South West, most notably around improvements to the line at Dawlish, while passengers on the Great Western route can look forward to the introduction of new high - speed trains from this summer, with extra capacity at peak times.
«The project will not only deliver jobs and growth across the country, but will be a major step in tackling the capacity crisis on the UK's rail network,» said Civil Engineering Contractors Association head of external affairs Marie - Claude Hemming.
Institution of Civil Engineers director general Nick Baveystock said that the project will add much needed capacity to the UK's rail network, strengthen connectivity and create new economic opportunities in our major cities.
The third track, first discussed 68 years ago, is expected to allow the LIRR to run more trains in both directions, increasing capacity on a 9.8 - mile rail stretch between Floral Park and Hicksville used by 40 percent of LIRR passengers.
Innovation in Rail Improvements - with funding for smaller scale capacity enhancements being made contestable and opened up to other providers;
New Jersey Gov. Chris Christie canceled the first attempt to get extra rail capacity built in 2010.
In a speech last November, President Obama himself railed against making students «fill out a bubble» and «master the basics,» urging that we instead assess kids» capacities in areas like «teamwork» and «entrepreneurship.&raquIn a speech last November, President Obama himself railed against making students «fill out a bubble» and «master the basics,» urging that we instead assess kids» capacities in areas like «teamwork» and «entrepreneurship.&raquin areas like «teamwork» and «entrepreneurship.»
The investments authorized by the Recovery Act will allow Amtrak to reduce the amount of deferred maintenance in its fleet, fixed infrastructure and fixed facilities (train stations, storage and maintenance facilities), as well as expand capacity to meet the growing demand for intercity passenger rail transportation.
State and local governments, railroads, and other stakeholders need predictable, dedicated funding to plan and invest more effectively in rail safety, reliability, accessibility, and capacity.
: w / Radius Arms Shock Absorber Diameter - Front (mm): 32 Shock Absorber Diameter - Rear (mm): 35 Stabilizer Bar Diameter - Front (in): 0.79 Stabilizer Bar Diameter - Rear (in): 0.59 Steering Type: Pwr Rack & Pinion Steering Ratio -LRB-: 1), Overall: 19.0 Lock to Lock Turns (Steering): 3.2 Turning Diameter - Curb to Curb (ft): 36.7 Turning Diameter - Wall to Wall (ft): 39.4 Brake Type: Power Brake ABS System: 4 - Wheel Disc - Front (Yes or): Yes Disc - Rear (Yes or): Yes Front Brake Rotor Diam x Thickness (in): 11.4 x 0.94 Rear Brake Rotor Diam x Thickness (in): 11.3 x 0.39 + EXTERIOR 2 - tone paint (2000) Raised roof line (2000) Roof rails w / crossbars Protective rear bumper step pad Front / rear body - color bumpers Body - color lower body - side cladding Aerodynamic body - color body - side ground effects molding Front / rear splash guards Automatic - off multi-reflector halogen headlights Multi-reflector halogen fog lights w / stone shields Daytime running lights Dual body - color fold away pwr mirrors Variable intermittent windshield wipers Fixed intermittent rear window wiper / washer Front Tire Size: 225 / 60HR16 Rear Tire Size: 225 / 60HR16 Spare Tire Size: Compact Front Wheel Size (in): 16 x 6.5 Rear Wheel Size (in): 16 x 6.5 Front Wheel Material: Aluminum Rear Wheel Material: Aluminum Wheelbase (in): 104.3 Length, Overall (in): 187.4 Width, Max w / o mirrors (in): 68.7 Height, Overall (in): 63.3 Track Width, Front (in): 57.9 Track Width, Rear (in): 57.7 Min Ground Clearance (in): 7.3 Rear Door Opening Height (in): 30.2 Rear Door Opening Width (in): 43.3 Cargo Area Length @ Floor to Seat 1 (in): 74.9 Cargo Area Length @ Floor to Seat 2 (in): 43.5 Cargo Area Width @ Beltline (in): 47.2 Cargo Box Width @ Wheelhousings (in): 42.3 Cargo Box (Area) Height (in): 33.2 Liftover Height (in): 25.2 Cargo Volume to Seat 1 (ft3): 68.6 Cargo Volume to Seat 2 (ft3): 34.3 + INTERIOR Reclining front bucket seats w / height adjustable head restraints 6 - way pwr driver seat Driver seat height adjustment (2000) Driver seat adjustable lumbar support Moquette cloth seat trim 60/40 split fold down rear bench seat Rear seat headrests on all seating positions Front / rear carpeted floor mats Tilt adjustable steering column Instrumentation - inc: digital dual - mode trip odometer, ambient temp gauge Tell - tale door ajar graphic display (2000) Pwr windows w / driver - side one - touch down feature Pwr door locks Remote keyless entry Cruise control Air conditioning Rear seat heat ducts Rear window defroster w / timer Electronic AM / FM stereo w / cassette - inc: (4) speakers, clock, weatherband Front 12 - volt pwr outlet & ashtray Woodgrain patterned dash 2 front / 2 rear cupholders Dual illuminated visor vanity mirrors Overhead console - inc: sunglass holder Lighting - inc: overhead map, glove box, cargo area, trunk Front seatback net pockets Cargo area 12 - volt pwr outlet Cargo area hooks Cargo area / trunk multibox storage tray Rubber cargo tray / mat Cargo area security cover Passenger Capacity: 5 Passenger Volume (ft3): 95.9 Total Cooling System Capacity (qts): 6.5 Front Head Room (in): 38.5 Front Leg Room (in): 43.3 Front Shoulder Room (in): 53.9 Front Hip Room (in): 