In July, California municipal
utility Glendale Water & Power (GWP) connected a 2MW / 950kWh battery energy storage system (BESS) at an
electrical substation, designed to be able to
regulate the transmission network and balance load, but also capable of providing black starts to generators on its network that have gone offline in unscheduled events.