Sentences with phrase «reach production until»

«More advanced pieces might not reach production until 2016 or 2017.»

Not exact matches

SolarCity currently does not expect the Gigafactory 2 to reach one gigawatt of solar - module production until 2019.
In a statement to the press, Tesla noted, «Until we reach full production, by definition some elements of the production process will be more manual.»
On a call with shareholders in February 2015, Lyndon delayed the timeline: The factory, he indicated, would now be built and ready for equipment by early 2016 (while that one - gigawatt production target wouldn't be reached until the first quarter of 2017).
SolarCity now doesn't expect the Gigafactory 2 to reach one gigawatt of solar - module production until 2019.
Food miles is a term which refers to the distance food is transported from the time of its production until it reaches the consumer.
However, the populations of the methanotrophs will always lag behind the rate of methane production until equilibrium is reached.
The production contains enough positive elements to make it worth a look, but not until it reaches DVD or TV.
To clarify something... the drivetrain is made so if you are requiring the car to go quicker (pressing the accelerator pedal harder), the transmission will hold the gear until it reaches a fail safe shift point (a point at which is predetermined if you go over «this point» it will cause damage to your drivetrain — this is on most stock production vehicles) or until you ease off the accelerator pedal, which tells the powertrain you no longer need to try and go quicker.
He adds that cost and all performance features must be on a par with those of gasoline - powered vehicles, but that point will not be reached until «full - fledged mass production begins in 2025, after a hydrogen refueling infrastructure is in place.
You will have some time to wait until the new roadster reaches customers stateside this summer, as the 2016 Mazda MX - 5 Miata only recently started production for Japanese deliveries.
Volkswagen originally showed the Golf Alltrack as a thinly disguised concept at the 2015 New York auto show, but it took until now for the model to reach production - ready status.
We don't have any information on when this model will reach production, but we do know that Mitsubishi has delayed its plug - in hybrid version of the Outlander crossover for the U.S. until 2015, so it may take a while.
VW officially took the reins in 1998, but production changes didn't reach the Diablo until the VT 6.0 and 6.0 SE versions.
The clusters I worked with were resettable until the odometer reached 50 miles or so (can't remember the exact figure), which made it possible to do away with any racked up mileage from the production process.
Beautifully - styled inside and out, the I.D. Buzz probably has higher chances of actually reaching production than previous VW bus concepts, but we're not holding our breath - VW's real electric mobility push won't start until 2020 and it'll be 2025 before they're selling in any real volume - and something more akin to the regular I.D. concept will likely take priority in those plans.
The B12 Nissan Sentra chassis first saw production in 1985 in most parts of the world, but did not reach the U.S. until 1986.
On June 30, 2016, Toyota confirmed that the Ractis reached the end of production for Japanese, Hong Kong and Macau markets, but the Verso - S continued to be produced for European markets until early 2017.
Sixty Special would only reach 5,700 units for 1946, as it did not go into production until later in the model year.
Mazda's 100th anniversary isn't until 2020, but 2016 has turned out to be a year of celebration for the Japanese automaker as it commemorates reaching 1 million production units for the iconic MX - 5 Miata.
Q3: The new small crossover goes into production next year but won't reach the United States until 2013.
We imagine it won't be until Jaguar has fully launched the I - Pace and production reaches cruising speed, so we wouldn't bet on seeing it next year — at least not as a production model.
Waiting for production of the H2 automatic transmission variants to reach Australia had delayed the local launch of the brand until now.
Overall, the C in BRIC will grow its total renewable production capacity to reach 2,000 terawatt - hours (TwH) from now until 2035.
Simply stated — the mere fact that the largest on - shore US discovery of the most desirable type oil existed right underneath the center of America's oil industry and within easy reach of production and transport means until it was cultivated.
«Billions of dollars they would have spent on offshore wells are now being tabled until prices recover, and these regulations will make it harder for offshore production to reach its potential.»
Darren thinks that it will take about 10 years before the garden matures and about 20 years until they reach peak production and a full understanding of the site.
Production in the other four regions did not reach significant levels until the 1980s and 1990s.
All cases assume a slowing rate of increase in production until a peak is reached in 2015, 2025 and 2030, respectively, followed by a 5 - year plateau and subsequent decline.
a b c d e f g h i j k l m n o p q r s t u v w x y z