There's a flat registration fee and a certification fee, which is based on a project's size and
the rating system the project was registered under.
Not exact matches
A new report from Accenture Consulting, entitled Artificial Intelligence: Healthcare's New Nervous
System,
projects the market for health - related AI to grow at a compound annual growth
rate of 40 % through 2021 — to $ 6.6 billion, from around $ 600 million in 2014.
We fit linear regressions (all parameters had p < 0.05), to the data to predict the lifespan of the island
system (Fig. 4) using the historic land - loss
rate projected into the future.
Automated Binary is regarded as a highly accurate
system with a
projected accuracy
rating of 85 %.
I have used a fall in exports to show how constrained Beijing's policy choices are, but I could just have easily done the same using as an example any change in the currency regime, the reform of the hukou
system, the de-industrialization of the bankrupt northeast provinces, the development of the OBOR and Silk Road
projects, changes in interest
rates or minimum reserves, protecting the stock market from crashing, the provincial bond swaps, changes in the tax regime, improving energy and environmental policies, and so on.
[eg debt, fraud, disruption, obsolescence, operating leverage, high valuation, sovereign risk, regulatory risk, patent / lawsuit loss, closed credit markets,
systems failure, natural hazards, commodity price collapse / spike, debt re-financing, large risky acquisition, derivative / FX / interest
rate risks,
project risks, contract loss, brand damage etc].
The global market for membrane bioreactor
systems (MBRs) totaled $ 425.7 million in 2014 and is
projected to approach $ 777.7 million by 2019, registering a compound annual growth
rate (CAGR) of 12.8 % through 2019.
In the Solutions
Project study that's been out now for a couple years now, shows we would create 4.5 million jobs building that
system out and it would cut electric
rates in half.
New research to re-examine distribution
system leak
rates has been funded by the Environmental Defense Fund as part of a larger
project to quantify lost methane from the natural gas
system.
«These new results imply the current - day impact
rates for small particles at Saturn are about the same as those at Earth — two very different neighborhoods in our solar
system — and this is exciting to see,» said Linda Spilker, Cassini
project scientist at NASA's Jet Propulsion Laboratory in Pasadena, Calif. «It took Saturn's rings acting like a giant meteoroid detector — 100 times the surface area of the Earth — and Cassini's long - term tour of the Saturn
system to address this question.»
Given those findings and the rest of the improved understanding of the climate
system, the IPCC
projects that if carbon dioxide gas emissions — the primary cause of warming — continue to grow at the recent
rate, the world would warm 2oC above 19th - century levels by the middle of this century.
I am also interested in musculoskeletal
system trade - offs during evolution of body size, and I have
projects which are analyzing musculoskeletal
system growth and differentiation
rate variation in divergent fish populations reared under «common garden» environments.
But the
system of multiple plans is too complicated and difficult to navigate, default
rates remain stubbornly high, and the latest estimates
project significant long - term costs to taxpayers.
It also plans to develop a
rating system so teachers can evaluate each other's curriculum and
project ideas.
A recent study of the Chicago school
system by the New Teacher
Project (2007) found that 87 percent of the city's 600 schools, including 69 schools that the city declared to be failing, did not issue a single «unsatisfactory» teacher
rating between 2003 and 2006.
Scott Syverson, talent manager for The New Teacher
Project, which worked with three RISE pilot districts in Indiana last year, said the
system's biggest challenge was deciding where teachers fall on the four - step
rating scale.
Students are eligible for the program if the student's resident district is not a school district in which the pilot
project scholarship program is operating and the student satisfies one of the following conditions: the student attends a local public school that has received a grade D or F by the state's performance index score, the student is assigned to a community school but would otherwise be assigned to a qualifying school, the student attends a local public school that was ranked in the lowest 10 percent of public schools in two of the three most recent rankings and the public school was not declared to be excellent or effective in the most recent
rating system, or the student is enrolling in grades K — 12 for the first time and would be assigned to a qualifying school as long as they are at least 5 years old by Jan. 1 of the school year.
The Milwaukee Parental Choice Program is
projected to add $ 500 million in economic benefits to the city through higher graduation
rates and lower interaction with the criminal justice
system.
In 2009, The New Teacher
Project (TNTP) published «The Widget Effect,» which found that fewer than 1 percent of teachers were receiving unsatisfactory
ratings, even in
systems where student outcomes were abysmal.
One reason D.C.'s education reforms attracted significant attention across the country was their timing: DCPS started using IMPACT to evaluate teachers during the 2009 — 2010 school year, just as the education reform organization The New Teacher
Project (TNTP) released a report recommending that districts develop evaluation
systems that
rate teachers «based on their effectiveness in promoting student achievement.»
For the prekindergarten program alone, they identified $ 92,220 in present value benefits and $ 8,512 in present value costs in 2007 dollars — a benefit - cost ratio of 10.83 to 1.22 The benefits derived mainly from reduced public education expenditures due to lower grade retention and use of special education, reduced costs to the criminal justice
system and victims of crime due to lower crime
rates, reduced expenditures on child welfare due to less child abuse and neglect, higher
projected earnings of center participants, and increased income tax revenue due to
projected higher lifetime earnings of center participants.
The cost of the total
project is still being tallied, but the school
system will pay Imagine $ 8,000 per student annually, totaling $ 2.12 million for the first year, which is the Maryland Department of Education's standard
rate for charter school funding.
