Sentences with phrase «removed during installation»

Not exact matches

In the Ropac Gallery installation, all electrical lights were removed and the frames were painted with two layers of phosphorescent paint that absorbed light during the day and emitted it at night.
The anti-bubble silicone adhesive layer removes bubbles during installation process.
PUPs are easy to miss during the free - software installation process, can sometimes be harmful and are almost always hard to remove.
One button removal makes it easier to remove and direct installation removes any obstacles during putting it on.
In case the ODIN app gets stuck or the phone freezes during the installation of XXUBMJ3 root process, then you should unplug the phone from, PC and remove its battery.
• Bolted, clamped and welded (horizontally and overhead) metal components of plates, pipes and tubes, using arc gas welding equipment • Kept work area waste free and stowed materials and equipment in an orderly manner • Installed and tested pipes according to specifications and cleaned weld joints using portable grinder and chemical bath • Repaired leaks and filled holes and cracks; also removed defective weld material and slag using carbon arc gouge and power chipper • Maintained tools and assisted in positioning and securing work pieces during installations
• Track record of efficiently preparing worksites by removing hazardous materials and debris • Proven ability to fashion track lengths according to set standards and specifications • Hands - on experience in inspecting tracks to determine need for repair and maintenance • Familiar with replace, remove and repair tracks and related components to ensure smooth railroad operations • Effectively able to handle drilling duties to insert bolts and joints and perform preventative maintenance on tracks and components • Highly skilled in gauging deviations in track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bearings
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z