•
Bolted, clamped and welded (horizontally and overhead) metal components of plates, pipes and tubes, using arc gas welding equipment • Kept work area waste free and stowed materials and equipment in an orderly manner • Installed and tested pipes according to specifications and cleaned weld joints using portable grinder and chemical bath •
Repaired leaks and filled
holes and cracks; also removed defective weld material and slag using carbon arc gouge and power chipper • Maintained tools and assisted in positioning and securing work pieces during installations