Notwithstanding subparagraph (A), in a case in which the Federal credit instrument is the senior debt, the Federal credit instrument shall be required to receive an investment grade
rating from at least 2
rating agencies, unless the credit instrument is for a rural infrastructure
project or intelligent transportation
systems project, in which case 1
rating agency opinion shall be sufficient.
a
rating from at least 2
rating agencies on the Federal credit instrument, subject to the condition that, with respect to clause (iii), if the senior debt and Federal credit instrument is for an amount less than $ 75,000,000 or for a rural infrastructure
project or intelligent transportation
systems project, 1
rating agency opinion for each of the senior debt and Federal credit instrument shall be sufficient.
In order to expedite a
project under this subsection, the Secretary shall, to the maximum extent practicable, issue letters of intent and enter into early
systems work agreements upon issuance of a record of decision for
projects that receive an overall
project rating of medium or better.
The new powertrain
system improves fuel economy by 30 percent with a
projected EPA
rating of 27 MPG city and 36 on the highway.
Some of these enhancements will include the new Android Voice search capabilities, Google Now, improved
system wide frame
rate via
Project Butter, enhanced notifications, a resizable pop - up play menu, and also a tweaked settings menu.
To do that, Google embarked on
Project Butter, which increases the
system frame
rate to a smooth 60 frames per second and uses touch input boost to anticipate finger touches and improve responsiveness.
Among other things, the
project improves the
system frame
rate to make it consistent at 60 frames per second and includes a power - saving measure that dials back a device's CPU to a lower frequency and then ramps up when a user touches the screen.
Dr. Wouter Hensens,
Project Director for Exceed Hospitality who facilitated the project, He thinks that the continuous growth and influence of online review platforms in hotel buying decisions needs to be acknowledged in hotel rating systems: «Current classification systems are often dysfunctional as they are voluntary; more and more hotels decide to let go of them and rely solely on online feedback.
Project Director for Exceed Hospitality who facilitated the
project, He thinks that the continuous growth and influence of online review platforms in hotel buying decisions needs to be acknowledged in hotel rating systems: «Current classification systems are often dysfunctional as they are voluntary; more and more hotels decide to let go of them and rely solely on online feedback.
project, He thinks that the continuous growth and influence of online review platforms in hotel buying decisions needs to be acknowledged in hotel
rating systems: «Current classification
systems are often dysfunctional as they are voluntary; more and more hotels decide to let go of them and rely solely on online feedback.»
Forza will need to follow GT Sport and
Project Cars 2 in copying iRacing's safety
rating system if it's ever going to solve this issue.
From its unique pairing
system, which matches
projects to candidates with the highest
rated work, to its assurance of a wide variety of opportunities and high pay, when it comes to connecting with new clients, Upwork should definitely be on your list.
He brought up Droitcour's Yelp
project, in which the writer
rated art spaces on a star
system and wrote short reviews as institutional critique.
Many countries have found these prospects to be very challenging, and many have argued that the
rates of population aging and population decline that is
projected for many European and other very low fertility countries is not sustainable: it implies rather insurmountable problems for social security and other transfer
systems, and it may lead to declines in well - being as a result of lower productivity and incomes.
Eleven research
projects are detailed, including: efficient duct
systems; rain and groundwater management; humidity control
systems; foundation insulation
systems; drying
rates of building assemblies; climatically - tuned building materials; right - sized air conditioning; solar dehumidification; conditioning
systems and control; and advanced framing.
This guidance helps
project teams select a LEED
rating system.
Green Business Certification Inc. (GBCI) provides
project certification to the requirements of the SITES v2
Rating System.
The goal, as with similar crosswalk documents describing equivalencies between
rating systems (see New Report Helps Leverage the Overlap between WELL and LEED), is to simplify the certification process by reducing the amount of documentation
project teams must do to demonstrate compliance.
However, when the decision is not clear, it is the responsibility of the
project team to make a reasonable decision in selecting a
rating system before registering their
project.
Projects are required to use the
rating system that is most appropriate.
Visit the GBCI Certification Work Zone to meet one - on - one with reviewers and assessors and discuss questions about specific
projects or about
rating system requirements.
To address these challenges, the Molecular and Nanoscale Interfaces
Project aims to couple light absorbers, catalysts, and half - reactions for optimal control of the
rate, yield, and energetics of electron and proton flow at the nanoscale, so that complete macroscale artificial photosynthetic
systems can achieve maximum conversion of solar photon energy into the chemical energy of a fuel.
Homeowners Anne and Patrick Jordan's ambitious upgrade and extension
project in County Kildare took the shell of an 18th century farmhouse and transformed it into an elegant family home with a striking - yet - sensitive modern extension — all while embracing a healthy and fabric - first approach to retrofit combined with clever heating
system design that has brought them from a G to an A3
rating.
The
project was designed to meet the requirements of multiple green building
rating systems, including
The
project team leader should confirm that LEED ND is the most suitable LEED
rating system for the
project.
Some
projects pursue LEED ND as well as several LEED building
rating systems simultaneously.
The
rating system can require expertise in many professions, depending on
project characteristics and credits attempted.
An optimal
system size is realized when the
project's LCOE is equal to the prevailing utility
rate.
Assuming a hypothetical PPA that would allow the Parkers to purchase the energy produced by their solar
system at a
rate of $ 0.06 per kWh, with a 2 % annual escalation over a 20 - year contract, the solar
project looks a lot more appealing.
«The reimbursement
rate should be changed from the retail
rate to the
rate the utility pays for wholesale solar generation from utility - scale
projects connected to its distribution
system,» argued Tucson Electric Power Energy Supply Senior Director Carmine Tilghman recently.