Existing research on the effectiveness of early childhood programs largely focuses on short - term academic gains when it is long - term benefits that provide a more
relevant measure of value.
Not exact matches
By focusing on
value firms, the benefits to financial statement analysis (1) are investigated in an environment where historical financial reports represent both the best and most
relevant source
of information about the firm's financial condition and (2) are maximized through the selection
of relevant financial
measures given the underlying economic characteristics
of these high BM firms.
Participants considered each NPOESS -
measured parameter, starting with ones in jeopardy
of not meeting Integrated Operational Requirements Document (IORD) specifications, commenting on the relevance
of the parameter to climate science and / or long - term climate records, the importance
of maintaining the IORD - level
value (and potential consequences if it is not met), and noting any additional considerations required to make the NPOESS program's environmental data records (EDRs) more
relevant to GCOS ECV climate parameters and to the climate community as a whole (e.g., additional instrument characterization, calibration, overlap requirements).
Coordination
of project controls activities - project schedule and costs Support the planning activity
of the project Identify counteractive
measures in case
of negative performances Plan and forecast — continuous monthly rolling forecast for project, cost, time and scope Support the preparation
of cost estimates and produce accurate and unbiased cost forecasts at a detailed and summary level Preparation and update
of project documentation (PEP, Project Controls Plan etc.) Documentation
of the projects concerning approvals, release, planned and actual
value Support the project manager to secure resource requirements Assist in development and train the
relevant staff in project controls topics
In addition, since from a practical - clinical perspective effect sizes are the most
relevant objective
of the analyses, and due to the fact that p -
values are strongly dependent on sample size, all effect sizes for the relationships analyzed have been estimated by the confidence interval for the parameters, with the R2
measuring the global predictive capacity
of the models (adjusted to the covariates).