51.3 Second Head Room (in): 37.2 Second Leg Room (in): 34.3 Second Shoulder Room (in): 53.6 Second Hip Room (in): 51.9 + SAFETY 4 - wheel anti-lock braking system (ABS) Driver & front passenger airbags (SRS) w / passenger dual stage deployment 3 - point seatbelts on all seating positions Height adjustable shoulder belts on front seating positions Child safety rear door locks Uniform child safety seat anchorage system Energy - absorbing collapsible steering column Front / rear 5 - mph impact - absorbing bumpers Side - impact door beams Daytime running lights + EPA Fuel Economy & Specification EPA Fuel Economy Est - City (MPG): 22 EPA Fuel Economy Est - Hwy (MPG): 27 Spare Wheel Size (in): - TBD - Spare Wheel Material: - TBD - Fuel Tank Capacity, Approx (gal): 16.9 Additional Photos Buyer Resources Contact Ebay Sales Department: for more information Toll - Free: (888) 762-4519 Request More Info Vehicle Condition Service History 113,287 Miles No Known Mechanical Problems Options & Features Ext / Int Color GRAYwith Interior Luxury Features Air ConditioningClimate Control SystemCruise ControlWood Trim Power Equipment Power Driver's SeatPower MirrorsPower SteeringPower Windows Safety Features All Wheel DriveChild Proof Door LocksDriver's Air BagFog LightsKeyless EntryPassenger Air BagRear Defogger Interior Carpeted Floor MatsClockCup HoldersOverhead ConsoleVanity Mirrors Exterior Body Side MoldingsOff Road TiresRear WipersRoof Rack Audio / Video AM / FMCassette Financing Information Contact us today for more information, or fill out our Online Credit Application to begin the pre-approval process today.
Carefully designed stowage areas under the load floor add extra capacity, while load rails help to secure contents in the luggage compartment.
Driver: 5; Colour: SILVER; SETS OF KEYS: 3;; This car comes with:; Climate Control; Cruise Control; Seats Heated (Driver / Passenger); Alloy Wheels (18in); Computer (Driver Information System); Electric Windows (Front / Rear); In Car Entertainment (Radio / CD Autochanger); Rain Sensor; Seats Electric (Driver);; Economy and performance:; Urban mpg31.0 mpg; Extra Urban mpg37.2 mpg; Average mpg34.9 mpg; CO2 emissions192g / km; Annual TaxGBP 280; Engine power208 bhp; Engine size3311 cc; Brochure Engine size3.3 litres; Acceleration (0 - 60mph) 7.6 seconds; Top speed124 mph; DrivetrainFour Wheel Drive;; Driver Convenience;; Seats Electric (Driver); Climate Control; Electric Windows (Front / Rear); Carpet; Adjustable Steering Column / Wheel; Steering Wheel Mounted Controls (Audio / Telephone); Upholstery Cloth; Seats Heated (Driver / Passenger); Armrest; Cruise Control; Speakers; Rain Sensor; In Car Entertainment (Radio / CD Autochanger); Seat Lumbar Support (Driver Electric);; Safety:; Head Restraints; Immobiliser; Anti-Lock Brakes; Power - Assisted Steering; Air Bag Knee; Seat Belt Pre-Tensioners; Front Fog Lights; Seat - ISOFIX Anchorage Point (Rear); Electronic Brake Force Distribution; Air Bag Passenger; Air Bag Side; Air Bag Driver; Central Door Locking; Deadlocks; Centre Rear Seat Belt; Head Air Bags; Traction Control System;; Exterior Features:; Alloy Wheels (18in); Spare Wheel; Roof Rails; Mirrors External (Electric / Heated / Folding / Auto Dimming);; Interior Features:; Power Socket; Computer (Driver Information System); Mirrors Internal;; Dimensions:; Height1720 mm; Height (inc. roof rails) No details available; Length4760 mm; Wheelbase2720 mm; Width1845 mm; Fuel tank65 litres; Luggage capacity (seats up) 900 litres; Luggage capacity (seats down) 1500 litres; Minimum kerb weight2000 kg;; We are Uk's leading Jap Performance Specialists and have taken this car as a part exchange against one of our retail cars hence it is priced LOW to sell QUICKLY WE NEED THE SPACE ON OUR SITE!!
The base price of the new Golf Estate in Germany, including ESP, six airbags, daytime running lights, roof railing, power windows all around, upshift indicator, power and heated outside mirrors, 1/3 to 2/3 split folding rear bench seat and seatback, central locking with RF remote control, climate control and 1,495 litres of cargo capacity is $ 18,500.
The base price of the new Golf Estate in Germany is $ 18,500, which includes ESP, six airbags, daytime running lights, roof railing, electric windows all around, upshift indicator, electrically adjustable and heated outside mirrors, 1/3 to 2/3 split folding rear bench seat and backrest, central locking with RF remote, climate control, 16 - inch wheels and up to 1,550 litres of cargo capacity.
«At the Spending Review we committed to the biggest rise in transport spending in a generation, with the north benefitting from major new investment, and now these new franchises are set to transform the connectivity, speed and capacity of rail services for families and businesses across the entire region.»
«He will also share his thoughts and opinion on a number of key issues for WTM participants that he has previously been heavily involved in, including plans to expand airport capacity in the south - east of England and the High Speed rail link.»
The brand new ticket office area at St. Pancras International was completed this month, and work has started at Lille Europe station where capacity is being increased in response to higher demand from passengers using the station to connect by high - speed rail across France.
a b c d e f g h i j k l m n o p q r s t u v w x y z